![哈納斯變電所施工計劃-2[精彩]_第1頁](http://file4.renrendoc.com/view/75fecd74b2850b8bd0c519e645392d9a/75fecd74b2850b8bd0c519e645392d9a1.gif)
![哈納斯變電所施工計劃-2[精彩]_第2頁](http://file4.renrendoc.com/view/75fecd74b2850b8bd0c519e645392d9a/75fecd74b2850b8bd0c519e645392d9a2.gif)
![哈納斯變電所施工計劃-2[精彩]_第3頁](http://file4.renrendoc.com/view/75fecd74b2850b8bd0c519e645392d9a/75fecd74b2850b8bd0c519e645392d9a3.gif)
![哈納斯變電所施工計劃-2[精彩]_第4頁](http://file4.renrendoc.com/view/75fecd74b2850b8bd0c519e645392d9a/75fecd74b2850b8bd0c519e645392d9a4.gif)
![哈納斯變電所施工計劃-2[精彩]_第5頁](http://file4.renrendoc.com/view/75fecd74b2850b8bd0c519e645392d9a/75fecd74b2850b8bd0c519e645392d9a5.gif)
版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、Content目 錄 TOC o 1-1 h z u HYPERLINK l _Toc283732626 1工程概況/Project General PAGEREF _Toc283732626 h 2 HYPERLINK l _Toc283732627 2編制依據/Compiling PAGEREF _Toc283732627 h 2 HYPERLINK l _Toc283732628 3設備參數(shù)Equipment Profile PAGEREF _Toc283732628 h 2 HYPERLINK l _Toc283732629 4設備的出庫及運輸/ Equipment Handover
2、& Transportation PAGEREF _Toc283732629 h 3 HYPERLINK l _Toc283732630 5設備的吊裝/Lifting PAGEREF _Toc283732630 h 4 HYPERLINK l _Toc283732631 6設備的安裝 Equipment Installation PAGEREF _Toc283732631 h 10 HYPERLINK l _Toc283732632 7質量保證措施Quality guarantee measures PAGEREF _Toc283732632 h 23 HYPERLINK l _Toc2837
3、32633 8平安措施Safety precaution: PAGEREF _Toc283732633 h 24 HYPERLINK l _Toc283732634 9工機具配備 /Construction Equipment & Tools PAGEREF _Toc283732634 h 25 HYPERLINK l _Toc283732635 10勞動力安排/Manpowe Schedule PAGEREF _Toc283732635 h 26 HYPERLINK l _Toc283732636 11三種吊車性能表/ Mobile Crane Lifting Graph PAGEREF _
4、Toc283732636 h 26工程概況/Project General哈納斯變電所施工方案-2中國第十一建設寧夏哈納斯工程工程部化學工程China Eleventh Chemical Construction Company Limited NingXia Hanas Project6 / 29Content目 錄1工程概況/Project General22編制依據/Compiling23設備參數(shù)Equipment Profi練薔炳氰睛攪寓兩茹節(jié)糜帕透酵嗡衰綱蛤株枕甸霸豺痊嫉攝眼曠譚齊色磅凈淳獻撅窩緬毗惑啥隊懸綱縛躲腐盯濰烽圖芥異摯掂俱軸度痔稱騁刺壘少根據Technip設計的哈納斯LNG
5、工程變電所的設備布置圖要求,在變電所安裝110KV變壓器2臺,單臺質量為62t除去現(xiàn)場組裝的附件質量;8臺干式變壓器,2臺自耦變壓器,最大的質量是8t;153面電氣盤柜,其質量在1t以下;由于本次設備吊裝有質量較大的設備,為保證吊裝順利進行和設備按要求安裝,特編制此方案,以指導施工。According to HANAS LNG Project Euipment Layout Drawing issued by TPT, installedin substation have 110Kv transformer, 2 sets, unit weight is 62t (site installe
6、d accessories not include), dry type transformer 8 sets, autotransformer 2 sets, the max weight is 8t, electrical cabinet 153 sets, the weight below 1t, due to the heavy lift, this method statement compiling for lifting and installation of equipment is shape up.編制依據/Compiling?電氣裝置安裝工程高壓電器施工及驗收標準?/ “
7、electrical installation project HV construction and inspection specificationGB50147-90?電氣裝置安裝工程盤、柜及二次回路結線施工及驗收標準?/ “electrical installation project cabinet and secondary loop tereminal construation and inspection specification GB50171-92?電氣裝置安裝工程電力變流設備施工及驗收標準?/ “electrical installation project curre
8、nt transformer construation and inspection specification GB50255-96設備參數(shù)Equipment Profile序號No.設備名稱Equipment數(shù)量Qty.質量KGWeight安裝標高米Elevation就位形式Type設備位置Location1110KV變壓器/ Transformer2580000.9立式/vertical110變電所/Substation 110210KV干式變壓器/ dry type transformer85000二層/2nd Floor立式/vertical110變電所及公用站變電所Substati
9、on 110 & Utility Substation3自耦變壓器/ autotransformer28000二層/2nd Floor立式/vertical110變電所/ Substation 110410KV中壓柜/ MV Cabinet29800二層/2nd Floor立式/vertical110變電所/ Substation 1105低壓柜及保護柜/ LV Cabinet137800二層/2nd Floor立式/vertical110變電所及公用站變電所Substation 110 & Utility Substation6GIS柜/ Cabinet7二層/2nd Floor立式/ver
10、tical110變電所/ Substation 110設備的出庫及運輸/ Equipment Handover & Transportation設備檢驗/ Equipment Inspection110KV變壓器由于設備太大,運輸直接到達現(xiàn)場,其余設備根據現(xiàn)場條件出庫,設備在吊裝之前需經過承包方及質檢方的共同檢驗,并做記錄,必要時要拍攝照片,設備主要符合下例要求:Due to the big bulk of 110Kv Transformer, it had better transfer to installation site directly, the other euqipemnt h
11、andover in accordance with actual condition. Equipment joint inspection carry out by TPT and ELECO, prior to lifting, record and take the photographer is necessary; the equipment should comply with the following standard:銘牌數(shù)據應符合設計要求。Nameplate data comply with engineering;油箱及所有附件應齊全,無銹蝕及機械損傷,密封應良好;油箱
12、與散熱管聯(lián)接處,放油法蘭閥無滲油現(xiàn)象,儲油柜油位略高于正常位置。Oil box and accessories in place, no rust and damage, seal in good condition, oil drain valve of joint between oil box and radiator dont have leakage, oil level of oil box higher slightly than normal level.高、中壓瓷件無損傷痕跡,瓷件 釉彩無撞擊脫落現(xiàn)象。HV & MV porcelain fits dont have dama
13、ge, glaze dont have break off.高、中壓引出線的螺栓絲扣無損傷,所帶墊片螺帽齊全,中壓引出線及螺栓、螺帽齊全。出廠的有關資料及產品證明文件齊全。Thread of HV & MV outgoint cable no damage, washers and nuts are complete, manufacturer files are complete.盤柜內的所有元器件均齊全,沒有外表損傷現(xiàn)象。Components inside of cabinet are complete, no damage in outlook.設備運輸Transportation變壓器
14、由于噸位太大,所以直接運至現(xiàn)場。Due to the big bulk of transformer, it should transfer to installation site directly.汽車載重噸位與上下壓盤柜和GIS系統(tǒng)柜裝車的重量相對應,吊車起吊能力應為1.52倍盤柜的重量。起重索具應檢查可靠、起吊時盤柜應使用吊裝帶兜底吊裝。吊索與鉛垂線的夾角不宜大于30度,起落要平穩(wěn)緩慢。裝車后,必須用繩索進行封車,才能進行運輸。在運輸中車速盡量均勻,注意行車平穩(wěn),禁止急煞車DWT of trailer match the weight of HV & LV and GIS system
15、 cabinet, SWL of crane should 1.52 times weight of cabinet. Lifting gear should in good condition and wrap the cabinet from bottom of cabinet by lifting belt for lifting, lifting slowly. Fix properly for transportation. Driving in constant speed, and avoid emergency brake.運至現(xiàn)場后視吊車位置停車,便于吊裝。Transport
16、or parking should according to crane location for lifting conveniencely.設備的吊裝/Lifting吊裝前準備工作/Preparation吊裝方案編制完畢,經承包商審核,確定無誤前方可施工;Submit lifting MS for approval prior to construction.施工前應對作業(yè)人員進行詳細的技術、平安交底;Particular Technical & safety disclosure to worker;吊裝用機、索具齊全到位,經檢查狀態(tài)需完好。Lifting equipment and g
17、ear available and in good condition;本次吊裝站車位置有兩處,一處在變電所東側110KV變壓器旁,一處在變電所西側V8管廊旁,吊車移動與站車區(qū)域場地地基需處理,地基需推平壓實,滿足吊裝要求。具體吊車站位的位置見附圖一所示There are two locations for crane setup; one is next to 110 Kv transformer on east side of substation, another one in on west side of substation, next piperack V8. Crane set
18、up area should leveling and tamp to fit lifting. Crane setup location see DWG-1 please.吊車站位附圖一/DWG-1(crane setup)設備吊裝/Lifting吊裝施工工藝 Lifting Process技術準備現(xiàn)場準備及場地處理設備運輸就位吊車到達作業(yè)條件吊裝索具拴掛試吊檢查及處理吊起設備落至道木垛吊車摘鉤設備移位至安裝位置吊起抽出滾杠落下就位吊裝完成Technology preparation site preparation & ground treatment equipment in place
19、 crane in work condition lifting gear hook uppre-lifting & treatment lifting equipment lay on the sleep wood remove lifting gear remove equipment to installation location lifting remove roller down to location lifting finish設備吊裝計算Calculation110KV變壓器計算吊裝參數(shù)/Lifting parameters 設備位號Item No.:TR00301 / TR
20、00302幾何尺寸/Size 7120*4720*6550 設備質量/Weight:62t 主吊耳為廠家已安裝吊耳/ Lifting lug installed by manufactor吊裝受力/Lifting StressTransformer圖示二 Dwg-2設備起吊時受力計算/Lifting Stress Calculation:F1=G1.1=68.2tF1為150噸汽車吊受力,工況為:桿長13.9米;工作半徑7米,起重能力68.9t;具體吊車性能表見第11項附表F1-150t Mobile Crane, work condition: boom length=13.9m, radi
21、us=7m, SWL=68.9tWORKING RANGES see the attached table of CLAUSE-11.F1= 68.2 t68.9t 平安/Safe。吊裝選用繩/steel wire rope:47.5 繩長/Length:12m 2根/Piece, 鋼絲繩的破斷拉力/Break Stress: Sb=117260Kg 平安系數(shù)/safety factor: K=6單股許用拉力/single-stranded available stress: P= Sb/K=19543Kg一彎兩股使用單股拉力/ single-stranded stress for doubl
22、e-stranded: P1=19543*0.9=17588.7kg17050kg (68.2t/4); 平安/Safe鋼絲繩的具體受力見附圖三所示:wire rope force analysis see the following DWG-3附圖三10KV變壓器及盤柜吊裝的計算/10Kv transformer & cabinet lifting calculation吊裝參數(shù)/Lifting parameters 設備位號Item No.:TR00321 / TR00322 幾何尺寸/ Size 2350*1700*2850 設備質量/Weight: 8t 主吊耳為廠家已安裝吊耳/ Li
23、fting lug installed by manufactor吊裝受力(圖紙和上圖同)/ Lifting Stress (Same as the drawing above)設備起吊時受力計算/ Lifting Stress Calculation:F1=81.1=8.8tF1為80噸汽車吊受力,工況為:桿長30米;工作半徑14.6米,起重能力10.0t;具體80噸吊車性能表見第11項附表F1-80t Mobile Crane, work condition: boom length=30m Lifting Radius=14.6m, SWL=10.0t80 Crane WORKING R
24、ANGES see the attached table of CLAUSE-11F1= 8.8 t10.0t 平安/Safe。選用吊裝帶/ Lifting Belt Selection:吊裝帶選用10t;平安/Safe設備卸車/ Unload110KV變壓器卸車/ Unload of 110Kv transformer變壓器在吊裝前,吊車先進場,進場前先平整場地,場地平整時到達150T汽車吊占車需要的地面壓實要求,吊裝場地應無雜物等影響吊裝作業(yè)。Prior to transformer lifting, leveling ground for crane setup, leveling ar
25、ea fit the requestion of 150t mobile crane, and tamp, clear the sundries for lifting.變壓器使用150T汽車吊直接吊至變壓器根底上,具體吊裝站位和工作半徑如以下圖所示:Lift the transformer to foundation directly, the crane location and lifting diagram see the following:圖示四/DWG-410KV變壓器、電氣盤柜及GIS系統(tǒng)柜卸車Unload of 10Kv transformer, electrical cab
26、inet and GIS system cabinet圖示五運輸平臺使用設計的專用平臺進行作業(yè)。此平臺是7055U-003-DW-16-42-009圖紙上設計的,平臺的設計承重荷載是25KN/m2。平臺使用前必須經過驗收合格,方可使用。Use the special working plate for transportation. The work plate in accordance with drawing 7055U-003-DW-16-42-009, the designing bearing capacity is 25 KN/m2. It has to apply for in
27、spection prior to using, only the qualified work plate could be use.滾杠選用/roller selection:選用323.75 L=2m鋼管/ Steel tube 10根/Pic.2t的手動液壓推車2臺。Hydro-trolley 2sets.10KV變壓器使用80t吊車把變壓器從管廊上側運至平臺上,如圖五所示,然后使用滾杠把變壓器運至安裝位置,然后使用門型架子,把變壓器吊起,送至安裝位置固定。Lift the 10kv transformer to access plate from piperack by 80t cr
28、ane, (see dwg-5), and then remove transformer to installation location by roller, hoist the transformer by lifting frame, located and fixed it.電氣盤柜使用80t吊車把電氣盤柜從管廊上側運至平臺上,如圖五所示,然后使用手動液壓推車把盤柜運至安裝位置,按設計設計的盤柜順序固定。Lift the electrical cabinet to access plate from piperack by 80t crane, (see Dwg-5), and th
29、e remove the cabinet to installation location by hydro-trolley, cabinet installation order following engineering design.110KV變壓器至根底上/ 110KV Transformer to Foundation變壓器到位后,由于變壓器室是非封閉的,所以150t吊車占車在變壓器室的門口,把變壓器吊起,然后使設備的中心落至變壓器根底中心上。After transformer placed, due to transformer room doesnt confined, so s
30、etup the 150t crane at the gate of transformer room, lift it and located on foundation.機具、索具選用一覽表/ Lifting equipment & gear list序號/No.名稱/Equipment型 號 規(guī) 格/ Type單位/Unit數(shù)量/Qty備注/Note1汽車吊/Mobile CraneQY100H-2 150t 臺/Set12吊裝帶/ Lfting Belt10t根/Pic.23卸扣/ Shackle80t & 10t個/Pic.各/every 4證書見附件Certification Se
31、e attachment please4鋼絲繩/ Wire Rope47.5, 12m根/Pic.25手拉葫蘆/ Chain Block15t個/Pic.1設備的安裝 Equipment Installation變壓器安裝/ Transformer Installation變壓器根底安裝/ Transformer Support Installation本變電所的配電變壓器根底型鋼設計外框是10#槽鋼,內側是使用10#槽鋼,安裝的方式是立式安裝,型鋼安裝后,先進行防腐處理,然后進行面漆處理。Sub-transformer shape steel support of substation de
32、signed as 10# channel steel for out frame, 10# channel steel for inside, standing installation, painting and touch-up after shape steel installation.在鋼制平臺上將型鋼的平面及立面分別平整,校直,全長偏差控制在1-5mm之內包括平面和立面。下料時盡量少用氣割,以減小型鋼的變形度。Section steel shall be leveled and lined on steel plate, the allowable error of the wh
33、ole length is 1-5mm. (include horizontal and vertical levels), It is not suitable that cut material with gas welding to avoid change shape.根底型鋼的組對焊接應有熟練的焊工施焊。變壓器的根底型鋼外框和盤柜根底同時制作。 Assembly and welding of support shape steel on foundation shall be carried out by skilled welder. Transformer support out
34、 frame and cabinet support fabricated together.變壓器就位和附件安裝Transformer Located & Accessories Installation變壓器前吊裝檢查變壓器的根底道軌寬度與變壓器道軌寬度一致。變壓器就位固定必須依據圖紙尺寸進行,對沒有設計具體尺寸的那么應根據變壓器二次出線的B相與中壓進線盤的B相對準。確定位置后,應用角鋼將變壓器固定在根底槽上。Check the support track size match to transformer track size or not, transformer located co
35、mply with drawing, if there isnt detailed size, it should according to the B-phase of transformer secondary outgoing cable match B-phase of MV inlet cabinet. After location confirmed, fix the transformer on the support by angle-steel.哈納斯變電所施工方案-2中國第十一建設寧夏哈納斯工程工程部化學工程China Eleventh Chemical Construct
36、ion Company Limited NingXia Hanas Project6 / 29Content目 錄1工程概況/Project General22編制依據/Compiling23設備參數(shù)Equipment Profi練薔炳氰睛攪寓兩茹節(jié)糜帕透酵嗡衰綱蛤株枕甸霸豺痊嫉攝眼曠譚齊色磅凈淳獻撅窩緬毗惑啥隊懸綱縛躲腐盯濰烽圖芥異摯掂俱軸度痔稱騁刺壘少變壓器在安裝合格以后,進行附件安裝:由于110KV變壓器是接線箱、油箱、散熱片、溫度計等附件均是分體的。所以安裝附件是變壓器安裝的一個重要環(huán)節(jié)。使用25T吊車因最重的油箱蓋是5.5t配合安裝變壓器附件,附件安裝時注意密封,尤其是油路的密封件一
37、定齊全、可靠。此安裝廠家配合。所有的安裝附件完成后,取本體變壓器油和待注入的油各一瓶500g,送專門檢驗所做油混合試驗,待絕緣油檢驗合格后,進行注油,注油時注意油標的指示,按照廠家的要求,注至油位。注油完畢, 24小時后,檢查變壓器是否有滲漏,否那么需進一步處理,正常方可進行下道工序。After transformer installation qualified, install the accessories: due to the junction box, oil box, radiation fins and thermometer of 110Kv transformer is s
38、eparated, so accessoried installation is key to transformer installation. We plan use 25t mobile crane assist accessories installation (the heavyest oil box cover is 5.5t), pay attention to seal while accessoried installation, especially the oil-way seal fits have to completely and properly. After a
39、ccessories installation finish, sampling oil from transformer body and infuseoil 500g, send to oil mix examinating by professional lab, oiling after examined, oiling to scale according to manufacturer. After 24 hours from oiling finish, check the leakage, go to next procedure if in good condition.就地
40、的溫度計只需在溫水里面試驗一下保證讀數(shù)正確,即可安裝,安裝時在溫度計套管里面放少許變壓器油即可。遠傳溫度計,需要用萬用表檢查一下低溫/高溫節(jié)點是否可靠,限位點設置的是否適宜,溫度計應根據設計數(shù)值或出廠規(guī)定進行整定。溫度計盤面應對著巡檢易視處,金屬毛細管的彎曲半徑不得小于50mm。監(jiān)視或保護變壓器的二次電纜外引線、排列應整齊,應有保護措施,接線盒應密封良好,端子接線有標識。接線時一定分清公用線和高/低溫線。壓力釋放裝置出廠已裝好,且出廠時已做試驗,現(xiàn)場只需檢查引出電接點動作是否正確。壓力信號接點應動作正確,導通良好。接線箱安裝主要是保證不能碰到瓷瓶,螺栓固定牢靠。油箱的位置保證是設計位置,保證油
41、箱內沒有雜物。哈納斯變電所施工方案-2中國第十一建設寧夏哈納斯工程工程部化學工程China Eleventh Chemical Construction Company Limited NingXia Hanas Project6 / 29Content目 錄1工程概況/Project General22編制依據/Compiling23設備參數(shù)Equipment Profi練薔炳氰睛攪寓兩茹節(jié)糜帕透酵嗡衰綱蛤株枕甸霸豺痊嫉攝眼曠譚齊色磅凈淳獻撅窩緬毗惑啥隊懸綱縛躲腐盯濰烽圖芥異摯掂俱軸度痔稱騁刺壘少Local thermometer test in water bath to ensure t
42、he correct reading and then installed, oiling into thermometer sleeve. 10KV變壓器的安裝,由于是干式變壓器,變壓器按照設計位置固定后,安裝溫控器,檢查散熱風扇齊全即可。10Kv transformer is dry type, after transformer fixed according to design position, install the thermometer, check the cooling fan.電氣盤柜及GIS系統(tǒng)安裝/Electrical Cabinet & GIS System Ins
43、tallation根底型鋼安裝Installation for section steel on foundation本變電所的電氣盤柜及GIS系統(tǒng)的根底型鋼設計是10#槽鋼,安裝的方式是立式安裝,型鋼安裝后,先進行防腐處理,然后進行面漆處理。Electrical cabinet support and GIS shape steel support of substation designed as 10# channel steel and installation in vertical, painting and touch-up after shape steel installat
44、ion.在鋼制平臺上將型鋼的平面及立面分別平整,校直,全長偏差控制在1-5mm之內包括平面和立面。Leveling and alignment of shape steel on steel work plateform, control the error under 1-5mm (plane and side)下料時盡量少用氣割,以減小型鋼的變形度。Section steel shall be leveled and lined on steel plate, the allowable error of the whole length is 1-5mm. (include horizo
45、ntal and vertical levels) It is not suitable that cut material with gas welding to avoid change shape.根底型鋼的組對焊接應有熟練的焊工施焊。型鋼與支腿之間采用鋼板過渡,為方便運至現(xiàn)場,型鋼應分段制作。 哈納斯變電所施工方案-2中國第十一建設寧夏哈納斯工程工程部化學工程China Eleventh Chemical Construction Company Limited NingXia Hanas Project6 / 29Content目 錄1工程概況/Project General22編制
46、依據/Compiling23設備參數(shù)Equipment Profi練薔炳氰睛攪寓兩茹節(jié)糜帕透酵嗡衰綱蛤株枕甸霸豺痊嫉攝眼曠譚齊色磅凈淳獻撅窩緬毗惑啥隊懸綱縛躲腐盯濰烽圖芥異摯掂俱軸度痔稱騁刺壘少Butt connection of section steel on foundation shall be carried out by skilled welder. Section steel shall be fabricated in sections to be convenient for transportation.嚴格按照施工圖所示尺寸,并結合制造廠產品樣品,測量各種盤柜的準確尺寸
47、,尤其是確保母線橋的安裝尺寸。Section steel shall be fabricated base on construction drawing or manufactures requirement or the actual size of the panel, where there is bus, the installation size shall be ensured.采用測平儀測量室內地坪的上下差,找出標準點后,按設計高度進行找平。本裝置的預埋鐵土建已經埋設完成。Measure the difference level of the floor by level, c
48、hoose a point as reference, level it according to design height. Embeded steel of this project finished by civil constructor根底型鋼的找平應采用墊鐵找平,分段找平直采用點焊,待整體找平后再進行最后焊接。 Leveling-off of shaped steel foundation shall use liners, when leveling in sections, use spot-weld after the whole foundation is leveled
49、, weld completed.根底型鋼的安裝應符合以下要求:Installation of section steel on foundation shall comply with the following requirement:a、根底型鋼安裝的允許偏差工程允許偏差mm/mmm/全長不直度15水平度15位置誤差及不平行度5a Deviation allowance for shaped steel foundation:itemallowancemm/mmm/whole lengthalignment15levelness15location error and paralleli
50、sm5b、根底型鋼安裝后,其頂部宜高出地平面10mm,手車式成套柜按產品技術要求進行。 The roof of installed foundation shall be 10mm higher than level of floor. The installation of foundation for trunk-typed assembled panels shall accord to technical requirement.C、根底型鋼應有明顯的不少于兩點的可靠接地。 The section steel on foundation shall be grounded tightl
51、y by at least 2 points. 與盤柜安裝工程有關的建筑工程的施工,應符合以下要求:Relevant building for panel installation is accordance with requirement as following:與盤柜安裝有關的建筑物、構筑物的建筑工程質量,應符合國家現(xiàn)行的建筑工程施工及驗收標準中的有關規(guī)定。The construction quality releated building, structure to cabinet installation should comply with state existing regu
52、late of construction and acception.屋頂、樓板施工完畢,不得滲漏。室內地面工作結束,室內溝道無積水、雜物。Roof, floor construction finished, it cant have leakage, internal flooring finished, ditch clean and no sundries and seeper.預埋件及預埋孔符合設計要求。門窗安裝完畢。進行裝飾工作有可能損壞已安裝設備或設備安裝后不能再進行施工的裝飾工作已全部結束。Roof floon completed and no leakage, floor wo
53、rk completed and pre-cast hole O.K., Door and windows completed,與土建單位辦理必要工程工序交接手續(xù)。Complete release procedure with civil contractor.盤柜安裝/ Installation for panel根據變電所情況,采用手液壓動小車將盤柜運至室內。Remove cabinet to internal of substation by hydro-trolley.對于多臺組合柜及超重盤柜要制作專用的移開工具。For combined panels or over weight p
54、anel, special mobile tool shall be fabricated.將盤柜按設計要求的順序逐臺找正,固定盤柜的緊固件應用鍍鋅制品。Align the panels one by one according to designers requirement, (tightening piece shall be galvanized)盤、柜及盤、柜內設備與各構件間連接應牢固。根據設計圖紙,要求電氣盤柜和根底連接采用焊接連接,焊接后噴涂防腐漆料。Comeetion between panels or equirment and frames shall be firm.Co
55、ntrol boarel DC.cabinent relay protection panel and automatic device panel shall not be welded on foundation but be connected with bolts.If there is special requirement in instruction book fon import panels ,take the book as standard.盤柜在組立時,應從進線柜開始,進線柜的母線應和變壓器對應,以便后期母線橋的安裝。Cabinet assembly from adva
56、nce wire cabinet, generatrix of advance wire cabinet match to transformer, it is in order to generatrix bridge installation.盤、柜單獨或成列安置時,其垂直度、水平偏差以及盤、柜面偏差和盤、柜間接縫的允許偏差應符合以下規(guī)定:.For panel installed installed individually or in line,the allowances shall be:盤、柜安置的允許偏差工程/Item允許偏差/ Allowance垂直度/Verticalitym
57、1.5水平偏差/roof相鄰兩盤頂部/Ajacement panels2成列盤頂部/Panels in line5盤面偏差/surface相鄰兩盤邊/Ajacement panels1成列盤面/Panels in line5盤間接縫/Seam between panels2盤柜的接地應牢固良好,同一列盤柜應有不少于兩點接地,接地線應直接與主母線或接地匯流排相連接,接地線采用黃綠接地軟銅線,具體規(guī)格應遵循設計圖紙。裝有供檢修用的接地裝置,應明顯可靠,便于安裝臨時接地線。 Panels shall be grounded firmly and equipment with grounding de
58、vice for maintenamce.GIS系統(tǒng)安裝/ GIS system installation在制造廠已組裝好的各部件在安裝時不得隨意拆卸。假設必須拆卸時,就先取得制造廠同意,或在制造廠派人指導下進行。The assemblyed components by manufacturer cant disassembly optionally, if necessary, the disassembly has to perform under the manufacturer guide.GIS主要元器件安裝/ GIS main components installation基準間隔
59、就位/ Basic Distance Location以主母線單元為最先就位設備,按照廠家提供的裝箱清單及設備安裝順序,將設備吊入110KV GIS安裝地點,再進行拼裝。It base on main generatrix unit located, in manufacturer packing list and equipment installation order, remove the equipment to 110Kv GIS installation location, and assembly.為減少安裝累積誤差,確定主變進線為就位基準間隔,其它間隔應從主變進線間隔開始向兩側
60、依次連接。采用吊車、鋼管、千斤頂?shù)裙C具,將所有間隔主母線單元初步就位。In order to reduce the installation cumulative error, confirm the located benchmark distance based on main transformer advance wire, the other distance connect in turn from main transformer advance wire distance to two sides.采用水準儀、鉛錘、千斤頂確定主母線中心標高,主母線中心線標高=基準間隔主母線裝
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 電子病歷系統(tǒng)在提升患者體驗中的應用
- 中國衣領凈洗滌劑市場供需現(xiàn)狀及投資戰(zhàn)略研究報告
- 2024河南石油鉆采專用設備制造市場前景及投資研究報告
- 生物醫(yī)藥產業(yè)的市場營銷策略與實踐
- 負載枯草芽孢桿菌的殼聚糖微球修復鉻污染土壤的機制研究
- 細粒棘球蚴感染但未致病的免疫記憶性研究
- 建設項目環(huán)境影響報告表編制技術指南(污染影響類)格式
- 功能對等理論視角下定語從句的翻譯策略研究
- 2025年中國水性工業(yè)涂料行業(yè)市場發(fā)展現(xiàn)狀及投資方向研究報告
- 基于體驗學習圈的初中地理大單元教學設計與實踐研究
- 2024年云南省公務員考試【申論縣鄉(xiāng)卷、行測、事業(yè)單位招聘】3套 真題及答案
- 300畝文冠果樹栽培基地建設項目可行性研究報告
- 數(shù)字媒體藝術專業(yè)行業(yè)分析報告
- 2025年度企業(yè)安全生產與環(huán)保管理服務協(xié)議范本3篇
- 全國職業(yè)院校技能大賽高職組(市政管線(道)數(shù)字化施工賽項)考試題庫(含答案)
- 湖南省長沙市長郡教育集團2024-2025學年七年級上學期期末考試英語試題(含答案)
- 公司員工升職加薪制度模板
- 2024上海市招聘社區(qū)工作者考試題及參考答案
- 鄉(xiāng)鎮(zhèn)衛(wèi)生院服務能力建設醫(yī)療質控部分課件
- 春季開學教職工安全培訓
- (正式版)JTT 1497-2024 公路橋梁塔柱施工平臺及通道安全技術要求
評論
0/150
提交評論