1、.外文翻譯Building construction concrete crack ofprevention and processingAbstractThe crack problem of concrete is a widespread existence but again difficult in solve of engineering actual problem, this text carried on a study analysis to a little bit familiar crack problem in the concrete engineering, a
2、nd aim at concrete the circumstance put forward some prevention, processing measure. Keyword:Concrete crack prevention processingForeword Concrete building and Gou piece usually all take sewer to make of, because of crack of existence and development usually make inner part of reinforcing bar etc. m
3、aterial creation decay, lower reinforced concrete material of loading ability, durable and anti- Shen ability, influence building of external appearance, service life, severity will threat arrive people's life and property safety.A lot of all of crash of engineerings is because of the unsteady d
4、evelopment of the crack with the result that.Modern age science research with a great deal of of the concrete engineering practice certificate, in the concrete engineering crack problem is ineluctable, also acceptable in certainly of the scope just need to adopt valid of measure will it endanger deg
5、ree control at certain of scope inside.The reinforced concrete norm is also explicit provision:Some structure at place of dissimilarity under the condition allow existence certain the crack of width.But at under construction should as far as possible adopt a valid measure control crack creation, mak
6、e the structure don't appear crack possibly or as far as possible decrease crack of amount and width, particularly want to as far as possible avoid harmful crack of emergence, insure engineering quality thus. Concrete crack creation of the reason be a lot of and have already transformed to cause
7、 of crack:Such as temperature variety, constringency, inflation, the asymmetry sink to sink etc. reason cause of crack;Have outside carry the crack that the function cause;Protected environment not appropriate the crack etc. caused with chemical effect.Want differentiation to treat in the actual eng
8、ineering, work°out a problem according to the actual circumstance.In the concrete engineering the familiar crack and the prevention1.Stem Suo crack and prevention Stem the Suo crack much appear after the concrete protect be over of a period of time or concrete sprinkle to build to complete behi
9、nd of around a week.In the cement syrup humidity of evaporate would creation stem Suo, and this kind of constringency is can't negative.Stem Suo crack of the creation be main is because of concrete inside outside humidity evaporate degree dissimilarity but cause to transform dissimilarity of res
10、ult:The concrete is subjected to exterior condition of influence, surface humidity loss lead quick, transform bigger, inner part degree of humidity variety smaller transform smaller, bigger surface stem the Suo transform to be subjected to concrete inner part control, creation more big pull should d
11、int but creation crack.The relative humidity is more low, cement syrup body stem Suo more big, stem the Suo crack be more easy creation. Main prevention measure:While being to choose to use the constringency quantity smaller cement, general low hot water mire and powder ash from stove cement in the
12、adoption, lower the dosage of cement.Two is a concrete of stem the Suo be subjected to water ash ratio of influence more big, water ash ratio more big, stem Suo more big, so in the concrete match the ratio the design should as far as possible control good water ash ratio of choose to use, the Chan a
13、dd in the meantime accommodation of reduce water.Three is strict control concrete mix blend with under construction of match ratio, use of concrete water quantity absolute can't big in match ratio design give settle of use water quantity.Four is the earlier period which strengthen concrete to pr
14、otect, and appropriate extension protect of concrete time.Winter construction want to be appropriate extension concrete heat preservation to overlay time, and Tu2 Shua protect to protect.Five is a constitution the accommodation is in the concrete structure of the constringency sew.2.The Su constring
15、ency crack and prevention Su constringency is the concrete is before condense, surface because of lose water quicker but creation of constringency.The Su constringency crack is general at dry heat or strong wind the weather appear, crack's much presenting in the center breadth, both ends be in t
16、he centerthin and the length be different, with each other not coherent appearance.Shorter crack general long 20-30 cm, the longer crack can reach to a 2-3 m, breadth 1-5 mm.It creation of main reason is:The concrete is eventually almost having no strength or strength before the Ning very small, per
17、haps concrete just eventually Ning but strength very hour, be subjected to heat or compare strong wind dint of influence, the concrete surface lose water to lead quick, result in in the capillary creation bigger negative press but make a concrete physical volume sharply constringency, but at this ti
18、me the strength of concrete again can't resist its constringency, therefore creation cracked.The influence concrete Su constringency open the main factor of crack to have water ash ratio, concrete of condense time, environment temperature, wind velocity, relative humidity.etc. Main prevention me
19、asure:One is choose to use stem the Suo value smaller higher Huo sour salt of the earlier period strength or common the Huo sour brine mire.Two is strict the control water ash ratio, the Chan add to efficiently reduce water to increment the collapse of concrete fall a degree and with easy, decrease
20、cement and water of dosage.Three is to sprinkle before building concrete, water basic level and template even to soak through.Four is in time to overlay the perhaps damp grass mat of the plastics thin film, hemp slice etc., keep concrete eventually before the Ning surface is moist, perhaps spray to
21、protect etc. to carry on protect in the concrete surface.Five is in the heat and strong wind the weather to want to establish to hide sun and block breeze facilities, protect in time.3.Sink to sink crack and prevention The creation which sink to sink crack is because of the structure foundation soil
22、 quality not and evenly, loose soft or return to fill soil dishonest or soak in water but result in the asymmetry sink to decline with the result that;Perhaps because of template just degree shortage, the template propped up to once be apart from big or prop up bottom loose move etc. to cause, espec
23、ially at winter, the template prop up at jelly soil up, jelly the soil turn jelly empress creation asymmetry to sink to decline and cause concrete structure creation crack.This kind crack many is deep enter or pierce through sex crack, it alignment have something to do with sinking to sink a circums
24、tance, general follow with ground perpendicular or present 30 °s-45 ° Cape direction development, bigger sink to sink crack, usually have certain of wrong, crack width usually with sink to decline quantity direct proportion relation.Crack width under the influence of temperature variety sm
25、aller.The foundation after transform stability sink to sink crack also basic tend in stability. Main prevention measure:One is rightness loose soft soil, return to fill soil foundation a construction at the upper part structure front should carry on necessity of Hang solid with reinforce.Two is the
26、strength that assurance template is enough and just degree, and prop up firm, and make the foundation be subjected to dint even.Three is keep concrete from sprinkle infusing the foundation in the process is soak by water.Four is time that template tore down to can't be too early, and want to not
27、ice to dismantle a mold order of sequence.Five is at jelly soil top take to establish template to notice to adopt certain of prevention measure.4.Temperature crack and prevention Temperature crack much the occurrence is in big surface or difference in temperature variety of the physical volume concr
28、ete compare the earth area of the concrete structure.Concrete after sprinkling to build, in the hardening the process, cement water turn a creation a great deal of of water turn hot, .(be the cement dosage is in the 350-550 kg/m 3, each sign square the rice concrete will release a calories of 17500-
29、27500 kJ and make concrete internal thus the temperature rise to reach to 70 or so even higher)Because the physical volume of concrete be more big, a great deal of of water turn hot accumulate at the concrete inner part but not easy send forth, cause inner part the temperature hoick, but the concret
30、e surface spread hot more quick, so formation inside outside of bigger difference in temperature, the bigger difference in temperature result in inner part and exterior hot the degree of the bulge cold Suo dissimilarity, make concrete surface creation certain of pull should dint.When pull should din
31、t exceed the anti- of concrete pull strength extreme limit, concrete surface meeting creation crack, this kind of crack much occurrence after the concrete under construction period.In the concrete of under construction be difference in temperature variety more big, perhaps is a concrete to be subjec
32、ted to assault of cold wave etc., will cause concrete surface the temperature sharply descend, but creation constringency, surface constringency of the concrete be subjected to inner part concrete of control, creation very big of pull should dint but creation crack, this kind of crack usually just i
33、n more shallow scope of the concrete surface creation. Main prevention measure:One is as far as possible choose to use low hot or medium hot water mire, like mineral residue cement, powder ash from stove cement.etc.Two is a decrease cement dosage, cement dosage as far as possible the control is in t
34、he 450 kg/m 3 following.Three is to lower water ash ratio, water ash of the general concrete ratio control below 0.6.Four is improvement the bone anticipate class to go together with, the Chan add powder ash from stove or efficiently reduce water etc. to come to reduce cement dosage and lower water
35、to turn hot.Five is an improvement concrete of mix blend to process a craft, lower sprinkle of concrete to build temperature.Six is the in addition that the Chan add a have of fixed amount to reduce water and increase Su, slow Ning etc. function in the concrete, improvement the concrete mix to match
36、 a thing of mobility, protect water, lower water to turn hot, postpone hot Feng of emergence time.Seven is the heat season sprinkle to build can the adoption take to establish to hide sun plank etc. assistance measure control concrete of Wen Sheng, lower to sprinkle temperature of build the concrete
37、.5.Crack and prevention that the chemical reaction cause Alkali bone's anticipating the crack that reaction crack and reinforcing bar rust eclipse cause is the most familiar in the reinforced concrete structure of because of chemical reaction but cause of crack. The concrete blend a future reuni
38、on creation some alkalescence ion, these ion with some activity the bone anticipate creation chemical reaction and absorb surroundings environment in of water but the physical volume enlarge, make concrete crisp loose, inflation open crack.In this kind of crack general emergence concrete structure u
39、sage period, once appear very difficult remediable, so should at under construction adopt valid the measure carry on prevention.Main of prevention measure:While being to choose to anticipate with the alkali activity small freestone bone.Two is the in addition which choose to use low lye mire with lo
40、w alkali or have no alkali.Three is the Chan which choose to use accommodation with anticipate to repress an alkali bone to anticipate reaction. Because the concrete sprinkle to build, flap Dao bad perhaps is a reinforcing bar protection layer thinner, the harmful material get into concrete to make
41、reinforcing bar creation rust eclipse, the reinforcing bar physical volume of the rust eclipse inflation, cause concrete bulge crack, the crack of this kind type much is a crack lengthways, follow the position of reinforcing bar appear.Usually of prevent measure from have:One is assurance reinforcin
42、g bar protection the thickness of the layer.Two is a concrete class to go together with to want good.Three is a concrete to sprinkle to note and flap Dao airtight solid.Four is a reinforcing bar surface layer Tu2 Shua antisepsis coating.Crack processing The emergence of the crack not only would infl
43、uence structure of whole with just degree, return will cause the rust eclipse of reinforcing bar, acceleration concrete of carbonization, lower durable and anti- of concrete tired, anti- Shen ability.Therefore according to the property of crack and concrete circumstance we want differentiation to tr
44、eat, in time processing, with assurance building of safety usage. The repair measure of the concrete crack is main to have the following some method: infuse syrup, the Qian sew method, the structure reinforce a method, concrete displacement method, electricity chemistry protection method and imitate
45、 to living from heal method.1, infuse syrup, the Qian sew method Infuse a syrup method main the concrete crack been applicable to have influence or have already defend Shen request to the structure whole of repair, it is make use of pressure equipments gum knot the material press into the crack of c
46、oncrete, gum knot the material harden behind and concrete formation one be whole, thus reinforce of purpose.The in common use gum knot material has the cement the syrup, epoxy, A Ji C Xi sour ester and gather ammonia ester to equalize to learn material. The Qian sew a method is that the crack be a k
47、ind of most in common use method in, it usually is follow the crack dig slot, the Qian fill Su in the slot or rigid water material with attain closing crack of purpose.The in common use Su material has PVC gum mire, plastics ointment, the D Ji rubber etc.;In common use rigid water material is the po
48、lymer cement sand syrup.2, the structure reinforce a method When the crack influence arrive concrete structure of function, will consideration adopt to reinforce a method to carry on processing to the concrete structure.The structure reinforce medium in common use main have the following a few metho
49、d:The piece of enlargement concrete structure in every aspect accumulate, outside the Cape department of the Gou piece pack type steel, adoption prepare should the dint method reinforce, glue to stick steel plate to reinforce, increase to establish fulcrum to reinforce and jet the concrete compensat
50、ion reinforce.3, concrete displacement methodConcrete displacement method is processing severity damage concrete of a kind of valid method, this method be first will damage of the concrete pick and get rid of, then again displacement go into new of concrete or other material.The in common use displa
51、cement material have:Common concrete or the cement sand syrup, polymer or change sex polymer concrete or sand syrup.4, the electricity chemistry protection methodThe electricity chemistry antisepsis is to make use of infliction electric field in lie the quality of electricity chemical effect, change
52、 concrete or reinforced concrete the environment appearance of the place, the bluntness turn reinforcing bar to attain the purpose of antisepsis.Cathode protection method, chlorine salt's withdrawing a method, alkalescence to recover a method is a chemistry protection method in three kinds of in
53、 common use but valid method.The advantage of this kind of method is a protection method under the influence of environment factor smaller, apply reinforcing bar, concrete of long-term antisepsis, since can used for crack structure already can also used for new set up structure.5, imitate to living
54、from legal moreImitate to living from heal the method be a kind of new crack treatment, its mimicry living creature organization secrete a certain material towards suffering wound part auto, but make the wound part heal of function, join some and special composition(such as contain to glue knot of t
55、he liquid Xin fiber or capsule) in the concrete of the tradition the composition, at concrete inner part formation the intelligence type imitate to living from heal nerve network system, be the concrete appear crack secrete a parts of liquid Xin fiber can make the crack re- heal.ConclusionThe crack
56、is widespread in the concrete structure existence of a kind of phenomenon, it of emergence not only will lower the anti- Shen of building ability, influence building of usage function, and will cause the rust eclipse of reinforcing bar, the carbonization of concrete, lower the durable of material, i
57、nfluence building of loading ability, so want to carry on to the concrete crack earnest research, differentiation treat, adoption reasonable of the method carry on processing, and at under construction adopt various valid of prevention measure to prevention crack of emergence and development, assura
58、nce building and Gou piece safety, stability work.建筑施工混凝土裂縫的預(yù)防與處理 混凝土的裂縫問題是一個普遍存在而又難于解決的工程實際問題,本文對混凝土工程中常見的一些裂縫問題進行了探討分析,并針對具體情況提出了一些預(yù)防、處理措施。關(guān)鍵詞:混凝土 裂縫 預(yù)防 處理前言 混凝土建筑和構(gòu)件通常都是帶縫工作的,由于裂縫的存在和發(fā)展通常會使內(nèi)部的鋼筋等材料產(chǎn)生腐蝕,降低鋼筋混凝土材料的承載能力、耐久性及抗?jié)B能力,影響建筑物的外觀、使用壽命,嚴重者將會威脅到人們的生命和財產(chǎn)安全。很多工程的失事都是由于裂縫的不穩(wěn)定發(fā)展所致。近代科學(xué)研究和大量的混凝土工程實
59、踐證明,在混凝土工程中裂縫問題是不可避免的,在一定的范圍內(nèi)也是可以接受的,只是要采取有效的措施將其危害程度控制在一定的范圍之內(nèi)。鋼筋混凝土規(guī)范也明確規(guī)定:有些結(jié)構(gòu)在所處的不同條件下,允許存在一定寬度的裂縫。但在施工中應(yīng)盡量采取有效措施控制裂縫產(chǎn)生,使結(jié)構(gòu)盡可能不出現(xiàn)裂縫或盡量減少裂縫的數(shù)量和寬度,尤其要盡量避免有害裂縫的出現(xiàn),從而確保工程質(zhì)量。混凝土裂縫產(chǎn)生的原因很多,有變形引起的裂縫:如溫度變化、收縮、膨脹、不均勻沉陷等原因引起的裂縫;有外載作用引起的裂縫;有養(yǎng)護環(huán)境不當和化學(xué)作用引起的裂縫等等。在實際工程中要區(qū)別對待,根據(jù)實際情況解決問題?;炷凉こ讨谐R娏芽p及預(yù)防:1.干縮裂縫及預(yù)防 干縮裂縫多出現(xiàn)在混凝土養(yǎng)護結(jié)束后的一段時間或是混凝土澆筑完畢后的一周左右。水泥漿中水分的蒸發(fā)會產(chǎn)生干縮,且這種收縮是不可逆的。干縮裂縫的產(chǎn)生主要是由于混凝土內(nèi)外水分蒸發(fā)程度不同而導(dǎo)致變形不同的結(jié)果:混凝土受外部條件的影響,表面水分損失過快,變形較大,內(nèi)部濕度變化較小變形較小,較大的表面干縮變形受到混凝土內(nèi)部約束,產(chǎn)生較大拉應(yīng)力而產(chǎn)生裂縫。相對濕度越低,水泥漿體干
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- T/CNCA 057-2023煤炭行業(yè)健康企業(yè)建設(shè)指南
- T/CIMA 0012-2019火鍋底料中嗎啡、可待因膠體金免疫層析檢測卡
- T/CI 120-2023智慧科技館建設(shè)導(dǎo)則
- T/CHTS 10138-2024高速公路服務(wù)區(qū)收費站設(shè)計指南
- T/CHATA 019-2022肺結(jié)核患者管理移動應(yīng)用程序的功能及應(yīng)用規(guī)范
- T/CGAS 026.2-2023瓶裝液化石油氣管理規(guī)范第2部分:平臺建設(shè)
- T/CECS 10170-2022陶瓷透水磚
- T/CECS 10074-2019綠色建材評價太陽能光伏發(fā)電系統(tǒng)
- T/CECS 10036-2019綠色建材評價建筑陶瓷
- T/CCSAS 031-2023蒸餾、蒸發(fā)單元操作機械化、自動化設(shè)計方案指南
- 【MOOC】政府審計學(xué)-南京審計大學(xué) 中國大學(xué)慕課MOOC答案
- 《非織造產(chǎn)品課程設(shè)計》課程教學(xué)大綱
- 2024年第一季度醫(yī)療安全(不良)事件分析報告
- DB51-T 5048-2017 四川省地基與基礎(chǔ)施工工藝規(guī)程
- 房產(chǎn)抵押合同模板格式
- 23J916-1 住宅排氣道(一)
- 深圳小孩上學(xué)租房合同
- 接地電阻、絕緣電阻和漏電保護器漏電動作參數(shù)測定記錄表
- 工程合同管理課程設(shè)計實踐報告
- 專題十五 民事權(quán)利與義務(wù)(考點講析+練習(xí))-2025年高考政治三輪沖刺過關(guān)(全國適用)
- 小學(xué)英語人教PEP版三至六年級全冊單詞詞匯默寫打印
評論
0/150
提交評論