版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
1、 note: please remove this page when creating a post-implementation review of business outcomes deliverable. post-implementation review of business outcomes template project delivery framework post-implementation review of business outcomes agency/organization name project name version: version numbe
2、rrevision date: date approval of the post-implementation review of business outcomes indicates an understanding and acceptance of the post-implementation results described in this deliverable. by signing this deliverable, each individual agrees the information accurately conveys project delivery res
3、ults and is ready to be forwarded to the quality assurance team. agency head nameemailtelephone signature:date: executive sponsor nameemailtelephone signature:date: technology sponsor nameemail telephone signature:date: project manager nameemailtelephone signature:date: information security officer
4、nameemailtelephone signature:date: agency/organization namepost-implementation review of business outcomes project nameversion number | revision date page i contents section 1.project impact on agency objectives.1 1.1product and/or service performance .1 1.2goals and objectives .1 section 2.quantita
5、tive and qualitative benefits .1 2.1statutory fulfillment.1 2.2strategic alignment .2 2.3agency impact analysis .3 2.4financial analysis.4 section 3.project outcomes.5 3.1project quality .5 3.2scope .5 3.3cost (budget) .6 3.4schedule.6 section 4.agency and state lessons learned.6 section 5.future re
6、view plans .7 section 6.glossary .7 section 7.revision history.7 section 8.appendices.7 agency/organization namepost-implementation review of business outcomes project nameversion number | revision date page 1 section 1. project impact on agency objectives 1.1product and/or service performance busin
7、ess goals and objectives were described in the business case and refined in the project plan by establishing performance objectives, standards, and measurements for the product and/or service. describe the actual performance measurement results achieved for each performance objective. product and/or
8、 service performance objective performance standard actual performance measurement results 1.2goals and objectives based on actual performance measurement results, describe the projects impact on the agencys ability to meet the business goals and objectives described in the business case and refined
9、 in the project plan. if the stated business goals and objectives were not met, include factors that inhibited performance in the project impact description. business goal/objective product and/or service performance objective project impact to business outcome section 2. quantitative and qualitativ
10、e benefits 2.1statutory fulfillment for each of the factors identified and described in section 5 of the business case, and shown below, describe the projects impact on the agencys ability to fulfill statute and other mandates. if a value factor is not applicable to the project, state “not applicabl
11、e.” if applicable, include reasons that inhibited achieving the expected benefit in the project impact description. #value factorproject impact to business outcome 1the project is implemented to satisfy a direct mandate or regulation (state, federal, national, international) agency/organization name
12、post-implementation review of business outcomes project nameversion number | revision date page 2 #value factorproject impact to business outcome 2the project is implemented to satisfy a derived mandate or regulation (state, federal, national, international) 3implementing the project improves the tu
13、rnaround time for responses to mandates or regulatory requirements 4the project results in agency compliance to mandates or regulatory requirements 5the project results in agency avoidance of enforcement actions (e.g., penalties) based on mandates or regulatory requirements 6implementing the project
14、 achieves the desired intent or expected outcomes of the mandates or regulatory requirements 7implementing the project imposes stricter requirements, or different or additional requirements, than those required by the mandates or regulations 8other 9other 10other 11other 2.2strategic alignment for e
15、ach of the factors identified and described in section 5 of the business case, and shown below, describe the projects impact on the ability to deliver a technology solution aligned with the agencys and the states strategic goals and objectives. if a value factor is not applicable to the project, sta
16、te “not applicable.” if applicable, include reasons that inhibited achieving the expected benefit in the project impact description. #value factorproject impact to business outcome 1the project is aligned with, and delivers business outcomes, that support agency and statewide goals 2the project sati
17、sfies a strategic agency or state mission critical need, regardless if required by a mandate or regulation 3the project results in the ability of the agency or state to better share resources with other agencies or states as part of a long-term strategic alignment effort 4the project is aligned with
18、 the overall mission of the agency and state agency/organization namepost-implementation review of business outcomes project nameversion number | revision date page 3 #value factorproject impact to business outcome 5the project strategically consolidates and streamlines business practices and admini
19、strative processes 6the project is aligned with the overall vision of the agency and state 7the project is aligned with the overall priorities of the agency and state 8other 9other 10other 11other 2.3agency impact analysis for each of the factors identified and described in section 5 of the business
20、 case, and shown below, describe the projects impact on the ability to deliver a technology solution that supports the agencys architecture and standards. if a value factor is not applicable to the project, state “not applicable.” if applicable, include reasons that inhibited achieving the expected
21、benefit in the project impact description. #value factorproject impact to business outcome 1the project results in systems which support the defined architecture/standards for the agency and state 2the project results in systems which reduce or eliminate redundant systems 3the project results in sys
22、tems which enable reuse of code/components available from other state or federal agencies 4the project results in systems which improve consistency between systems within the agency through standardization 5the project results in systems which leverage the technical capability of commercial-off-the-
23、shelf (cots) software packages 6the project results in systems which provide the ability to evolve as new technologies emerge 7other 8other 9other 10other agency/organization namepost-implementation review of business outcomes project nameversion number | revision date page 4 2.4financial analysis f
24、or each of the factors that represent the projects quantitative benefits, identify and quantify the benefits realized to date. provide a forecast of the benefits not yet realized. identify the specific time period (mm-yy) encompassed by the realized and forecasted benefits. if a factor is not applic
25、able to the project, state “not applicable.” realized time periodforecasted time period toto #value factorrealizedforecasted identify cumulative savings 1reduced it and non-it fte costs including fringe benefits 2reduced it and non-it contractors/consultants 3reduced outsourced labor costs 4improved
26、 workflow/business processes 5reduced error rate 6reduced hardware maintenance/upgrade expense 7reduced software maintenance/upgrade expense 8reduced facilities rental/maintenance expense 9reduced equipment rental/supplies and materials expense 10other identify cost avoidance 11avoid penalties 12avo
27、id loss of funding 13improved enforcement actions 14asset protection 15other identify revenue generation 16additional revenue generated 17increased interest earned 18other identify constituent project benefits 19reduced constituent transaction costs 20reduced service delivery cycle time 21increased
28、service availability/accessibility agency/organization namepost-implementation review of business outcomes project nameversion number | revision date page 5 #value factorrealizedforecasted 22expansion of services 23reduced (paper) reporting requirements 24improved ability to locate regulatory requir
29、ements 25improved accountability/compliance 26greater consistency in constituent/state transactions 27other general questions regarding financial forecast: 28will the net present value exceed 0? if so, by how much? 29when is the expected project breakeven point? 30what is the projects expected retur
30、n on investment? section 3. project outcomes 3.1project quality 3.1.1quality standards summarize the overall project quality, including the impact on business outcomes, based on an assessment of whether the project satisfied the quality standards defined for the project. = 3.1.2methodologies summari
31、ze which aspects of the planned methods were used and explain the impact of using or not using each method on project outcomes, including the impact of using the defined project life cycle methodology, project management methodology, systems development methodology, or other methodologies on project
32、 outcomes. = 3.2scope summarize the impact of any changes to the initial project scope on business outcomes, including approved and non-approved changes. = agency/organization namepost-implementation review of business outcomes project nameversion number | revision date page 6 3.3cost (budget) ident
33、ify the initial estimated and final project costs. project itemreport to date initial estimated project cost project cost to date (fiscal) project cost to date (total) summarize the impact of any changes to the initial cost baseline on business outcomes, including approved and non-approved changes.
34、= 3.4schedule identify the initial planned project start and finish dates. identify the final project start and finish dates. project itemreport to date initial planned project start and finish datesbaseline date: final project start and finish datesbaseline date summarize the impact of any changes to the initial schedule baseline on business outcomes, including approved and non-approved changes. = section 4. agency and state lessons learned state lessons learned in terms of a problem (issue). describe the problem and include any agency/state-level references (e.g.
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 吉林省長春市南關(guān)區(qū)2024-2025學(xué)年八年級上學(xué)期10月期中生物試題(含答案)
- 低空經(jīng)濟產(chǎn)業(yè)園時間安排方案
- 贛南師范大學(xué)《電視名專欄研究》2022-2023學(xué)年第一學(xué)期期末試卷
- 阜陽師范大學(xué)《音樂學(xué)科課程與教學(xué)技能實訓(xùn)》2022-2023學(xué)年第一學(xué)期期末試卷
- 阜陽師范大學(xué)《公共工程項目管理》2022-2023學(xué)年第一學(xué)期期末試卷
- 福建師范大學(xué)協(xié)和學(xué)院《國際服務(wù)貿(mào)易》2021-2022學(xué)年第一學(xué)期期末試卷
- 福建師范大學(xué)《寫意花鳥畫》2023-2024學(xué)年第一學(xué)期期末試卷
- 福建師范大學(xué)《課堂教學(xué)技能》2022-2023學(xué)年第一學(xué)期期末試卷
- 第8章 SOPC技術(shù)開發(fā)概述課件
- 檔案交接文據(jù)(歸檔)
- 江蘇生產(chǎn)性服務(wù)業(yè)現(xiàn)狀、問題及對策分析
- 小學(xué)科學(xué)課堂教學(xué)評價表(共1頁)
- (完整版)軟件維護明細
- 梯形螺紋基本尺寸
- LTE學(xué)習(xí)總結(jié)-后臺操作-LMT的使用
- 小學(xué)六年級語文培優(yōu)補差活動記錄(共22頁)
- 二次雷達探測性能和數(shù)據(jù)質(zhì)量評估方法
- 初中一次函數(shù)課標
- 溫縣電子商務(wù)公共服務(wù)中心PPT課件
- “可燃冰”的三大懸疑
- 招商銀行在職證明
評論
0/150
提交評論