




版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、Delegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Asse
2、mbly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the party's 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously impr
3、ove, smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totale
4、d 7.815 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. -Security measures: unplanned outages 2.5 times.
5、No personal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget o
6、f 207 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. -Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions
7、performance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. -Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16%
8、reduction over the same period a year earlier. Major achievements: first, we should adhere to the two "management system" basis, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -The two "management sy
9、stem" for improvement. Focus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines, safety supe
10、rvision and management network role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspection, safety p
11、roduction month, day supervision of production safety and the Olympic Games and other2011銷售部業(yè)務流程 P9/10銷售工作流程圖接待客戶流程圖簽認購書流程圖簽買賣合同流程交樓發(fā)信流程圖現(xiàn)樓發(fā)信流程圖現(xiàn)場交樓流程圖辦理產權流程圖延遲簽約流程圖換房流程圖主要介紹的是永磁直流電動機;首先簡述了永磁電機、永磁直流電動機從產生到到逐步改善的發(fā)展過程,以及以此為基礎的未來發(fā)展的趨勢;activities, comprehensive and tamping Safety Foundation . Troublesho
12、oting, management mechanism, give full play to role of technical supervision and realization of troubleshooting, management, improved process management. This year completed the boiler lower header leakage, boiler pressure, a major risk management, completed 29 of great risks and 3 General problems
13、of governance. Complete chemistry lab construction, thermal control, and complete the boiler scale integrated management, host shafting vibration of 10 scientific and technological projects, such as. Complete supercritical 630MW on-line simulation system development and application of circulating wa
14、ter MCC standby power transformation, the transformation of desulfurization waste water, the unit water supply system of comprehensive treatment and discharge valve modification of coal mill 5 key technological transformation projects, group health is improved. -Science and technology innovation is
15、further increased. Strengthen the characteristics of supercritical unit major issues, gradually clearing the particularity of supercritical unit and regularity. Developed motor oil time management, switch action times, statistics, coal-aided measurement software, improves the production level of lea
16、n management. Increased investment in science and technology, reporting science and technology projects and 14 technical project total cost percentage of the total annual production output of 0.25%. "Large-scale coal-fired power plant flue gas desulfurization, denitrification complete developme
17、nt and application of key technologies" project, won the national science and technology progress second prize. 630MW supercritical units optimized control strategies and the 630MW development and application of on-line simulation system for supercritical units, supercritical 600MW units of tur
18、bine driven boiler feed pump set of comprehensive treatment of defects Datang technology respectively one or two and third. Meanwhile, information technology achievements, the company was named "China power information technology benchmarking enterprises." -Repair and maintenance has improved further. Modify the inspection standards and standards on a regular basis, standardizing work procedures, checking and inspection project. Deepening the BFS+ system, and implements maintenance information shared. Reorganizing RB logic again, and ensure the success o
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 吊裝工程合同范例
- 吊船租賃合同范本
- 包工頭內部合同范本
- 合伙開車行合同范本
- 商鋪門面租借合同范本
- 農村土布收購合同范本
- 衛(wèi)浴安裝承攬合同范本
- 名氣大承攬合同范本
- 代理加工合同范本
- 加油站職業(yè)經理人合同范本
- 《主題六 研學旅行我做主》教學設計-2023-2024學年六年級下冊綜合實踐活動遼師大版
- 數(shù)字賦能農村特色產業(yè)發(fā)展的實證研究
- Unit 1 My school Part B Let's talk(教學設計)-2023-2024學年人教PEP版英語四年級下冊
- 新版華師大版八年級下數(shù)學教案全冊
- 高中主題班會 《哪吒2》:成長與蛻變課件-高一下學期開學主題班會
- 電力工程建設中的風險控制與管理措施
- 《教育強國建設規(guī)劃綱要(2024-2035年)》解讀與專題培訓
- 抑郁復學申請書
- 【歷史】“開元盛世”課件-+2024-2025學年統(tǒng)編版歷史七年級下冊
- 建筑施工作業(yè)人員安全生產知識教育培訓考核試卷及答案
- 2025年張家界航空工業(yè)職業(yè)技術學院高職單招職業(yè)技能測試近5年常考版參考題庫含答案解析
評論
0/150
提交評論