1、信息系統(tǒng)監(jiān)理師 -25( 總分: 100.00 ,做題時(shí)間: 90 分鐘 )一、 單項(xiàng)選擇題 ( 總題數(shù): 30,分?jǐn)?shù): 100.00)1. is a method used in Critical Path Methodology for constructing a project schedule networkdiagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the logical rel
2、ationships that exist between them.(分?jǐn)?shù): 3.00 )A. PERTB. AOAC. WBSD. PDM V解析:解析前導(dǎo)圖法PDM用于關(guān)鍵路徑法,是用于編制項(xiàng)目進(jìn)度網(wǎng)絡(luò)圖的一種方法,它使用方框或者長(zhǎng)方形 (被稱作節(jié)點(diǎn) )代表活動(dòng),它們之間用箭頭連接,顯示彼此之間存在的邏輯關(guān)系。2. Changes often happen in .(分?jǐn)?shù): 3.00 )A. initiating processB. Executing processVC. Planning ProcessD. Closing Process解析: 解析 變更通常發(fā)生的階段是。選項(xiàng)A是啟
3、動(dòng)階段,選項(xiàng) B是執(zhí)行階段,選項(xiàng) C是計(jì)劃階段,選項(xiàng) D是收尾階段。因此,正確答案是 B。3. Tool for defining activities is .(分?jǐn)?shù): 3.00 )A. Dependency DeterminationB. Precedence Diagramming methodC. Rolling Wave PlanningVD. Schedule network Templates解析: 解析 用于定義活動(dòng)的工具 /方法是?選項(xiàng)A是依賴關(guān)系確定法,選項(xiàng)B是前緊關(guān)系繪圖法,選項(xiàng)C是滾動(dòng)式規(guī)劃,選項(xiàng) D是進(jìn)度網(wǎng)絡(luò)模板。其中A、B、D是活動(dòng)排序的方法和工具。因此,正確答案是
4、 C。4. is a client/server protocol for transferring files across the Internet.(分?jǐn)?shù): 3.00 )A. POP3B. IMAPC. FTP VD. HTTP解析: 解析 用于在互聯(lián)網(wǎng)中傳送文件的客戶 / 服務(wù)器協(xié)議是 ?選項(xiàng)A是POP3選項(xiàng) B是IMAP,選項(xiàng)C是FTP,選項(xiàng)D是HTTP因此,正確答案是 C。5. A test case normally consists of a unique identifier, requirement references from a designspecification
5、, events, a series of steps to follow, input, output, actual result, and .(分?jǐn)?shù): 3.00 )A. bugB. expected resulVC. test reportD. traceability matrix解析:6. The Systems Development Life Cycle (SDLC) is a process of creating or altering information systems, and the models and methodologies that people use
6、to develop these systems. Sequential SDLC models, such as , focus on complete and correct planning to guide large projects andrisks to successful and predictable results.(分?jǐn)?shù): 3.00 )A. WaterfallVB. Extreme ProgrammingC. SpiralD. Rapid Prototyping解析:7.In software engineering and systems engineering, ,
7、 is a description of a system"s behavioras it responds to a request that originates from outside of that system.(分?jǐn)?shù): 3.00 )A. black boxB. business ruleC. traceability matrixD. use caseV解析:8.Supervision will manage the implementation and the configuration of the different, types of project docum
8、ents, not including .(分?jǐn)?shù): 3.00 )A. compileVB. formatC. versionD. change解析:9. The quality management plan should describe how the project management team will implement itsquality .(分?jǐn)?shù): 3.00 )A. improvementB. controlC. policyVD. information解析:10. Quality managemen .(分?jǐn)?shù): 3.00 )A. is another name for c
9、areful inspectionsB. is inversely related to productivityC. is primarily the responsibility of managementVD. is primarily the responsibility of the workers解析:11. Adding 5 people to a 4 person team increases the communication channels by a factor of .(分?jǐn)?shù): 3.00 )A. 3 timesB. 4 timesC. 5 timesD. 6 time
10、sV解析:12. The project budget has been finalize D. Additional work has been discovered that was not planned for in the budget or project scope. could provide the fund to cover the newly discoveredwork item.(分?jǐn)?shù): 3.00 )A. Contingency reserveB. Project profitC. Management reserveVD. Special fund解析:13.Sev
11、eral risk response strategies are available. the risk simply gives another partyresponsibility for its management, it does not eliminate risk.(分?jǐn)?shù): 3.00 )A. AvoidingB. MitigatingC. AcceptingD. TransferringV解析:14.Schedule development can require the review and revision of duration estimates and resour
12、ce estimates to create an approved that can serve as a baseline to track progress.(分?jǐn)?shù): 3.00 )A. scope statementB. activity listC. project charterD. project V解析:15. means that every project has a definite beginning and a definite end.(分?jǐn)?shù): 3.00 )A. Project phaseB. UniqueC. TemporaryVD. Closure解析: 解析 臨
13、時(shí)性是指每一個(gè)項(xiàng)目都有一個(gè)明確的開(kāi)始時(shí)間和結(jié)束時(shí)間。16. Which of the following would requirereal-time processing? (分?jǐn)?shù): 3.00 )A. Playing a computer gameVB. Executing a program that predicts the state of economyC. Printing labelsD. Listening the music解析:17.One tool that is useful during both analysis and design is the , which
14、is a pictorialrepresentation of the items of information (entities) within the system and the relationshipsbetween these pieces of information.(分?jǐn)?shù): 3.00 )A. data dictionaryB. dataflow diagramC. use case diagramD. entity-relationship diagramV解析:解析在系統(tǒng)分析和設(shè)計(jì)中同樣適用的工具是答案D實(shí)體關(guān)系圖,它通過(guò)圖形形式,表現(xiàn)系統(tǒng)內(nèi)的實(shí)體信息以及這些信息之間的關(guān)
15、系。18. The connection between two networks to form an internet is handled by a machine known as a(分?jǐn)?shù): 3.00 )A. bridgeB. clientC. routerVD. switch解析: 解析 路由器是用來(lái)鏈接兩個(gè)網(wǎng)絡(luò),并使其實(shí)現(xiàn)互聯(lián)的設(shè)備。19. Configuration management is the process of managing change in hardware, software, firmware, documentation, measurements,
16、etc. As change requires an initial state and next state, the marking of significant states within a series of several changes becomes important. The identificationof significant states within the revision history of a configuration item is the central purpose of identification.(分?jǐn)?shù): 3.00 )A. baseline
17、VB. valueC. costD. Control解析: 解析 配置管理是在硬件、軟件、固件、文件、測(cè)量等的過(guò)程管理的變化,作為變化需要有一個(gè)初 始狀態(tài)和下一個(gè)狀態(tài),標(biāo)識(shí)上一狀態(tài)變化非常重要,配置項(xiàng)目需確定重要狀態(tài)的修訂歷史記錄,主要目的 是基線的確定。20. Development is a structured design methodology that proceeds in a sequence from onephase to the next.(分?jǐn)?shù): 3.00 )A. WaterfallVB. PhasedC. PrototypingD. Parallel解析: 解析 本題
18、含義可表述為, 瀑布模型是一種結(jié)構(gòu)化設(shè)計(jì)方法, 是一個(gè)階段接著一個(gè)階段的順序過(guò)程。 所以應(yīng)該選擇 A。21. Maintenance activities include . making enhancements to software products developing a new software product correcting problems adapting products to new environments(分?jǐn)?shù): 4.00 )A. B. VC. D. 解析: 解析 本題含義可表述為:軟件維護(hù)活動(dòng)包括哪些工作。 軟件產(chǎn)品改進(jìn); 開(kāi)發(fā)新的軟件產(chǎn)品; 糾正錯(cuò)誤; 修改
19、產(chǎn)品以使其適應(yīng)外界環(huán)境變化。所以應(yīng)該選擇 B。22. operate by distributing a workload evenly over multiple back end nodes. Typically thecluster will be configured with multiple redundant load-balancing front ends.(分?jǐn)?shù): 4.00 )A. High-availability clustersB. Load-balancing clustersVC. Grid computingD. Cloud Computing解析:解析 負(fù)載均
20、衡集群操作的工作量均勻分布在多個(gè)后端節(jié)點(diǎn),通常情況下將在集群配置多個(gè)冗余負(fù) 載均衡前端。23. A PM wanted to show management, visually, how quality controls were affecting processes. Thebest tool to accomplish this is .(分?jǐn)?shù): 4.00 )A. DiagramsB. HistogramsC. FlowchartsD. Control chartsV解析: 解析 項(xiàng)目經(jīng)理要想更直觀地表示出質(zhì)量控制是如何影響項(xiàng)目進(jìn)度的,最好的工具是控制圖。24. is a measura
21、ble, verifiable work product such as specification, feasibility study report,detail document, or working prototype.(分?jǐn)?shù): 4.00 )A. MilestoneB. DeliverableVC. EtcD. BAC解析: 解析 可交付物是指類似于規(guī)格說(shuō)明書(shū)、可行性研究報(bào)告、詳細(xì)文檔或可運(yùn)行的原型之類的可測(cè)量 和驗(yàn)證的工作產(chǎn)品。25. is the budgeted amount for the work actually completed on the schedule act
22、ivityor WBScomponent during a given time perioD.(分?jǐn)?shù): 4.00 )A. Planned valueB. Earned valueVC. Actual costD. Cost variance解析:解析掙值是在給定時(shí)期內(nèi)按進(jìn)度活動(dòng)或WBSFM牛所實(shí)際完成工作的預(yù)算值。26.Since RAMis only active when the computer is on, your computer uses disk to store information even when the computer is off. Which of the
23、following is true? (分?jǐn)?shù): 4.00 )A. When your computer is on, only RAM is used to store information.B. When your computer is on, only disk drives are used to store information.C. When your computer is off, only RAM is used to store information.D. When your computer is off, only disk drives are used to store information.V解析:解析本題含義可表述為,由于RAN只有當(dāng)計(jì)算機(jī)運(yùn)行時(shí)是工作的,所以當(dāng)計(jì)算機(jī)關(guān)閉時(shí)使用磁盤來(lái)存儲(chǔ)信息。所以應(yīng)該選擇D(當(dāng)計(jì)算機(jī)關(guān)閉后,只有磁盤被用于存儲(chǔ)信息)。27. The basic unit of measure in a computer system is the . It is the smallest unit in computing.There are some other measures in a comp
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 全款房屋購(gòu)買合同范例
- 小區(qū)自營(yíng)租售合同模板
- 單體酒店店長(zhǎng)合同模板
- 醫(yī)院藥房托管合同范例
- 云服務(wù)流量合同范例
- 廠子轉(zhuǎn)讓合同范例
- 工程代班合同范例
- 2024年政府機(jī)關(guān)公務(wù)接待服務(wù)協(xié)議
- 工程船出租合同模板
- 宴席定餐合同模板
- 合唱比賽評(píng)分表及評(píng)分標(biāo)準(zhǔn)
- 關(guān)于高中英語(yǔ)寫(xiě)作教學(xué)的問(wèn)卷設(shè)計(jì)(學(xué)生卷)
- VFA的測(cè)定方法及標(biāo)準(zhǔn)曲線
- 危險(xiǎn)品安全數(shù)據(jù)清冊(cè)氯氰菊脂
- 施工現(xiàn)場(chǎng)挖斷電纜、光纜事故應(yīng)急搶修方案(純干貨版)
- 石灰石粉倉(cāng)安裝方案
- 松下電器(中國(guó))焊接學(xué)?!附蛹夹g(shù)
- 《肺動(dòng)脈高壓護(hù)理》PPT課件.ppt
- 河堤工程巖土工程勘察報(bào)告
- 完整版水穩(wěn)自評(píng)報(bào)告
- 《小兒推拿》PPT課件(完整版)
評(píng)論
0/150
提交評(píng)論