HR管理知識(shí)匯編1(00004)_第1頁
HR管理知識(shí)匯編1(00004)_第2頁
HR管理知識(shí)匯編1(00004)_第3頁
HR管理知識(shí)匯編1(00004)_第4頁
HR管理知識(shí)匯編1(00004)_第5頁
已閱讀5頁,還剩5頁未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、Memorandum to :Ai BaojunGM, BaosteelZhao Zhouli Deputy GM, BaosteelZhou JianfengAssistant to GM, BaosteelLi Qingyu Director, ESI Pang YuanlinGM, HRC PlantImprove Baosteel s performance through implementing lean manufacturingThrough the close collaboration with HRC lean diagnosis client team, and und

2、er the directional guidance of steering committee and support of relevant departments, we have successfully finished lean diagnosis of HRC plant from March 26 to April 23. We hope, through this memorandum, to provide you the summary of diagnosis results and suggestions on next phase lean manufacturi

3、ng pilots in HRC plant.1. SUMMARY OF LEAN MANUFACTURING DIAGNOSIS CONCLUSIONSBaosteel currently faces significant challenges in satisfying growing, demanding and differentiated customer needs in a bid to become world-class steel company. As the key bottleneck part of the production chain, current HR

4、C performance on asset productivity, product quality and delivery performance needs to be significantly improved for Baosteel to secure and strengthen its competitive position to grow market share in an increasingly competitive environment.Benchmarking with external and historical internal best prac

5、tices reveals that the capacity utilization and OEE of both 1580 and 2050 lines have improvement potentials of more than 10%. Bottom up root cause analysisreveals significant reduction potential in maintenance time, roll change time, breakdown, speed loss, rework (including downgrade), and delivery

6、lead time. Potential near term (within next 12 months) financial impact across all three areas could reach RMB 200 million in total, and mid-term (1-3 years) financial impact could be RMB 600 million in total.Baosteel should realize significant improvement potential and resulting financial benefits

7、within and across asset productivity, product quality and delivery through a comprehensive 3-5 years change program. It should engage and empower employees at operational level to rigorously apply lean tools and structured problem solving approach to set up systems and participative processes to pur

8、sue- co“ntiKnauiozuesn im” provement. Tosupport lean transformation, Baosteel should also strengthen its organizational capability by setting up Continuous Improvement Organization as well as policy deployment (performance management) system to institutionalize the change program, thus ensuring that

9、 Baosteel s strategic and operational targetsare deployed top-down to each level of the company, strengthening and/or setting up appropriate performance evaluation and incentive system, and aligning employee s individual KPIs with overall company target.Baosteel should start implementing lean manufa

10、cturing in HRC plant. HRC should kick start the change program by implementing a 6-9 months pilot program immediately. It should pursue breakthrough initiatives to improve roll change time, maintenance time using lean tools as well as setting up appropriate organization, systems and processes for co

11、ntinuous improvement by solving a selected number of high priority product quality and breakdown problems. It should start setting up performance management system and process, and track, evaluate and control implementation process, in parallel to institutionalize the change program within HRC.Lean

12、transformation is a systematic project for corporate reform (6 sigma is one part of lean manufacturing). During the transformation process new ethics and conducts will collide and conflict with current management system. Therefore, the senior management should profoundly realize that lean manufactur

13、ing could bring significant benefits to Baosteel in terms of shareholder value, customer satisfaction, and employee satisfaction. Based on this belief, senior management should, with unshakable confidence andcommitment, lead and promote and rollout and deepening of lean manufacturing pilot.2. HRC PL

14、ANT LEAN MANUFACTURING PILOT PLANTrough the communication and discussion with HRC plant management, the joint diagnosis team proposes to conduct pilots of 3-6 months in product quality, breakdown time, work roll change, backup roll change, and annual planned maintenance areas. In order to speed up r

15、ealization of short-term targets and financial impacts, and considering HRC implementation capability and risk, team recommend both 1580 and 2050 lines conduct pilots at the same time. In the meantime, team will help set up performance management system and process in HRC to provide fundamental infr

16、astructure support for next step lean roll out and continuous improvement. The pilot plan include the following 4 parts:1. Pilot target2. Pilot approach3. Key pilot activities and end products4. Joint pilot team members1. Pilot targetJoint diagnosis team suggests that Baosteel use near term improvem

17、ent potential as final target of 6-9 months pilot, and, depending on the characteristics of each improvement areas, set required time to reach targets and evaluation standard of pilot results. Detailed pilot targets will be defined after you make “ go” decision, and will be validated inetfhorm of si

18、gned performance contract between Baosteel senior management and HRC pilot teams.Near term improvement target is list in lean manufacturing diagnosis report.2. Pilot approachJoint diagnosis team recommends that HRC plant should adopt different problem solving approaches according to the characterist

19、ics of different pilot projects.2.1 Breakthrough projects : For those projects that have fewer improvement opportunites however each with high financial impact, and have less requirement on large scale people involvement, which include work roll and backup roll changes and annual planned maintenance

20、, we recommend breakthrough pilots with project team leading the problem solving. This will involve standardization of work process, training of front line operators, and then implementation of pilot.2.2 Continuous improvement projects involving all employees : Forthose projects that have many impro

21、vement opportunities however each with low financial impact, and require large-scale people involvement, which include improving product quality and reducing breakdown time, we recommend continuous improvement pilots involving all employees. Using systematic problem solving method and tools, project

22、 teams continuously, bottom-up, capture and implement each improvement opportunity that will bring impact. This pilot approach has generated significant impact in thousands of operational improvement projects we involved. It will generate significant impact in a short term and continue the improveme

23、nt step by step in a 3-month stage.Due to the complexity of product quality problem, team suggests that, before the step-by-step continuous improvement implementation, Baosteel should design a quality organization and management process as the fundamental infrastructure of continuous improvement. We

24、 suggest that, during the first 3 months of pilot, pilot team will drive selectively solving “ first wave ” common and frequent quality problems, in the meantime set up quality continuous improvement organization and management process, and train relevant people to use appropriate quality tools. Fro

25、m the fourth month, team begins piloting quality organization and process, and solve“ second wavequality problems through the involvement of all employees.2.3 Set up performance managem ent system to “ lock in ”improvement results and behavior : In parallel with the pilot, a performance management s

26、ystem team will build HRC KPI tree, cascade breakdown of KPI at each operational level, design KPI for each position, and, combined with the pilot, track, analyze, and monitor the KPI.3. Key pilot activities and end products3.1 Work roll and backup roll changes pilot team (6/1 -8/31)Key activities :

27、Train front line operators on SMED, PERT, and PDCA systematic problem solving methodConduct multiple observations on roll changes, and collect sufficient data on roll change processConduct in-depth root cause analysis and“ brain storm ” onpotential solutionsDesign improvement plan, implementation pl

28、an, and standard work processImplement improvement plan, adjust and fine tune the plan in the pilot, and document the standard work process for future rollout Design performance tracking and evaluation system for roll changesEnd products:3.1.1 Realized pilot targets3.1.2 Standard work process on cha

29、nging work roll and backup roll3.1.3 Performance tracking and evaluation system for work roll and backup roll changes3.1.4 Trained (systematic problem solving method, SMED, PERT, and standard work process) front line operators3.2 Annual planned maintenance pilot team (6/1-8/31)Key activities :Train

30、front line operators on SMED, PERT, and PDCA systematic problem solving methodConduct multiple observations on annual planned maintenance process, and collect sufficient data on annual planned maintenance processConduct in-depth root cause analysis and“ brain storm ” onpotential solutionsDesign impr

31、ovement plan, implementation plan, and standard work processImplement improvement plan, adjust and fine tune the plan in the pilot, and document the standard work process for future rollout Design performance tracking and evaluation system for annual planned maintenanceEnd products:3.2.1 Realized pi

32、lot targets3.2.2 Standard work process on annual planned maintenance3.2.3 Performance tracking and evaluation system for annual planned maintenance3.2.4 Trained (systematic problem solving method, SMED, PERT, and standard work process) front line operators3.3 Product quality pilot team (6/1 T1/30)Ke

33、y activities :Conduct training for pilot team members and other relevant people on PDCA systematic problem solving method, root cause anaysis tools including fishbone and“ 5 why ” , SPC, and PFMEA, etcDefine the responsibilities on quality management for each HRC departments and positionsDesign key

34、quality management process (problem detection, eradication, and prevention)Based on the pilot targets, solve selected quality problemsSolve quality problems using PDCA systematic problem solving method, process and appropriate quality toolsTrack and monitor the implementation and improvement plan, a

35、nd standardize the work processDesign performance tracking and evaluation systemEnd Products:3.3.1 Defined quality management responsibilities for each HRC departments and positions3.3.2 Key quality management process (quality problem detection, eradication, and prevention)3.3.3 Realized pilot targe

36、ts on quality problem improvement3.3.4 Documented standard work process against solved quality problems in the pilot3.3.5 Trained (quality tools and standard work process) operators3.3.6 Performance tracking and evaluation system for product quality pilot3.4 Breakdown time pilot team (9/1-11/30)Key

37、activities :Conduct training for pilot team members and other relevant people on PDCA systematic problem solving method, root cause anaysis tools including fishbone and“ 5 why ” , SPC, and PFMEA, etcDefine breakdown reduction frequency and time indicator for eachHRC departments and positionsDesign q

38、uick response process for machine breakdownBased on the pilot targets, solve selected breakdown problemsSolve breakdown problems using PDCA systematic problem solving method, process and appropriate quality toolsTrack and monitor the implementation and improvement plan, and standardize the work proc

39、essDesign performance tracking and evaluation systemEnd Products:3.4.1 Defined responsibilities on machine breakdown for each HRC departments and positions3.4.2 Realized pilot targets on breakdown problem improvement3.4.4 Documented standard work process against solved breakdown problems in the pilo

40、t3.4.5 Trained (systematic problem solving method and standard work process) operators3.4.6 Performance tracking and evaluation system for breakdown pilot3.5 Performance management system team (9/1-11/30)Key activities :Build KPI trees for HRC plant, define KPIDesign KPI and define the source of KPI

41、 data Design KPI model (spreadsheet) systemInput historic data and pilot target into KPI model (spreadsheet), and test the extent of financial impact of each KPIDesign performance feedback process and format, set up performance management and monitor systemEnd products:3.5.1 KPI model (spreadsheet)

42、system for HRC plant3.5.2 source of KPI data3.5.3 Performance management and feedback process4. Members of joint pilot teamsThe project team will consist of Baosteel personnel and McKinsey consultants who will work jointly as a team. This team will be jointly responsible for the success of the proje

43、ct and the project end products. The McKinsey team members will bring experience and training in operational improvement and lean manufacturing in steel, and the Baosteel team will provide relevant information. The joint project team will work together to analyze problem, desing improvement plan, do

44、cument standard work process, train operators, track, analyze and monitor the implementation process.Steering committee. A steering committee consisting of Mr. Ai Baojun, Mr. Zhao Zhouli, Mr. Zhou Jianfeng, Mr. Li Qingyu and Mr. Pang Yuanlin from Baosteel should lead the overall project, and guide a

45、nd supervise the projectteam by providing strategic direction, refining the project approach,approving recommendations, and ultimately assuming responsibility for project implementation.The steering committee will meet periodically throughout the project every 4-6 weeks. The steering committee will

46、review the project progress, approve critical pilot implementation plan, guide the pilot direction, and remove hurdles in pilots.Project leadership team. Project leadership team consists of Mr. Li Qingyu and Mr. Yang Chunping from Baosteel and Jonathan Woetzel and Antti Pitkanen from McKinsey. Proje

47、ct leadership team meets frequently, e.g., weekly to provide direction and guidance to the project team.Joint Baosteel/McKinsey project team (full time). A full time cross-functional project team consisting of Baosteel team members and McKinsey consultants will drive the overall project execution. A

48、 full-time Baosteel project leader and Mr. Zhang Wejie, the McKinsey engagement manager, will lead the team. According to pilot areas project team will consists of 5 sub-teams: roll change project team, annual planned maintenance project team, product quality continuous improvement project team, bre

49、akdown reduction continuous improvement project team, and performance management system project team. Every sub-team, except for performance management system project team, will consist of two team leaders with each from 1580 and 2050 lines, and 3-4 client team members (full time or part time). Perf

50、ormance management system project team consists of 1 McKinsey consultant and 3-4 client team members. Members of the client team must be both high potential and high performing, consisting of Baosteel managers and personnel who have been identified as likely future leaders.The full-time team will al

51、so need the assistance of part-time resources from the hot rolled coil plant and key functional departments in providing data, documents, and reacting to the project teamF orsbthoitnhkfiunlgl .-time andpart-time team members, the Baosteel project leader will ensure that Baosteel team members deliver

52、 their end products on time.Over the course of the pilot, the project team would work closely withBaosteel management and meet together in workshops and reporting sessions. McKinsey will work closely with the pilot client team, emphasizing the coaching and training of client team members. Client tea

53、m members will provide critical operational information on Baosteel product quality and delivery performance as well as asset productivity issues, and participate fullyin the project team s activities and anTalhyesiirs.day -to-day roles will be to work together with the McKinsey team on data collection efforts, key interviews, analysis and synthesis, and k

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論