1、沈陽(yáng)工業(yè)大學(xué)化工裝備學(xué)院畢業(yè)設(shè)計(jì)(論文)外文翻譯畢業(yè)設(shè)計(jì)(論文)題目:含硫氨污水冷卻器 外文題目: head processing technology 譯文題目:封頭加工工藝 院 (系):化工裝備學(xué)院專業(yè)班級(jí):過控0802班 學(xué)生姓名:孫鵬博 指導(dǎo)教師:閆小波 2012年 3月 11日 head processing technology1.welding process1.1welding operationour factory common welding methods are: manual welding, argon arc welding, submerged arc wel
2、ding.(1) manual welding is mainly used for carbon steel 3-6mm plate welding.(2) submerged arc welding to more than 8mm carbon steel stainless steel sheet welding mainly.(3)3-6mm stainless steel argon arc welding with welding mainly.commonly used stainless steel wire er304and er316l steel wire, commo
3、nly used to j422and j507and j426and j427low-temperature welding consumables. flux of carbon steel used is the hj431, stainless steel commonly used is hj260,.as a result of welding wire flux can be easily affected with damp, stored in the infrared drying machine, flux hj431and hj260drying temperature
4、 is 250-300. welding wire j422and j350drying temperature were 150 and 300 welding process is completely in accordance with the" welding" execution, sheet thickness determines the welding to welding or double sided arc welding in welding, after the weld seam inspection ( rt x ray ) judgment
5、 without pores, cracks and other defects, such as found in the above deficiencies, to the repair, until the filming.1.2 welding operation standard(1) welding procedure card after receiving process, affirm the process card and physical material, quantity, unit number, specifications, size instruction
6、 number is consistent, whether there is debris around the wafer, wafer splashes whether clean removal, such as treatment is not clean, will use the grinding clean.(2) there is no welding test plate, groove cutting quality can meet the requirement, material surface without obvious defects, such as ab
7、normal response.(3) according to the" regulations" welding procedure card check of welding groove type and dimensions correspond to.(4) on each side of groove surface grinding, butt edge offset is not greater than the10% thickness, and not more than1.5mm.(5) point fixed the first weld laye
8、r terminal welding length not less than 50mm, arc board specifications should be 150*150mm and a mask having r arc, team rounds should be given within 8 hours of welding, or to use flame to the moisture inside the baking groove.(6) the welder holds" welding" and" welding records"
9、 for welding consumables, welding two class library for registration, using flux field volume should not exceed 4 hours, or to continue to back into the oven drying.(7) a, preheating plate thickness not less than 30mm carbon steel, low alloy steel, the preheating temperature of welding process by&qu
10、ot; card"," standard" provisions of the welding technology.b, preheating range width not less than 4mm and no less than 100mm.c, in the process of welding groove at any time temperature shall not be less than the prescribed temperature.d, when welding temperature is below 0 ( arbitrar
11、y thickness) must be heated to 15 or above in order to welding.(8) a before welding, welding to welding equipment inspection, examination was normal before welding facilities.according to b,"" the requirements of welding process welding, welding and fill in the recordsc, welding, welding l
12、ayers shall be in accordance with" welding" requirements, welding shall not be a large current, less layers.(9) removal of the root a, stainless steel cleaning before the root groove sides, within the range of 300mm, splashing paint coating.b, using carbon arc air gouging, should be select
13、ed according to the request carbon rod diameter.c, root cleaning, grinding cleaning groove and two side the existence of carburized layer, oxide, slag and other sundries. grinding width: manual welding, rust, oxide above 20mm, oil30mm above, automatic welding, rust, grease, oxides 25mm50mm groove in
14、ner grinding requirements, carbon steel, low alloy steeln 10mm weld, its two ends within the range of 300mm carburized layer must be completely removed, the rest part allows the removal of more than 50%. other non-ferrous metals must be completely clear. 3d, root cleaning, composite steel cr-mo, man
15、ual welding and the thickness ofn 30mm welds shall be examined by pt.(10) during the process of welding defect repair by welding repair welding repair monitor instruction experienced welders as. repair welding process should eliminate soldering phenomenon, or polished after welding, the following de
16、fects must be removed before welding to welding crack,partialpits the stomaa shall not be lower than the parent material, weld.b, there shall be no undercutting.c, without removing the residual high seam. the surface shall not have cracks, pores, crater, undercut and slag inclusions, and may not ret
17、ain the slag and spatter.d, removal of residual high weld inspection shall not have any defect display pt.e, such as the defects of carbon steel, low-alloy steel repair procedures: a grinding wheel or a carbon arc gouging polishing cleaning pt check grinder grinding out the welding groove, welding,
18、pt, stainless steel repair procedures: a grinding wheel or a carbon arc gouging polishing cleaningpt ( n 2mm need )grinder polished to a welding groove welding pt examination. 4(12) welded internal rework, repair procedures: location of defect, defect removal ptremoval check welding weld pt examinat
19、ion. 5(13) according to rt film, rt staff and the welders in welding seam together determine the location of defects, including the following requirements when using ut to determine the defect position, the first repair n 30mm use ut to determine the location of defects, two or three repair n 20mm u
20、sing ut to determine the defect position, ut positioning by rt after class. the position and depth of defect ( calibration side shall be the depth of defect1/2 side).(14) after the welding inspector or monitor by confirmed, in the process card signed your name and object together with transfer to th
21、e next process, by the next process responsibility recognition can.2.stamping process2.1stamping operationstamping operation is small head forming an important operation. the same stamping is also head of the cracking, thinning appeared most process section.2.2punching machine.(1) the master cylinde
22、r is mainly used to connect the die head, is the head forming the necessary parts.(2) side cylinder used for pressing die ring, fixing the upper and lower mold ring of head disk. the head in the pressing process is to prevent the crease, as an important part of the drum kit.(3) the overflow valve us
23、ed for controlling the compressor overall pressure, prevent the wafer during the pressing process of tears.(4) stamping valve in pressure, stamping valve on pressure relief, achieve average pressure effect.in addition, circuit boards, motors, circuit boards, storage tank, operation platform, pedesta
24、l are stamping machine components.2.3.3 stamping operation steps(1) first of all to undertake a blanking process card, find a good wafer.(2) the control process card on the technological requirements, put on a set of corresponding die, and with the use of gauges to determine the selected die size an
25、d to suppress the wafer size.(3) the wafer is clamped on the upper and lower mold inside the circle, and determine the die head of the center point and the center point of the wafer in a straight line.(4) the operation ring mold and die relative motion, pressure test, according to the control rod re
26、bound to judge the size of the pressure, thereby regulating pressure size.(5) pressure test end, pressed wafer, stamping.2.3the stamping operation standard(1) the control task orders, confirm physical and process card is consistent, according to the process card confirming workpiece number, material
27、, specification, batch number and other factors, at the same time check wafer end there is no crack, burr, polished wafer whether it meets the requirements, whether chamfer, is facing the good, there are special requirements when the problem is found, in time to contact.(2) according to the process
28、card correct selection of die mold surface, inspection, found bruises and serious injury must be polished, but must be clean mold surface corrosion and dirt.(3) according to the technology card size, shape, texture, straight edge higher to suppress.(4) the warm-stamping ( according to requirement sh
29、eet property is heated to a certain temperature, and then stamping process ), to prepare a baking gun, gas, oxygen, percussion with head shall prepare the corresponding template, double-sided film to the wafer edge of both sides in a range of about 200-300mm template removal, and clear the film surf
30、ace. 6(5) mounted on the lower die, as the case to join the die pad, the wafer inside and outside surface coated with oil, applied range of top to200-300mm, smear should be uniform, the upper and lower mold are evenly coated.(6) the first gold stamping head, hanging out with a model head, check sect
31、ion shape, at the same time, check whether the drum kit, and there is no thinning, and check the surface has no scratch, hoop printing, such as none of the above abnormalities can continue to stamping, head forming, sealing surfaces such as scratches are timely grinding, and confirm the minimum boar
32、d thickness, confirm whether a scratch, strain, curved peel, orange peel, drum kits, wrinkle, hoop printing etc.(7) such as a head drum kit fold phenomenon should be together with the card with the move to rework process technology.(8) each head should be able to see the instruction, piece number, m
33、aterial, or to transplantation, each product specifications after testing, the process card ( to sign the name ) together to the next process, by the next process validation.3.pressure drum process3.1pressure drum operationpressure drum process and stamping processes are the same steps in the proces
34、s, stamping process range of 159- 1900mm and pressure drum process is in the range of 1600- 4800mm. and stamping is different pressure drum mostly the head generally forming, eventually forming is completed by spinning, stamping without the special requirements of customers, eventually forming step
35、is not required. 1600- 1900mm heads the two processes is needed.3.2pressure drum machine.(1) the main cylinder is provided with an upper die head is pressed drum execution as long as part of.(2) supporting seat fixed lower die and upper die head center in a straight line.(3) supporting frame1is prov
36、ided with a rolling wheel, a position adjusting before and after.(4) supporting frame is provided with a rolling wheel rotating disk ii.in addition, there are hydraulic system, the motor, oil pump, oil tank, and a control console.3.3pressure drum machine operation steps(1) first of all to undertake
37、a blanking process card, find a good wafer.(2) the control process card on the technological requirements, put on a set of corresponding die, and with the use of gauges to determine the selected die size and to suppress the wafer size.(3) and stamping machine is different from the original film is n
38、ot pressure drum center began to suppress, but from the wafer edge, as long as the die and wafer alignment on the line.(4) the pressing process is continuously by controlling the rotation wheel is driven by the rotation of a wafer rotating, according to a certain order to suppress.(5) in after the p
39、ressing process, prepared template matching. if a deviation to make further adjustments.3.4pressure drum operation standard(1) die on the quality of the products and the smooth pressure drum forming crucial. therefore, require that the operator must according to the processing situation of choice fo
40、r mold and timely adjust shim plate.(2) the operator receives the process card, see process card, according to the process card check objects, to confirm the real instruction, one-piece, material. number, batch number etc. according to the choice of mold process card.(3) for eha, ehb head shapes hav
41、e adopted the 0.82*d standard selection, for dhb, psh, md and other special products according to technology card selection of mold, but in principle according to p*0.82/1.15or p*0.82/1.2 standard selection. 1(4) pressing carefully before inspection wafer quality, no seam wafer end is smooth, there
42、is no gap, surface has no cutting slag and defects.(5) a weld in addition to carefully check the end of the wafer wafer defects, at the same time should be checked for weld seam is higher than that of base metal, weld ends of are welding spatter, weld end grinding smooth, there is no crack notch.(6)
43、 two or two or more superimposed when pressed, each slice of the joint surface should be clean, according to the circumstances must entrust welding class, the wafer is welded together to suppress.(7) detection of wafer thickness ( the thickest, most thin, whether and process card, measurement of waf
44、er size and process card.(8) suppression must be removed before the inside and outside surface of all debris, to prevent pitting appeared.(9) for general stainless steel materials ( more than 5mm plate ) using teflon plate mold and the lower mold dressing on surface polished smooth ( necessary nowad
45、ays mold to teflon plate. ) to ensure the surface quality of the workpiece, while in the process of the pressing need to avoid debris into molds and semi-finished products. 6(10) the pressing process, when the wafer is a r shape, must use the corresponding r model measurement, the pressing process s
46、hould be considered to adjust the pressure deformation degree.(11) pressing is finished, the measurement of plate thickness, measuring arc length. check surface quality, check end and weld end is smooth ( necessary to polish out the ceremony ).(12) to check the semi-finished product with process car
47、d is on the move to the next process ( and sign the name ) by the next process to confirm acceptance before.4.spinning process4.1spinning operationthe spinning process is pressed after the drum head molding process, mainly for large head r and straight edge formation.4.2spinning machine.(1) forming
48、wheel is connected to the corresponding mold, forming in the head inside, mold top with half formed head r and straight edge is tangent to tangent.(2) supporting wheel is also connected and molded wheel mold, forming in the head outside, and a forming wheel tangent.(3) base for fixing head, and the
49、bottom according to head size before and after moving, the head should be installed so that the center of the base and the head of the center in a straight line.(4) the center rod is used for fixing head, and the center and the center of the base is in a straight line.in addition to the motor, a cir
50、cuit board, is connected to the shaft, and a control console.4.3spinning procedure(1) to undertake pressure drum process card, according to the card to determine the corresponding head spinning.(2) according to the head of the diameter, select the corresponding upper and lower mold.(3) the clamping
51、head, ensure that the head of the center point and the center of the base point in a straight line.(4) to adjust the molding wheel and the head of tangent, then according to the forming wheel position adjustment roller.(5) in the spinning process to observe the forming roller and the supporting roll
52、er relative position, and continue to use the template on the line alignment. until the r reaches the requirements.4.4spinning operation standard(1) spinning wheel material for steel bearings or ductile iron, mold on the quality of the products and can spin forming closely related, therefore the ope
53、rator must be processed according to choose suitable mold, at the same time, because of the shape of the mold and the surface condition of the quality of the workpiece has a great influence, therefore, before processing and machining process must on the mold for full inspection.(2) according to the
54、process card requirements, confirm wafer, pressure drum or preload semi-finished instruction number, specifications, quantity of material, compliance, and check the quality of surface and end with no defect, abnormal timely and on the procedures of contact, and in a timely manner(3) check the semi-f
55、inished end is smooth, with or without notch, crack, surface has no cutting or welding slag, and shall inspect the weld seam is higher than that of base metal, weld ends whether spatter, weld end grinding smooth, there is no crack. 7(4) pressure drum or to the press after the finished product, must
56、check for folding, cracking, crack is not conducive to the spinning processing defects.(5) for stainless steel workpiece, through to the pickling method of decontamination.(6) according to the process card selection of mold, general small arc r size requirements as a basis for selecting the internal
57、 wheel.(7) according to the different material, thickness of plate and sheet rebound, selection is slightly smaller than the internal wheel circular arc r.(8) for the special requirements of the product, according to its shape design inside the wheel, confirm the mold surface, good polishing process
58、ing.(9) spinning processing, in order to prevent scratching and improve the processing performance, suitable lubricant ( grease ) to prevent process heating head appears on the surface of hot cracks and scratches, can also prolong the service life of die.(10) the spinning process, should be considered a workpiece shaping and timely for pressure adjustment.(11) after the molding process, deal with the size, shape, thickness, surface quality inspections, confirmation.(12) molded product with the card with the transfer process to the next process ( in the process card signed their name ) by th
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 水利水電居間服務(wù)合同
- 2025年度雞蛋供應(yīng)與收購(gòu)合同違約處理3篇
- 2024年工業(yè)互聯(lián)網(wǎng)智能工廠改造合同
- 杭州浙江杭州淳安縣千島湖鎮(zhèn)養(yǎng)老服務(wù)中心招聘工作人員5人筆試歷年參考題庫(kù)附帶答案詳解
- 南京2025年江蘇南京大學(xué)天文與空間科學(xué)學(xué)院準(zhǔn)聘長(zhǎng)聘崗位招聘筆試歷年參考題庫(kù)附帶答案詳解
- 佛山2025年廣東佛山大學(xué)誠(chéng)聘海內(nèi)外高層次人才招聘80人筆試歷年參考題庫(kù)附帶答案詳解
- 2025年四川綿陽(yáng)市鹽亭絲路源文化旅游發(fā)展有限公司招聘筆試參考題庫(kù)附帶答案詳解
- 2025年數(shù)據(jù)中心電力設(shè)備保養(yǎng)與維修服務(wù)合同匯編3篇
- 2025年廣西梧州國(guó)家糧食儲(chǔ)備庫(kù)招考聘用高頻重點(diǎn)提升(共500題)附帶答案詳解
- 2025年廣西桂林市土地儲(chǔ)備中心招考聘用高頻重點(diǎn)提升(共500題)附帶答案詳解
- 醫(yī)院手術(shù)室醫(yī)院感染管理質(zhì)量督查評(píng)分表
- 心內(nèi)電生理導(dǎo)管及器械
- 稱量與天平培訓(xùn)試題及答案
- 超全的超濾與納濾概述、基本理論和應(yīng)用
- 2020年醫(yī)師定期考核試題與答案(公衛(wèi)專業(yè))
- 2022年中國(guó)育齡女性生殖健康研究報(bào)告
- 各種靜脈置管固定方法
- 消防報(bào)審驗(yàn)收程序及表格
- 教育金規(guī)劃ppt課件
- 呼吸機(jī)波形分析及臨床應(yīng)用
- 常用緊固件選用指南
評(píng)論
0/150
提交評(píng)論