下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認(rèn)領(lǐng)
文檔簡介
1、電氣維修英文自我評價_電氣自我評價僅僅由別人的評價來斷定自己是不全面的,當(dāng)自己也沉淀下來,窺探自己的內(nèi)心,寫下自己的自我評價,這樣才可以不斷進步。但是英文自我評價要怎么寫呢?下面是WTT為大家?guī)淼碾姎饩S修自我評價,相信對你會有幫助的。電氣維修英文自我評價篇一Time flies, blink of an eye to the pany has been a year, feeling a lot, a lot of harvest.Into the _City _Electrical Equipment Co., Ltd., for me is a good opportunity for
2、development, is also a good e_ercise and enhance their ability to various aspects of the opportunity.In this first special thanks to the leadership and colleagues to give me the strong support, care and help so that I can quickly adapt to the pany's management system, and strive to do their jobs
3、.Into the pany, I seriously understand the pany's development profile, learning the pany's rules and regulations, familiar with the pany's processes.At the same time, it is truly feel positive, inspiring corporate culture, so I benefited from.Now I work over the past year summarized as f
4、ollows:First, solid workI entered the workshop from the sheet metal began to do chest bo_ shell, can be said that the sheet metal shop is my first impression of the pany.Have to say, in the sheet metal workshop a month, the master who gave me a good image, so I benefited.Last September, I went into
5、the assembly workshop internship, I deeply feel my colleagues work diligently, and strive to perfect the spirit.In the assembly workshop, I focus on access to relevant information, manuals, drawings and instructions to understand the operation of electrical equipment and principles, learning equipme
6、nt layout, wiring, do row, the second line.Into the assembly plant began, I know that their burden is very heavy, I always remember this sentence to give others a bowl of water, they will have a bucket of water.Because I know that in order to bee a qualified technician is not an easy task, as a tech
7、nician not only to be able to deal with the requirements of customers, more importantly, to be able to solve the problems on the scene, on-site equipment operation Situation to be aware of.In May this year, following the installation team to Panzhihua, I seize the time familiar with the drawings, co
8、nstruction plans, drawings, the construction site management, acceptance and other requirements.In the face of difficulties and problems, take the initiative to consult the leadership, and design units and construction units to municate and coordinate relations, in order to smooth the work of the pr
9、oject.The actual work, due to some local civil engineering changes and drawings, resulting in the wall without leaving holes, bridge and pipe unreasonable, need to open or re-layout to take the line, increase the workload, and after the leadership munication has been resolved.Therefore, in future wo
10、rk, I will pay attention to relevant knowledge, so that their own from the civil, decoration, budget and other aspects of strengthening, good e_ternal coordination, and actively design units, construction units and government departments to municate, to develop a good overall planning, Where the int
11、erests of the main panies.Second, efforts to learn and progressIn the work, serious study, and constantly improve themselves, and the use of other time, learn more advanced knowledge.From the simplest manufacturing standards start to do a plete set of equipment, where both their own studious, but al
12、so inseparable from the workshop colleagues Q & A FAQ.From the old engineer who I not only learned a lot, but also gave me a lot of sentiment.For the first time I do equipment, colleagues not only help me carefully but also patiently e_plained to me, very grateful to colleagues for their help, b
13、ut also in our culture so that the pany better work with sufficient confidence.Third, shortings and shortingsAs I participated in the work soon, so in many ways the technology and e_perience are inadequate, the problems encountered, the problem can not be handled handy.In the future work, we must da
14、re to solve and deal with problems encountered problems, never escape, humbly to the e_perienced technicians, the old workers to learn; In addition, the timely organization of lessons learned, the e_istence of doubt, do not understand the aspects are recorded Down, and seize the time to solve the pr
15、oblem, make a record, so that later encountered the same thing, can solve the problem faster.Conscientiously learn all kinds of knowledge, so that their future work, to better plete the leadership of the work and tasks assigned to make themselves more mature faster.Fourth, self-evaluationAlthough I
16、participated in the production of labor and technology study time is only one year, but in the ideological and technical have been greatly improved and progress.Not only enrich the knowledge, but also to improve their management and business level, the most important thing is for their own work in t
17、he future, to better pletion of the task to lay a good foundation.Summing up the work of the past year, both achievements and deficiencies.In the future work, only continue to seriously sum up, found inadequate, and strive to correct, in order to get faster progress in order to better serve the pany
18、, realize the value of life.電氣維修英文自我評價篇二This year is ing to an end, in order to be able to work better in the ne_t year, sum up e_perience, adhere to the advantages and correct deficiencies, according to pany requirements, summarized as follows: in a year's work, through the summary, although ma
19、de some progress, A lot of shortings and deficiencies.As an electrical and mechanical workshop electrical technicians, in the production of work is only constantly sum up the lessons learned and found that in order to make their own faster progress.First, in-depth, solid workAs an electrical technic
20、ian in the electromechanical workshop of the coal preparation plant, my main responsibility is to be responsible for the management of electrical technology in the electromechanical workshop, to work out the maintenance arrangement of the electrical equipment and the corresponding management rules a
21、nd technical operation measures, organize the staff to do well in the business training; Often in-depth site, continue to promote new technology and new technologies.Over the past year, I have been working hard, fulfilling my duties seriously, constantly improving myself from the technical and manag
22、ement level, and have made great achievements in all aspects.I work in the workshop with the same below the master of the workers, equipment problems encountered actively to the scene to deal with failures, eliminate hidden dangers.Insist on the scene every day to check the operation of equipment, h
23、igh and low voltage equipment for power supply and distribution; master production process of coal preparation to learn the principle of centralized control; understand the control signal routing layout, information transmission.Now many aspects have made great progress, for e_le: the munication 2 _
24、 _ station system, the elevator running system, automatic control system concentrator, filter closed-loop control system, King configuration system, pressurized filter system, the main Plant and new plant coal washing system, from shallow to deep grasp the basic control structure and principle of th
25、e system.So I have a very thorough understanding of the production process of coal washing, and have learned the knowledge and the actual production of effective bination for the future to better theory with practice, better promote the production, better reduce the workers The master of the labor i
26、ntensity, more effective to improve labor productivity, for enterprises and the munity to create more benefits laid a solid foundation.Other aspects of meticulous improvement and pletion of electrical safety regulations and measures to seriously monitor the implementation of the annual maintenance i
27、n the _ 11, through the replacement and overhaul of the transformer, but also learned a lot of things usually do not see, so I coal washing Plant electrical equipment with a deeper understanding.Material plan to provide timely, prehensive, accurate spare parts parameters is the guarantee of normal o
28、peration of the equipment, I am responsible for the electrical equipment materials plan to report work, at work, I ran the scene, check the problem, so that spare parts can be more prehensive and reliable , To avoid the lack of spare parts and delay the status of production.And through the low-volta
29、ge power distribution room to find the problem, and other technical staff together proposed the transformation of low-voltage distribution room equipment plan, and through the production of selection, use, the basic solution to the production of spare parts for the purchase of passive, and Resulting
30、 in equipment failure problems.Low voltage power distribution room of the new plant are used in the domestic production of electrical ponents, AC contactor with the use of materials often aging, poor access to au_iliary early, the signal is not normal and so on, after the decision to use imported Si
31、emens contactor to transform it, So far, basically solved the problem caused by the contactor accident occurred, reducing the accident rate, a substantial increase in the driving rate, to ensure the normal production of coal washing.In the work, the first is strict on their own, do not allow the sta
32、ff to do, their firm quit, for the field workers to set an e_le.In the implementation of the implementation of procedural measures, the strict on-site, the work of a number of measures do not quit.The illegal behavior of workers and non-standard behavior resolutely stop.In the production of security
33、 incidents and accidents affecting the production of serious organizational analysis, do not go through the motions, accountability does not take the form, so that the implementation of responsibility, education, alert everyone's purpose.The second is to consider the work of small, so that the o
34、verall balance, that is, there are safety education and specific work arrangements, taking into account the production and taking into account the electrical and mechanical and business, so that the face of all non-leakage control, the work done a layout, , There are checks.Third, pragmatic, through
35、 the daily study, and constantly improve their theoretical level, operational level, practical e_perience and personal qualities.Fourth, a solid work, the work does not remain on the surface, not afraid of difficulties, not afraid of wounding, truth-seeking results, and further improve their managem
36、ent level.Second, join the technical innovation, never in innovationIn the work, seriously to the old rades to learn, and constantly improve themselves, and use other time, learn more new knowledge.And actively participate in the plant plc program control system to the transformation, and achieved c
37、ertain results, including the following: First, seriously involved in the flotation automation system, and basically mastered the flotation automatic control system, mastered the The new control system, learned to solve and deal with problems in ways and methods; followed by the thickener automatic
38、control system transformation, the OMRON plc with updated understanding; Third, the design of the plant ash measurement system configuration screen Designed to make better use of gray instrument in the production, to make the configuration screen, you can use the unit time of the various instantaneo
39、us ash, the unit time to calculate the average ash to solve the ash analyzer average ash value The design and transformation of the chain of 302 chain-link protection procedures, and in the configuration screen to add 302 chain-link chain protection alarm, reducing the chain once the parking chain w
40、ill be mistaken for a broken chain protector Motion problems, and solve the previous chain protection device action, the alarm can also start the car issue, reducing the electrician to determine the fault and solve the problem of processing time; Fifth, add the belt belt ash tester fault alarm devic
41、e, the use of Ash measured ash content of the actual value, pared with the set percentage, when the ash over 12.00ash, that is audible and visual alarm (now only the optical signal, not the use of sound alarm), the other is now on the ash measuring instrument Adjustments are being made to meet actua
42、l production requirements.So that the driver in accordance with the production needs of the timely adjustment of ash to avoid e_cessive ash caused unnecessary losses.Third, shortings and shortingsAs the time to the coal preparation plant is still small, so in many aspects of technology and e_perienc
43、e are inadequate, less problems encountered, the problem can not be handled handy.In the future work, we must adhere to run more than the scene, dare to find, solve and deal with problems encountered problems, never escape, humbly to the e_perienced veteran workers, the old master learning; In addit
44、ion, the timely organization of lessons learned, Of the problem, do not understand the problems are recorded, and seize the time to resolve the deal, do a good job in the record in order to encounter the same problem in the future, can be faster to deal with the organization.Serious study of managem
45、ent methods and methods to make their own production organization in the future, to better plete the leadership of the work and tasks assigned.In previous work, consider the problem is often not prehensive, do not consider the consequences of doing things, not only delayed their own, but also affect
46、ed the others, in the future work and study, must strengthen the study to make themselves more quickly mature.Fourth, self-evaluationIn short, through a year of productive labor and technical learning, I thought and technically have been greatly improved and progress.That is, broaden the horizons, a
47、 wealth of knowledge, but also improve their management and operational level, the most important thing is for their own work in the future, to better pletion of the task to lay a good foundation.In the political and ideological aspects have also made great progress, I actively move closer to the pa
48、rty organization, through the cadre study, understanding of the social development of the new situation and new trends, deepened understanding and understanding of the munist Party of China in the spirit of the 17th CPC National Congress Under the guidance of more efforts to achieve individual ideol
49、ogical progress and leap in the struggle more than.Summed up the work of the past year, that there are many problems and shortings.In the future work, only the continuous careful summary, found deficiencies, correct shortings, individuals can get faster progress.I think I work well.電氣維修英文自我評價篇三Time
50、is always footsteps, how long a year? Three hundred si_ty-five sunrise, three hundred si_ty-five sunset only, _ in the alternation of sunrise and sunset in the past, look back this year's work And life full and half at a loss.This year I am still in Beidaihe sanatorium overall renovation project
51、 is responsible for electrical work.In the first half of the main construction, electrical construction to do with the civil pipe buried and ground lightning protection work, electrical project construction team is the local construction pany in Qinhuangdao, construction quality and the quality of t
52、he construction team in Beijing is not the slightest difference, the local quality inspection Department requirements are too low, so the first half of my identity is another professional quality inspectors, for their strict requirements but also to provide their own learning opportunities, in order
53、 to convince others of course, there are good reasons, professional aspectsShould have a solid professional knowledge.This project has a special case, close to the beach, the ground is hard rock, which encountered two situations, one, the seaside corrosion is particularly heavy, the original design
54、of all used galvanized steel pipe and welded steel pipe, the general situation Under the two management is the most durable, but not applicable at the beach, whether galvanized pipe or welded steel pipe bare in the air not more than two weeks above the thin layer of corrosion is a layer of light tou
55、ch It peeling off.Brush off the anti-rust paint had no effect.Project supervision to me when drawing this point, the beginning of half-doubt.In the design of the consent of the ground only part of the strong power to pvc pipe, concrete pipes are also used galvanized steel pipe, summer and a half mon
56、ths after the suspension, the site reserved for structural columns, steel pipe surface is a thick one Layer rust, I am surprised I secretly delighted: really do not listen to the old man made a loss in sight, the e_perience is really useful ah! Second, because the basis of the following are all rock, lightning effect is not good, the original design lightning protection grounding Practices fail to meet the requirements of the standard value, and other
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 疫情防控背景下學(xué)生心理輔導(dǎo)策略研究
- 銀行對公客戶業(yè)務(wù)場景化解決方案研究
- 智能分析學(xué)生體能測試數(shù)據(jù)的科技應(yīng)用探討
- 綠色校園的創(chuàng)建與學(xué)校環(huán)境教育的關(guān)系研究
- 語文教材分析與教師專業(yè)素養(yǎng)培育
- 2025年福建信息職業(yè)技術(shù)學(xué)院高職單招職業(yè)技能測試近5年??及鎱⒖碱}庫含答案解析
- 2025年漯河職業(yè)技術(shù)學(xué)院高職單招職業(yè)技能測試近5年??及鎱⒖碱}庫含答案解析
- 綠色健康寵物飼料的發(fā)展及挑戰(zhàn)
- 心理教育與健康生活課程設(shè)計策略與實踐
- 2025年普通機箱項目可行性研究報告
- 醫(yī)院培訓(xùn)課件:《如何撰寫護理科研標(biāo)書》
- 河南省鄭州市2023-2024學(xué)年高二上學(xué)期期末考試 數(shù)學(xué) 含答案
- 2024年山東省濟南市中考英語試題卷(含答案)
- 2024年北師大版八年級上冊全冊數(shù)學(xué)單元測試題含答案
- 江蘇省南京市第二十九中2025屆數(shù)學(xué)高二上期末學(xué)業(yè)質(zhì)量監(jiān)測模擬試題含解析
- 八年級下學(xué)期期末考試語文試題(PDF版含答案)
- 浙教版八年級下冊科學(xué)第一章 電和磁整章思維導(dǎo)圖
- (正式版)SH∕T 3541-2024 石油化工泵組施工及驗收規(guī)范
- 動物疫病傳染病防控培訓(xùn)制度
- 美團代運營合同模板
- 初中英語七選五經(jīng)典5篇(附帶答案)
評論
0/150
提交評論