1、工廠工程鋼結(jié)構(gòu)專項施工方案玩具中國工廠項目General Contractor & SteelStructure總包和鋼結(jié)構(gòu)工程1.3. Steelwork Method Statement鋼結(jié)構(gòu)施工方案Contents目 錄 TOC o 1-2 h z u Section 1 Edition Instruction PAGEREF _Toc381431148 h 6第一節(jié) 編制說明 PAGEREF _Toc381431149 h 61.1. Reference PAGEREF _Toc381431150 h 61.1. 編制依據(jù) PAGEREF _Toc381431151 h 61.2.Re
2、fer Nation Codes PAGEREF _Toc381431152 h 61.2.參考的國家標(biāo)準(zhǔn) PAGEREF _Toc381431153 h 61.3.Refer local, industry codes, regulations, specifications PAGEREF _Toc381431154 h 71.3.參考的其他標(biāo)準(zhǔn) PAGEREF _Toc381431155 h 7Section 2 General and Characteristic PAGEREF _Toc381431156 h 8第二節(jié) 工程概況及特點 PAGEREF _Toc381431157 h
3、82.1.Project Resume PAGEREF _Toc381431158 h 82.1.工程概況: PAGEREF _Toc381431159 h 82.2.Scope PAGEREF _Toc381431160 h 82.2.工作范圍: PAGEREF _Toc381431161 h 82.3.Project Characteristics PAGEREF _Toc381431162 h 102.3.工程特點 PAGEREF _Toc381431163 h 10Section 3 Construction Arrangement PAGEREF _Toc381431164 h 12
4、第三節(jié) 施工總體部署 PAGEREF _Toc381431165 h 123.1.Project phases PAGEREF _Toc381431166 h 123.1.工程項目任務(wù)安排 PAGEREF _Toc381431167 h 123.2.Principle PAGEREF _Toc381431168 h 123.2.原則要求 PAGEREF _Toc381431169 h 12Section 4 Construction Organization PAGEREF _Toc381431170 h 14第四節(jié) 施工組織部署 PAGEREF _Toc381431171 h 144.1.P
5、roject Management Organization chart PAGEREF _Toc381431172 h 144.1.項目組織機(jī)構(gòu) PAGEREF _Toc381431173 h 144.2.Manpower PAGEREF _Toc381431174 h 144.2.勞動力計劃表 PAGEREF _Toc381431175 h 144.3.List of equipments and tools on site PAGEREF _Toc381431176 h 154.3.現(xiàn)場使用主要機(jī)具設(shè)備一覽表 PAGEREF _Toc381431177 h 154.4.List of e
6、quipments and tools in workshop PAGEREF _Toc381431178 h 174.4.車間使用主要機(jī)具設(shè)備一覽表 PAGEREF _Toc381431179 h 17Section 5 Construction Schedule and Control Measure PAGEREF _Toc381431180 h 19第五節(jié) 施工進(jìn)度計劃和工期控制措施 PAGEREF _Toc381431181 h 195.1.Construction schedule PAGEREF _Toc381431182 h 195.1.施工進(jìn)度計劃 PAGEREF _Toc3
7、81431183 h 195.2.Control measure for schedule PAGEREF _Toc381431184 h 195.2.工期控制措施 PAGEREF _Toc381431185 h 19Section 6 Design Developing Plan for steel structure PAGEREF _Toc381431186 h 20第六節(jié) 鋼結(jié)構(gòu)深化設(shè)計方案 PAGEREF _Toc381431187 h 206.1. Detail design Staff PAGEREF _Toc381431188 h 20深化設(shè)計人員配置表: PAGEREF _T
8、oc381431189 h 206.2、Detail design proposal PAGEREF _Toc381431190 h 20深化設(shè)計方案 PAGEREF _Toc381431191 h 20Section 7 Installation of Steel Structure PAGEREF _Toc381431192 h 28第七節(jié) 鋼結(jié)構(gòu)安裝施工方案 PAGEREF _Toc381431193 h 287.1. Anchor Bolts and Preparation before Hoist PAGEREF _Toc381431194 h 287.1. 地腳螺栓和吊裝前準(zhǔn)備:
9、PAGEREF _Toc381431195 h 287.2. Work flow PAGEREF _Toc381431196 h 317.2. 施工工藝流程 PAGEREF _Toc381431197 h 327.3. Hoisting PAGEREF _Toc381431198 h 337.3. 吊裝綜述 PAGEREF _Toc381431199 h 337.4. Protection for equipments around the installation area before work PAGEREF _Toc381431200 h 407.4. 安裝前周邊設(shè)施的保護(hù)和防護(hù) PA
10、GEREF _Toc381431201 h 407.5. Scaffolding PAGEREF _Toc381431202 h 417.5. 腳手架的搭設(shè) PAGEREF _Toc381431203 h 417.6 Hoisting and Installing Steel Column PAGEREF _Toc381431204 h 437.6、鋼柱吊安裝 PAGEREF _Toc381431205 h 437.7. Hoisting and Adjusting Steel Beam PAGEREF _Toc381431206 h 457.7、鋼梁吊裝、找正 PAGEREF _Toc381
11、431207 h 457.8. Installing Puling and Support System PAGEREF _Toc381431208 h 477.8檁條及支撐系統(tǒng)的安裝 PAGEREF _Toc381431209 h 477.9 Installation and attention of high strength bolt PAGEREF _Toc381431210 h 487.9. 高強(qiáng)度螺栓的安裝方法及注意事項 PAGEREF _Toc381431211 h 487.10.Site welding PAGEREF _Toc381431212 h 497.10、現(xiàn)場焊接安裝
12、 PAGEREF _Toc381431213 h 497.11. Secondary grouting PAGEREF _Toc381431214 h 507.11、二次灌漿 PAGEREF _Toc381431215 h 507.12. Paint makeup PAGEREF _Toc381431216 h 507.12、油漆修補(bǔ) PAGEREF _Toc381431217 h 507.13. FF coating: PAGEREF _Toc381431218 h 517.13、防火涂料 PAGEREF _Toc381431219 h 517.14 Installing Roof Pane
13、l and Wall Panel PAGEREF _Toc381431220 h 547.14屋面/墻面板安裝方法 PAGEREF _Toc381431221 h 54Section 8 Quality Measure and Instruction PAGEREF _Toc381431222 h 57第八節(jié) 質(zhì)量技術(shù)措施及說明 PAGEREF _Toc381431223 h 578.1. Quality control web PAGEREF _Toc381431224 h 578.1. 工程質(zhì)量管理網(wǎng)絡(luò) PAGEREF _Toc381431225 h 578.2. Quality assu
14、rance system block diagram PAGEREF _Toc381431226 h 588.2. 施工現(xiàn)場質(zhì)量保證體系框圖 PAGEREF _Toc381431227 h 588.3. Quality target and measure PAGEREF _Toc381431228 h 588.3. 工程質(zhì)量目標(biāo)和措施 PAGEREF _Toc381431229 h 588.4. Quality Assurance PAGEREF _Toc381431230 h 598.4. 質(zhì)量保證措施 PAGEREF _Toc381431231 h 598.5. Quality stan
15、dards PAGEREF _Toc381431232 h 648.5. 工程質(zhì)量標(biāo)準(zhǔn) PAGEREF _Toc381431233 h 64Section 9 HSE Management PAGEREF _Toc381431234 h 70第九節(jié) 安全管理 PAGEREF _Toc381431235 h 709.1. PPE PAGEREF _Toc381431236 h 709.1. 勞保著裝 PAGEREF _Toc381431237 h 709.2. Safety identification PAGEREF _Toc381431238 h 709.2. 安全標(biāo)識 PAGEREF _T
16、oc381431239 h 709.3. Construction power PAGEREF _Toc381431240 h 709.3. 施工用電 PAGEREF _Toc381431241 h 709.4. Scaffolding PAGEREF _Toc381431242 h 719.4. 腳手架 PAGEREF _Toc381431243 h 719.5. Protective measures taken along dangerous edges PAGEREF _Toc381431244 h 729.5. 臨邊防護(hù) PAGEREF _Toc381431245 h 729.6.
17、Work at Heights PAGEREF _Toc381431246 h 729.6. 高處作業(yè) PAGEREF _Toc381431247 h 729.7. Steel Lifting PAGEREF _Toc381431248 h 739.7. 吊裝作業(yè) PAGEREF _Toc381431249 h 739.8 FIRE PROTECTION PAGEREF _Toc381431250 h 749.8 防火 PAGEREF _Toc381431251 h 74Section 10 Finished Product Protection PAGEREF _Toc381431252 h
18、 77第十節(jié) 成品保護(hù) PAGEREF _Toc381431253 h 7710.1、Finished product protection during fabrication 制作過程中的成品保護(hù) PAGEREF _Toc381431254 h 7710.2、Finished product protection during transportation 運(yùn)輸過程中的成品保護(hù) PAGEREF _Toc381431255 h 7710.3、Finished product protection on site 現(xiàn)場成品保護(hù) PAGEREF _Toc381431256 h 78Appendi
19、x 1: layout of steel structure construction PAGEREF _Toc381431257 h 80附件一:鋼結(jié)構(gòu)現(xiàn)場平面布置圖 PAGEREF _Toc381431258 h 80Section 1 Edition Instruction第一節(jié) 編制說明1.1. Reference 1.1. 編制依據(jù)Tendering drawing provided by FONTERRA根據(jù)發(fā)包方提供的投標(biāo)圖紙。Actual situation on site現(xiàn)場實際情況。Construction code, standard and regulation相關(guān)的施
20、工規(guī)范、標(biāo)準(zhǔn)、規(guī)程。FONTERRA specifications 業(yè)主的企業(yè)標(biāo)準(zhǔn)Refer Nation Codes參考的國家標(biāo)準(zhǔn)GB50009-2012Load code for the design of building structures建筑結(jié)構(gòu)荷載規(guī)范 GB50017-2003Code for design of steel structure鋼結(jié)構(gòu)設(shè)計規(guī)范GB50011-2010Code for seismic design of buildings建筑抗震設(shè)計規(guī)范GB50191-2012Design code for anti-Semitic of special struc
21、tures構(gòu)筑物抗震設(shè)計規(guī)范GB50223-2008Standard for classification of seismic protection of building建筑抗震設(shè)防分類標(biāo)準(zhǔn)GB50046-2008Code for anticorrosion design of industry constructions工業(yè)建筑防腐設(shè)計規(guī)范GB50300-2001Code for acceptance of construction quality of steel structures建筑工程施工質(zhì)量驗收統(tǒng)一標(biāo)準(zhǔn)GB50205-2001Code for acceptance of co
22、nstruction quality of steel structures鋼結(jié)構(gòu)工程施工質(zhì)量驗收規(guī)范GB50212-2002Code for acceptance of construction quality of anticorrosion建筑腐蝕工程施工及驗收規(guī)范Refer local, industry codes, regulations, specifications參考的其他標(biāo)準(zhǔn)CECS 24:90Regulation of application technology of fire resistive coating for steel structure鋼結(jié)構(gòu)防火涂料應(yīng)用
23、技術(shù)規(guī)程CECS200:2006Regulation of fire protection for steel structure建筑鋼結(jié)構(gòu)防火技術(shù)規(guī)范DGJ08-9-2003Code for seismic design of buildings建筑抗震設(shè)計規(guī)程JGJ81-2002Technical specification of welding of steel structure建筑鋼結(jié)構(gòu)焊接技術(shù)規(guī)程Section 2 General and Characteristic第二節(jié) 工程概況及特點Project Resume工程概況:Project name: LEGO Toy Manuf
24、acturing(Jiaxing)China Factory Project工程名稱:玩具中國工廠項目Owner: LEGO Toy Manufacturing (Jiaxing) Co., Ltd (hereafter referred to Owner)工程業(yè)主:玩具制造()有限公司建筑設(shè)計公司SATER-PROJECTSATER-PROJECTDesign Company: The Eleventh Design&Reserch Institute Of IT ,Co.,Ltd設(shè)計單位: Design institute: SIPPR ENGINEERING CROUP CO., LTD
25、Scope工作范圍:The buildings in this project are mainly steel structure (the energy center is composite structure). The pillars of factory and warehouses are H-shaped steel, grid column. Truss structure is used in roofing structure. The roofing system adopts steel plate used in floor, modified pitch wate
26、rproof roll, hard glass heat preservation zone calcium silicate board with 270mm thick, and TPO soft waterproof roll. The wall system adopts sandwich shingle of 200mm. 本項目主要建筑均為鋼結(jié)構(gòu)(能源中心為混合結(jié)構(gòu))。廠房和庫房的柱子采用H型鋼,格構(gòu)式鋼柱,屋面結(jié)構(gòu)采用桁架結(jié)構(gòu),屋面系統(tǒng)采用樓壓型鋼板加改性瀝青防水卷材加270mm厚的硬質(zhì)玻璃面保溫帶硅酸板加TPO的柔性防水卷材,墻面系統(tǒng)采用200mm的三明治墻面板。List of
27、 steel structure buildings鋼結(jié)構(gòu)單體列表序號No.編號Building NO建筑物名稱Building Name占地面積Footprint Area建筑面積Floor area結(jié)構(gòu)形式StructureNote備注1CN-01-01預(yù)包裝車間PRE PACK8699.829758.04Steel str.鋼結(jié)構(gòu)2CN-01-02包裝車間PACK8141.129037.38Steel str.鋼結(jié)構(gòu)3CN-01-03最終包裝車間FINAL PACK8141.068869.88Steel str.鋼結(jié)構(gòu)4CN-01-04預(yù)包裝車間PRE PACK8684.569765.2
28、8Steel str.鋼結(jié)構(gòu)5CN-01-05包裝車間PACK8141.129155.26Steel str.鋼結(jié)構(gòu)6CN-01-06最終包裝車間FINAL PACK8141.068869.88Steel str.鋼結(jié)構(gòu)7CN-01-07人工倉庫MANUAL WAREHOUSE19804.5427874.54Steel str.鋼結(jié)構(gòu)8CN-01-08工業(yè)配套用房(一)辦公區(qū)一-OFFICE-I1988864367.64Steel str.鋼結(jié)構(gòu)9CN-01-09工業(yè)配套用房(二)辦公區(qū)一-OFFICE-1354.63006.06Steel str.鋼結(jié)構(gòu)10CN-01-10OFFICE-工業(yè)
29、配套用房(三)辦公區(qū)一-1486.13314.62Steel str.鋼結(jié)構(gòu)11CN-01-11OFFICE-工業(yè)配套用房(四)辦公區(qū)一-845.932015.22Steel str.鋼結(jié)構(gòu)12CN-02-01MATERIAL CORRIDOR材料通道809.862107.43Steel str.鋼結(jié)構(gòu)13CN-02-02HANDLING中轉(zhuǎn)車間7683.7815818.33Steel str.鋼結(jié)構(gòu)14CN-02-03HBWH高架倉庫6618.366618.36Steel str.鋼結(jié)構(gòu)15CN-02-04PROCESSING工藝加工車件10407.524447.57Steel str.鋼結(jié)
30、構(gòu)Not for this phase16CN-03-01SERVICE BUILDING支持車間12666.5117555.61Steel str.鋼結(jié)構(gòu)17CN-03-02MOULDING注塑車間17200.5819703.99Steel str.鋼結(jié)構(gòu)18CN-03-03ENERGY CENTRE工業(yè)配套用房(五)能源中心4864.175294.84Blend str.混合結(jié)構(gòu)22CN-05-01WASTE STORAGE SHELTER工業(yè)配套用房(九)廢料棚401.52401.52Steel str.鋼結(jié)構(gòu)23CN-05-02BICYCLESHELTER 工業(yè)配套用房(十)自行車棚9
31、60480Steel str.鋼結(jié)構(gòu)In this project, the bolt will be shear high strength bolt with grade 10.9 and the grade of raw material should be accordance with design drawing. All steel members should be galvanized as per design requirements after fabrication. According to design requirements, main materials o
32、f roof beam, crane beam and column will be weld joint spliced in factory and weld joint tested per Class II, others will be tested per Class III. 本工程現(xiàn)場采用的高強(qiáng)度螺栓為10.9級高強(qiáng)度扭剪型高強(qiáng)螺栓,同時,原材料的材質(zhì)應(yīng)符合設(shè)計圖紙要求。所有構(gòu)件制作完畢后應(yīng)根據(jù)設(shè)計要求進(jìn)行防腐處理。根據(jù)設(shè)計要求:屋面梁,吊車梁和柱子的主材工廠拼接焊縫按照級焊縫檢驗,其他均按照級檢驗。Project Characteristics工程特點Some steel s
33、tructure building is very high with big span, need big hoist machine for installation with high risk and difficulty. Handling is 23.68meter high and HBWH is 21.705meter high.部分鋼結(jié)構(gòu)廠房建筑較高,且跨度較大,需采用大型吊裝機(jī)械施工,增加安裝難度;中轉(zhuǎn)車間是23.68米高,高架倉庫是21.705米高。Wall system use 200mm sandwich panel, has high quality require
34、ment.墻面大量采用200mm三明治板,對施工的質(zhì)量要求高。Tight schedule for steels structure with big quantity of steel structure. The target is complete roof of main buildings in October 2014.工期緊,任務(wù)重。需要在10月份完成鋼結(jié)構(gòu)封頂。Several work disciplines will be constructed at the same time. Plenty of coordination is required. 設(shè)多個工種作業(yè)也需要同
35、步進(jìn)行,需要大量的協(xié)調(diào)工作。Client has high requirement on safety. 業(yè)主對項目的安全標(biāo)準(zhǔn)要求高。Section 3 Construction Arrangement第三節(jié) 施工總體部署Project phases工程項目任務(wù)安排There are four phases for steel structure construction: fabrication of steel structure foundation installation of main steel structure fireproof paint按鋼結(jié)構(gòu)工程的先后順序分四個階段:
36、構(gòu)件制作階段基礎(chǔ)施工階段主體鋼結(jié)構(gòu)安裝階段防火涂料施工階段。The work of fireproof paint (performed by dedicated company) should be performed according to the construction progress of main steel structure and steel plate.防火涂料施工(專業(yè)公司負(fù)責(zé))隨主體結(jié)構(gòu)及板材施工進(jìn)度情況配合進(jìn)行。Principle原則要求As the construction area is limited and the working period of li
37、fting main steel is tight, as well as there is cross work between installation and civil work, we confirm the following principles:根據(jù)該鋼構(gòu)工程實際有效吊裝場地較窄,且實際要求主構(gòu)件吊裝工期緊及存在與土建交叉施工的特點,為此確定如下原則:We are planning to use a truck crane for the buildings to transport and lift the steel structure, with assistance o
38、f manual lifting. After the steel member is on its location, lift it with mobile crane. In order to improve the lifting efficiency, while storing the columns, try to locate the tie point of column, the center of column base and the center of foundation in one arc. 對于鋼結(jié)構(gòu)安裝時擬用一臺汽吊,隨吊隨運(yùn),人工抬升為輔,構(gòu)件就位后采用單
39、機(jī)旋轉(zhuǎn)法吊裝,為提高吊裝效率,在堆放柱時,盡量使柱的綁扎點、柱腳中心與基礎(chǔ)中心三點共圓弧。For the light member such as steel ladder, handrail and parts, it is difficult to lift them. So they will be transported and lifted manually.對于鋼梯和欄桿,安裝時重量輕,和構(gòu)件零星,故無法采用吊機(jī)吊裝,只能人力運(yùn)輸和抬升為主。In principle, the steel structure should be lifted according to the rou
40、te of the crane. And at the same time, consider the construction of fireproof paint (performed by dedicated company). The work of fireproof paint and the installation of steel structure will be cross-performed. 鋼結(jié)構(gòu)吊裝原則上按吊機(jī)行進(jìn)路線的順序進(jìn)行,同時考慮防火涂料施工(專業(yè)公司負(fù)責(zé)),涂裝隨結(jié)構(gòu)安裝交叉進(jìn)行。Try to make use of the area and time
41、during different disciplines construction to create condition for earlier starting the construction. Try to avoid the peak of the construction and balance the cross construction of paint and installation. 充分利用平面、空間和時間組織交叉作業(yè),為極早插入其他專業(yè)施工創(chuàng)造條件,避免出現(xiàn)施工高峰期,做到均衡施工,做好涂裝與結(jié)構(gòu)交叉。Lifting of steel structural is on
42、ly allowed during day time. 現(xiàn)場只允許白天吊裝鋼結(jié)構(gòu)。The steel structure and parts should be delivered to the site according to schedule after fabrication to avoid the steel members from collecting too much.預(yù)制主次鋼結(jié)構(gòu)構(gòu)件及配件等,均在廠內(nèi)加工后按計劃運(yùn)至工地,避免構(gòu)件、板材供應(yīng)過于集中。Reasonably arrange the construction period according to approv
43、ed schedule.根據(jù)已經(jīng)批準(zhǔn)的施工進(jìn)度要求,合理安排工期。Section 4 Construction Organization第四節(jié) 施工組織部署Project Management Organization chart項目組織機(jī)構(gòu)See Lego Jaixing Project Organization chart 見項目組織機(jī)構(gòu)圖Manpower勞動力計劃表Package A area總包A 區(qū)項目職位人 數(shù)備 注施工員3技術(shù)負(fù)責(zé)人3質(zhì)量員2安全員4起重工10起重指揮10測量工8電 工2安裝工96電焊工5輔助工20總數(shù)163Package B area總包B 區(qū)項目職位人 數(shù)備
44、注施工員3技術(shù)負(fù)責(zé)人3質(zhì)量員2安全員3起重工9起重指揮9測量工8電 工2安裝工88電焊工5輔助工18總數(shù)151List of equipments and tools on site現(xiàn)場使用主要機(jī)具設(shè)備一覽表Package A area總包A 區(qū)序號設(shè)備名稱型號規(guī)格數(shù)量(臺)國別產(chǎn)地制造年份額定功率(kw)生產(chǎn)能力用于施工部位一、鋼結(jié)構(gòu)安裝機(jī)械27汽車吊16T3各種良好卸貨汽車吊25T3各種良好吊裝汽車吊50T4各種良好吊裝高空作業(yè)車10各種良好高空手拉葫蘆5T8各種良好校正手拉葫蘆2T8各種良好手拉葫蘆1T8各種良好電焊機(jī)AX5005上海良好現(xiàn)場焊接栓釘機(jī)WS7-3005武漢良好焊接栓釘扭矩
45、扳手DYM-500L14A20武漢良好高強(qiáng)度螺栓用氧氣乙炔ZYHC-1005上海良好現(xiàn)場切割切割機(jī)3板材切割電鉆12固定墻板拉鉚槍10收邊角向磨光機(jī)5焊縫拋光手槍鉆61012打孔沖擊電鉆3膨脹螺栓打孔滑輪1T(雙輪)5吊裝板和檁條滑輪2T(雙輪)5 吊裝板和檁條Package B area總包B 區(qū)序號設(shè)備名稱型號規(guī)格數(shù)量(臺)國別產(chǎn)地制造年份額定功率(kw)生產(chǎn)能力用于施工部位一、鋼結(jié)構(gòu)安裝機(jī)械27汽車吊16T3各種良好卸貨汽車吊25T3各種良好吊裝汽車吊75T3各種良好吊裝高空作業(yè)車R9各種良好高空手拉葫蘆5T6各種良好校正手拉葫蘆2T6各種良好手拉葫蘆1T6各種良好電焊機(jī)AX5005上海
46、良好現(xiàn)場焊接栓釘機(jī)WS7-3005武漢良好焊接栓釘扭矩扳手DYM-500L14A16武漢良好高強(qiáng)度螺栓用氧氣乙炔ZYHC-1005上海良好現(xiàn)場切割切割機(jī)3板材切割電鉆12固定墻板拉鉚槍10收邊角向磨光機(jī)5焊縫拋光手槍鉆61012打孔沖擊電鉆3膨脹螺栓打孔滑輪1T(雙輪)5吊裝板和檁條滑輪2T(雙輪)5 吊裝板和檁條List of equipments and tools in workshop車間使用主要機(jī)具設(shè)備一覽表序號設(shè)備名稱型號規(guī)格數(shù)量(臺)國別產(chǎn)地制造年份用于施工部位一、橋式起重機(jī)1060t3上海2007.10構(gòu)件加工門式橋吊20t2武漢2001.10平板運(yùn)輸車20t2武漢2001.1
47、0剪板機(jī)102020001上海2005.1割圓機(jī)GXZ-6002上海2003.5聯(lián)合沖剪機(jī)Q341黑龍江2007.1半自動切割機(jī)CG-1003上海2006半自動火焰切割機(jī)GG1-304武漢2006H型鋼校直機(jī)JZ-301無錫2007.7H型鋼組立機(jī)2濟(jì)南2005.6速控多頭切割機(jī)2武漢2005.6刨邊機(jī)Bg11201天津2006.8碳弧氣刨2武漢2006.1磁力鉆床322上海2005.3搖臂鉆床Z3050163沈陽2006.9電鉆LT-254大河2001.5普通車床C61405002沈陽2006.7埋弧自動焊MZ-1-1000A2大連2007.10CO2氣體保護(hù)焊機(jī)DYM-500L14A5武漢
48、2006.1交流焊機(jī)YD-630DSS15成都2003.8直流弧焊機(jī)AX-5005成都2003.8門型焊機(jī)MZG-210001上海2007.1超聲波探傷儀Boy-B2廣東2007.1端面銑1廣東2007.6拋丸機(jī)HP0816-82成都2007.6空壓機(jī)3L-8/102廣東2007.6Section 5 Construction Schedule and Control Measure 第五節(jié) 施工進(jìn)度計劃和工期控制措施Construction schedule施工進(jìn)度計劃 See Lego Jiaxing Project Master Programme見項目總進(jìn)度計劃Control meas
49、ure for schedule 工期控制措施We will take the following measures:主要做好以下幾大方面的措施:Build a perfect project team to control the schedule, quality and safety. Coordinate the construction with the client and supervision to ensure the schedule. 組建一個優(yōu)秀的項目班子,協(xié)調(diào)統(tǒng)一,對工程進(jìn)度、質(zhì)量、安全等進(jìn)行全面控制。與業(yè)主、監(jiān)理進(jìn)行協(xié)調(diào),密切配合,在組織上確保進(jìn)度的實現(xiàn)。Carry
50、 out the meeting system strictly. Hold the production meeting weekly to check the construction effect discussing in the last meeting for the schedule, quality and safety and to rectify the error. The managing personnel should communicate every day to deal with the problem during production. 嚴(yán)格實行例會制度
51、,每周開一次生產(chǎn)例會,主要為工程進(jìn)度、質(zhì)量、安全等內(nèi)容,檢查上一次例會以來的實際施工效果,糾正不足。管理員每日碰頭,及時協(xié)調(diào)生產(chǎn)中存在的問題。Make good coordination for the construction. The working teams should provide working space for each other, and should not blame from each other.抓好施工配合,各班組之間相互為對方提供工作面,杜絕推諉扯皮。For the main working procedure, organize many work tea
52、ms to work continuously.主要的工序,組織多個班組不間斷連續(xù)作業(yè)。Daily planning and follow-up to avoid Upper and lower cross-job action. (On different elevation).每日規(guī)劃和后續(xù)監(jiān)督,以避免上下交叉作業(yè)的行動。(在不同標(biāo)高作業(yè)時)。Section 6 Design Developing Plan for steel structure第六節(jié) 鋼結(jié)構(gòu)深化設(shè)計方案6.1. Detail design Staff 深化設(shè)計人員配置表:Detail深化Design Engineer設(shè)計
53、工程師5人Graphic Staff繪圖員8人Graphic Software繪圖軟件X-STEEL/CAD6.2、Detail design proposal 深化設(shè)計方案6.4、Detail design proposal 深化設(shè)計方案6.4.1.Detail design 深化設(shè)計:The drawing of this project should be made by X-STEEL development drawing software according to the basic drawing provided by the owner and the constructio
54、n specifications made the owner. The drawing should be the foundation of the factory, after approved by the designer and the owner.本工程之施工圖應(yīng)依據(jù)業(yè)主提供之基本設(shè)計圖及參照業(yè)主所定之各種施工規(guī)范采用X-STEEL深化圖軟件所繪制,該施工圖須經(jīng)設(shè)計/業(yè)主認(rèn)可后作為工廠制作之依據(jù)。 Detail design procedure 深化設(shè)計流程: Familiar with the drawing by detailed designer
55、s深化設(shè)計人員熟悉圖紙:First of all, the detailed designers should have a deep understanding about the drawing. Any questions about the drawing should be organized together and put forward to the builders and design units in written form. The next weekly meetings should discuss these questions. The builders an
56、d design units should sign on the final result. The steel structure detail working personage can continue their works after they have the sign.在拿到設(shè)計圖紙后,項目專職深化人員首先要對整套圖紙讀懂吃透。對圖紙表達(dá)不詳細(xì)或不明白的地方進(jìn)行歸納整理以書面的形式向建筑單位、設(shè)計進(jìn)行正式提交,在下一個設(shè)計周例會上進(jìn)行答疑再對答疑結(jié)果,建筑單位、設(shè)計進(jìn)行簽字確認(rèn)。鋼結(jié)構(gòu)深化人員在拿到正式的簽字確認(rèn)單后,方可進(jìn)行下一步工作。 Technical di
57、sclosure of the drawing by construction design institure施工設(shè)計單位進(jìn)行設(shè)計圖紙技術(shù)交底:Joint hearing of the steel structure and installation scheme should be made according to the requirement of the detail programs. Detail design processes include the techonical process of steel structure production, timing plan,
58、 production precision control plan, qulification inspection plan, key timings analysis and the general analysis involving detail design, etc.按照深化的程序要求對鋼結(jié)構(gòu)制作和安裝方案進(jìn)行會審。深化設(shè)計過程應(yīng)包含鋼結(jié)構(gòu)制作工藝流程、節(jié)段劃分方案、制作精度控制方案、質(zhì)量檢測方案、關(guān)鍵節(jié)點的計算分析以及與深化設(shè)計有關(guān)的整體分析等內(nèi)容。Before the detail design of the steel structure, joint hearing of
59、 the production and installation of the the steel strcture should be made according to the requirements of ISO9001.鋼結(jié)構(gòu)深化設(shè)計開始前,按ISO9001的程序文件的要求,對鋼結(jié)構(gòu)制作和安裝方案進(jìn)行會審。Detail design processes include the techonical process of steel structure production, timing plan, production precision control plan, qulific
60、ation inspection plan, etc.深化設(shè)計過程應(yīng)包含鋼結(jié)構(gòu)制作工藝流程、節(jié)段劃分方案、制作精度控制方案、質(zhì)量檢測方案等內(nèi)容, The thoughts of ploting in detail design深化設(shè)計出圖思路:According to the steel structure drawing, supplemental instrument and bidding document provided by the bidding units, the steel structure should be detailed. The laying of
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2024年敲墻作業(yè)施工安全合同
- 2024年脫硫脫硝設(shè)備投資申請報告書
- 2024-2030年版中國水霧化鐵粉行業(yè)需求趨勢發(fā)展規(guī)模分析報告
- 2024-2030年版中國兒童安全座椅市場產(chǎn)供銷需及投資可行性分析報告
- 2024-2030年版中國MVR蒸汽機(jī)械行業(yè)需求趨勢及發(fā)展策略分析報告
- 2024廚師雇傭合同樣本
- 2024-2030年新版中國電動工具用刷架項目可行性研究報告
- 2024年技術(shù)保密協(xié)議格式
- 2024-2030年太陽能發(fā)電技術(shù)公司技術(shù)改造及擴(kuò)產(chǎn)項目可行性研究報告
- 2024年定制不銹鋼門窗協(xié)議
- 全科醫(yī)生臨床常見病門急診病歷模板(范例)
- GH/T 1421-2023野生食用菌保育促繁技術(shù)規(guī)程塊菌(松露)
- 商業(yè)綜合體停車收費(fèi)管理詳細(xì)規(guī)定
- 健康管理專業(yè)職業(yè)生涯規(guī)劃書
- 《佛山市鋁灰渣處理處置環(huán)境管理指南》
- 滑膜炎的知識宣教
- 第23課《孟子三章富貴不能淫》課件(共22張)語文八年級上冊
- 合理用藥軟件系統(tǒng)建設(shè)方案
- Unit4Whatcanyoudo-PartBLetslearn(課件)人教PEP版英語五年級上冊
- 個人信息保護(hù)法教程全套教學(xué)課件
- 高級教師職稱面試講課答辯題目及答案
評論
0/150
提交評論