![低壓柜廠驗(yàn)報(bào)告英文版_第1頁](http://file3.renrendoc.com/fileroot_temp3/2022-3/14/86a16de6-0601-4981-879e-aadd3543619e/86a16de6-0601-4981-879e-aadd3543619e1.gif)
![低壓柜廠驗(yàn)報(bào)告英文版_第2頁](http://file3.renrendoc.com/fileroot_temp3/2022-3/14/86a16de6-0601-4981-879e-aadd3543619e/86a16de6-0601-4981-879e-aadd3543619e2.gif)
![低壓柜廠驗(yàn)報(bào)告英文版_第3頁](http://file3.renrendoc.com/fileroot_temp3/2022-3/14/86a16de6-0601-4981-879e-aadd3543619e/86a16de6-0601-4981-879e-aadd3543619e3.gif)
![低壓柜廠驗(yàn)報(bào)告英文版_第4頁](http://file3.renrendoc.com/fileroot_temp3/2022-3/14/86a16de6-0601-4981-879e-aadd3543619e/86a16de6-0601-4981-879e-aadd3543619e4.gif)
![低壓柜廠驗(yàn)報(bào)告英文版_第5頁](http://file3.renrendoc.com/fileroot_temp3/2022-3/14/86a16de6-0601-4981-879e-aadd3543619e/86a16de6-0601-4981-879e-aadd3543619e5.gif)
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
1、 Low voltage panels1、Participants in FAT12. Location13、Date14、Item standard15、Purpose16、Inspection Contents16.1 Documents16.2. Equipment Inspection Items36.2.1 Visual inspection36.2.2. Routine Inspection Items56.2.3 Problem List67. FAT Record78. Attachments81、Participants in FATl Supervisor:l Genera
2、l contractor:l Manufacturer:.2. Location 3、Date 4、Item standardl Related product standards and specificationsl Factory Acceptance Test Outline5、PurposeFactory Acceptance Test can operate safely and dimensions of the equipment meet the requirements in the contract and related standards.6、Inspection C
3、ontents 6.1 Documents No.NameContentsQualified or Not(,X)Remarks1Qualification certificateQuality, environment, occupational health, and other management systemQualification of manufacturers2Factory inspection report Performance and function test reports of main parts3Main component1.Product quality
4、 certificate and related certificate documents 2.Product Certificate from supplier and incoming inspection report 3.Purchasing acceptance record and parts in-out records Inspector : Date: 6.2. Equipment Inspection Items 6.2.1 Visual inspection No.Test itemsInspection standardResultsQualified orNot(、
5、X)Remarks1Nameplate and markWhether the installation is reliable, label content is correct.2SprayThe panel color should be RAL7032,and the spraying element should be no flow marks, loss, and damage.3Mechanical operation components, interlocking, lock action reliabilityHuman subjects components, oper
6、ation is flexible and reliable4Wire and cable arrangementLayout is correct5Element selection and installationThe choice for element type should be correct, the element installation position should be correct, and element should be in order.6Parts of fixed connection reliabilityWhether or not the con
7、nection good contacts7The correctness of electrical circuitElectricity for five times, each time 1 s, instrument is normal, switch action is reliable8The reliability of the mechanism operationThe installation within the device switch electrical and all components of the manual operation for 5 times,
8、 whether the agency action is reliable, normal9Cabinet sizeRequirements for Height × width ×depth should be 2200mm × 800mm ×1000mmInspector: Date:6.2.2. Routine Inspection ItemsNO.Inspection itemsInspection standardResultsQualified orNot(、X)Remarks1Test the effectiveness of the p
9、rotective circuitInstrument door-to-ground 100mCradle-to-ground 100mMain switch base ground 100mBus clip bracket to ground 100mBreaker switch base ground 100m2Dielectric properties testBetween live parts and insulated operating handle3.75KV/1SBetween live parts and exposed conductive parts2.5 KV/1SB
10、etween each pole and connected to the exposed conductive parts of other poles 2.5 KV/1SBetween the main and auxiliary circuits not directly connected with the main circuit2 KV/1S3Insulation resistancerelative insulation resistance should be voltage1K/V1K/V 4ClearanceBetween the main circuit bare con
11、ductors of different polarity 5.5 mmBetween the main circuit of bare conductors with the housing 5.5mmCreepage distanceBetween the main circuit bare conductors of different polarity 10 mmBetween the main circuit of bare conductors with the housing 10 mmInspector: Date:6.2.3 Problem List NO.Descripti
12、onModification RecordRecorded by: Date: 7. FAT Record FAT Record of Low Voltage panels for Mombasa-Nairobi Standard Gauge Railway ProjectDate: Location:NO.Function CategoryTest ltem and StandardsTest resultConclusion1Visual inspectionRefer to section 6.2.1Refer to section 6.2.1PassFailure2Routine In
13、spection ItemsRefer to section 6.2.2Refer to section 6.2.2PassFailure3Problem ListRefer to section 6.2.3Refer to section 6.2.3PassFailureConclusion:ManufacturerSign:General contractorSign:SupervisorSign:SupervisorSign:8. Attachments Attachment 1:Technical SpecificationAttachment 2:Product certification certificateAttachment 3:Signature List of Factor Acceptance Test MembersAttac
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 公司施工合作合同范本
- 公路規(guī)劃合同范例
- 車輛保險(xiǎn)的申請書
- 2025年度服裝貼牌生產(chǎn)與批發(fā)銷售合同
- 2025年度企業(yè)落戶安全生產(chǎn)事故應(yīng)急處理協(xié)議
- 2025年互聯(lián)網(wǎng)公司員工期權(quán)激勵(lì)合同范本
- 2025年度生物工程實(shí)驗(yàn)室動物實(shí)驗(yàn)技術(shù)服務(wù)合同
- 進(jìn)團(tuán)委的申請書
- 申請調(diào)查令申請書
- 供貨合同范本酒水保真
- 2025年湖南九嶷職業(yè)技術(shù)學(xué)院高職單招職業(yè)技能測試近5年??及鎱⒖碱}庫含答案解析
- 農(nóng)產(chǎn)品貯運(yùn)與加工考試題(附答案)
- 幼兒園開學(xué)教職工安全教育培訓(xùn)
- 2025年高三歷史教學(xué)工作計(jì)劃
- 學(xué)校財(cái)務(wù)年終工作總結(jié)4
- 生態(tài)安全課件
- 鋼鐵是怎樣煉成的鋼鐵讀書筆記
- 2025年汽車加氣站作業(yè)人員安全全國考試題庫(含答案)
- 部編高教版2023·職業(yè)模塊 中職語文 《寧夏閩寧鎮(zhèn):昔日干沙灘今日金沙灘》課件
- 化工過程安全管理導(dǎo)則安全儀表管理課件
- 企業(yè)對外溝通與形象塑造制度
評論
0/150
提交評論