1、船舶制造中英文對照外文翻譯文獻(xiàn)船舶制造中英文對照外文翻譯文獻(xiàn)(文檔含英文原文和中文翻譯)Spatial scheduling for large assembly blocks inshipbuildingAbstract: This paper addresses the spatial scheduling problem (SPP) for large assembly blocks, which arises in a shipyard assembly shop. The spatial scheduling problem is to schedule a set of jobs,
2、 of which each requires its physical space in a restricted space. This problem is complicated because both the scheduling of assemblies with different due dates and earliest starting times and the spatial allocation of blocks with different sizes and loads must be considered simultaneously. This pro
3、blem under consideration aims to the minimization of both the makespan and the load balance and includes various real-world constraints, which includes the possible directional rotation of blocks, the existence of symmetric blocks, and the assignment of some blocks to designated workplaces or work t
4、eams. The problem is formulated as a mixed integer programming (MIP) model and solved by a commercially available solver. A two-stage heuristic algorithm has been developed to use dispatching priority rules and a diagonal fill space allocation method, which is a modification of bottom-left-fill spac
5、e allocation method. The comparison and computational results shows the proposed MIP model accommodates various constraints and the proposed heuristic algorithm solves the spatial scheduling船舶制造中英文對照外文翻譯文獻(xiàn)problems effectively and efficiently.Keywords: Large assembly block; Spatial scheduling; Load b
6、alancing; Makespan; ShipbuildingIntroductionShipbuilding is a complex production process characterized by heavy and large parts, various equipment, skilled professionals, prolonged lead time, and heterogeneous resource requirements. The shipbuilding process is divided into sub processes in the shipy
7、ard, including ship design, cutting and bending operations, block assembly, outfitting, painting, pre-erection and erection. The assembly blocks are called the minor assembly block, the sub assembly block, and the large assembly block according to their size and progresses in the course of assembly
8、processes. This paper focuses on the spatial scheduling problem of large assembly blocks in assembly shops. Fig. 1 shows a snapshot of large assembly blocks in a shipyard assembly shop.Recently, the researchers and practitioners at academia and shipbuilding industries recently got together at “Smart
9、 Production Technology Forum in Shipbuilding and Ocean Plant Industries to recognize that there are various spatial scheduling problems in every aspect of shipbuilding due to the limited space, facilities, equipment, labor and time. The SPPs occur in various working areas such as cutting and blast s
10、hops, assembly shops, outfitting shops, pre-erection yard, and dry docks. The SPP at different areas has different requirements and constraints to characterize the unique SPPs. In addition, the depletion of energy resources on land put more emphasis on the ocean development. The shipbuilding industr
11、ies face the transition of focus from the traditional shipbuilding to ocean plant manufacturing. Therefore, the diversity of assembly blocks, materials, facilities and operations in ship yards increases rapidly.There are some solution pr oviders such as Siemens? and Dassult Systems? to provide integ
12、rated software including product life management, enterprise resource planning system, simulation and etc. They indicated the needs of efficient algorithms to solve medium- to large-sized SPP problems in 20 min, so that the shop can quickly re-optimize the production plan upon the frequent and unexp
13、ected changes in shop floors with the ongoing operations on exiting blocks intact.There are many different applications which require efficient scheduling algorithms with various constraints and characteristics (Kim and Moon, 2003, Kim et al., 2013, Nguyen and Yun, 2014 and Yan et al., 2014). Howeve
14、r, the spatial scheduling problem which considers spatial layout and dynamic job scheduling has not been studied extensively. Until now, spatial scheduling has to be carried out by human schedulers only with their experiences and historical data. Even when human experts have much experience in spati
15、al scheduling, it takes a long time and intensive effort to produce a satisfactory schedule, due to the complexity of considering blocks geometric shapes, loads, required facilities, etc. In praicfe, spatial scheduling for more than a six-month period is beyond the human schedulers capacity. Moreove
16、r, the space in the working areas tends tobe the most critical resource in shipbuilding. Therefore, the effective management of spatial resources through automation of the spatial scheduling process is a critical issue in the improvement of productivity in shipbuilding plants.船舶制造中英文對照外文翻譯文獻(xiàn)A shipya
17、rd assembly shop is consisted of pinned workplaces, equipment, and overhang cranes. Due to the heavy weight of large assembly block, overhang cranes are used to access any areas over other objects without any hindrance in the assembly shop. The height of cranes can limit the height of blocks that ca
18、n be assembled in the shop. The shop can be considered as a two-dimensional space. The blocks are placed on precisely pinned workplaces.Once the block is allocated to a certain area in a workplace, it is desirable not to move the block again to different locations due to the size and weight of the l
19、arge assembly blocks. Therefore, it is important to allocate the workspace to each block carefully, so that the workspace in an assembly shop can be utilized in a most efficient way. In addition, since each block has its due date which is pre-determined at the stage of ship design, the tardiness of
20、a block assembly can lead to severe delay in the following operations. Therefore, in the spatial scheduling problem for large assembly blocks, the scheduling of assembly processes for blocks and the allocation of blocks to specific locations in workplaces must be considered at the same time. As the
21、terminology suggests, spatial scheduling pursues the optimal spatial layout and the dynamic schedule which can also satisfy traditional scheduling constraints simultaneously. In addition, there are many constraints or requirements which are serious concerns on shop floors and these complicate the SP
22、P . The constraints or requirements this study considered are explained here: Blocks can be put in either directions, horizontal or vertical. (2) Since the ship is symmetric around the centerline, there exist symmetric blocks. These symmetric blocks are required to be put next to each other on the s
23、ame workplace. (3) Some blocks are required to be put on a certain special area of the workplace, because the work teams on that area has special equipment or skills to achieve a certain level of quality or complete the necessary tasks. (4) Frequently, the production plan may not be implemented as p
24、lanned, so that frequent modifications in production plans are required to cope with the changes in the shop. At these modifications, it is required to produce a new modified production plan which does not remove or move the pre-existing blocks in the workplace to complete the ongoing operations. (5
25、) If possible at any time, the load balancing over the work teams, i.e., workplaces are desirable in order to keep all task assignments to work teams fair and uniform.Lee, Lee, and Choi (1996) studied a spatial scheduling that considers not only traditional scheduling constraints like resource capac
26、ity and due dates, but also dynamic spatial layout of the objects. They used two-dimensional arrangement algorithm developed by Lozano-Perez (1983) to determine the spatial layout of blocks in shipbuilding. Koh, Park, Choi, and Joo (1999) developed a block assembly scheduling system for a shipbuildi
27、ng company. They proposed a two-phase approach that includes a scheduling phase and a spatial layout phase. Koh, Eom, and Jang (2008) extended their precious works (Koh et al., 1999) by proposing the largest contact area policy to select a better allocation of blocks. Cho, Chung, Park, Park, and Kim
28、 (2001) proposed a spatial scheduling system for block painting process in shipbuilding, including block scheduling, four arrangement algorithms and block assignment algorithm. Park et al. (2002) extended Cho et al. (2001) utilizing strategy simulation in two consecutive operations of blasting and p
29、ainting. Shin, Kwon, and Ryu (2008) proposed a bottom-left-fill heuristic method for spatial planning of block assemblies and suggested a placement algorithm for blocks by differential evolution arrangement algorithm. Liu, Chua, and Wee (2011) proposed a simulation model which enabled multiple prior
30、ity rules to be compared. Zheng, Jiang, and Chen (2012) proposed a mathematical programming model for spatial scheduling and used several heuristic spatial scheduling strategies (grid searching and genetic algorithm). Zhang and Chen (2012) proposed another mathematical programming model and proposed
31、 the agglomeration algorithm.船舶制造中英文對照外文翻譯文獻(xiàn)This study presents a novel mixed integer programming (MIP) formulation to consider block rotations, symmetrical blocks, pre-existing blocks, load balancing and allocation of certain blocks to pre-determined workspace. The proposed MIP models were implemen
32、ted by commercially available software, LINGO? and problems of various sizes are tested. The computational results show that the MIP model is extremely difficult to solve as the size of problems grows. To efficiently solve the problem, a two-stage heuristic algorithm has been proposed.Section 2 desc
33、ribes spatial scheduling problems and assumptions which are used in this study. Section 3 presents a mixed integer programming formulation. In Section 4, a two-stage heuristic algorithm has been proposed, including block dispatching priority rules and a diagonal fill space allocation heuristic metho
34、d, which is modified from the bottom-left-fill space allocation method. Computational results are provided in Section 5. The conclusions are given in Section 6.Problem descriptionsThe ship design decides how to divide the ship into many smaller pieces. The metal sheets are cut, blast, bend and weld
35、to build small blocks. These small blocks are assembled to bigger assembly blocks. During this shipbuilding process, all blocks have their earliest starting times which are determined from the previous operational step and due dates which are required by the next operational step. At each step, the
36、blocks have their own shapes of various sizes and handling requirements. During the assembly, no block can overlap physically with others or overhang the boundary of workplace.The spatial scheduling problem can be defined as a problem to determine the optimal schedule of a given set of blocks and th
37、e layout of workplaces by designating the blocks workplace simultaneously. As the termimplies, spatial scheduling pursues the optimal dynamic spatial layout schedule which can also satisfy traditional scheduling constraints. Dynamic spatial layout schedule can be including the spatial allocation iss
38、ue, temporal allocation issue and resource allocation issue.An example of spatial scheduling is given in Fig. 2. There are 4 blocks to be allocated and scheduled in a rectangular workplace. Each block is shaded in different patterns. Fig. 2 shows the 6-day spatial schedule of four large blocks on a
39、given workplace. Blocks 1 and 2 are pre-existed or allocated at day 1. The earliest starting times of blocks 3 and 4 are days 2 and 4, respectively. The processing times of blocks 1,2 and 3 are 4, 2 and 4 days, respectively.The spatial schedule must satisfy the time and space constraints at the same
40、 time. There are many objectives in spatial scheduling, including the minimization of makespan, the minimum tardiness, the maximum utilization of spatial and non-spatial resources and etc. The objective in this study is to minimize the makespan and balance the workload over the workspaces.There are
41、many constraints for spatial scheduling problems in shipbuilding, depending on the types of ships built, the operational strategies of the shop, organizational restrictions and etc. Some basic constraints are given as follows; (1) all blocks must be allocated on given workplaces for assembly process
42、es and must not overstep the boundary of the workplace; (2) any block cannot overlap with other blocks; (3) all blocks have their own earliest starting time and due dates; (4) symmetrical blocks needs to be placed side-by-side in the same workspace. Fig. 3 shows how symmetrical blocks need to be ass
43、igned; (5) some blocks need to be placed in the designated workspace; (6) there can be existing blocks before the planning horizon; (7) workloads for船舶制造中英文對照外文翻譯文獻(xiàn)workplaces needs to be balanced as much as possible.In addition to the constraints described above, the following assumptions are made.T
44、he shape of blocks and workplaces is rectangular.(2 )Once a block is placed in a workplace, it cannot be moved or removed from its location until the process is completed.(3 ) Blocks can be rotated at angles of 0 and 90 (see Fig. 4).The symmetric blocks have the same sizes, are rotated at the same a
45、ngle and should be placed side-by-side on the same workplace.The non-spatial resources (such as personnel or equipment) are adequate.A mixed integer programming modelA MIP model is formulated and given in this section. The objective function is to minimize makespan and the sum of deviation from aver
46、age workload per workplace, considering the block rotation, the symmetrical blocks, pre-existing blocks, load balancing and the allocation of certain blocks to pre-determined workspace.A workspace with the length LENW and the width WIDW is considered two-dimensional rectangular space. Since the rect
47、angular shapes for the blocks have been assumed, a block can be placed on workspace by determining (x, y) coordinates, where 0 ? x ? LENW and 0 ? y ? WIDW. Hence, the dynamic layout of blocks on workplaces is similar to two-dimensional bin packing problem. In addition to the block allocation, the op
48、timal schedule needs to be considered at the same time in spatial scheduling problems. Z axis is introduced to describe the time dimension. Then, spatial scheduling problem becomes a three-dimensional bin packing problem with various objectives and constraints.The decision variables of spatial sched
49、uling problem are (x, y, z) coordinates of all blocks within a three-dimensional space whose sizes are LENW, WIDW and T in x, y and z axes, where T represents the planning horizon. This space is illustrated in Fig. 5.In Fig. 6, the spatial scheduling of two blocks into a workplace is illustrated as
50、an example. The parameters pl and p2 indicate the processing times for Blocks 1 and 2, respectively. As shown in z axis, Block 2 is scheduled after Block 1 is completed.A two-stage heuristic algorithmThe computational experiments for the MIP model in Section 3 have been conducted using a commerciall
51、y available solver, LINGO?. Obtaining global optimum solutions is very time consuming, considering the number of variables and constraints. A ship is consisted of more than 8 hundred large blocks and the size of problem using MIP model is beyond today s computational abilitytagewoeuristic algorithm
52、has been proposed using the dispatching priority rules and a diagonal fill method.Stage 1: Load balancing and sequencingPast research on spatial scheduling problems considers various priority rules. Lee et al. (1996) used a priority船舶制造中英文對照外文翻譯文獻(xiàn)rule for the minimum slack time of blocks. Cho et al.
53、 (2001) and Park et al. (2002) used the earliest due date. Shin et al. (2008) considered three dispatching priority rules for start date, finish date and geometric characteristics (length, breadth, and area) of blocks. Liu and Teng (1999) compared 9 different dispatching priority rules including fir
54、st-come first-serve, shortest processing time, least slack, earliest due date, critical ratio, most waiting time multiplied by tonnage, minimal area residue, and random job selection. Zheng et al. (2012) used a dispatching rule of longest processing time and earliest start time.Two priority rules ar
55、e used in this study to divide all blocks into groups for load balancing and to sequence them considering the due date and earliest starting time. Two priority rules are streamlined to load-balance and sequence the blocks into an algorithm which is illustrated in Fig. 7. The first step of the algori
56、thm in this stage is to group the blocks based on the urgency priority. The urgency priority is calculated by subtracting the earliest starting time and the processing time from the due date for each block. The smaller the urgency priority, the more urgent the block needs to bed scheduled. Then all
57、blocks are grouped into an appropriate number of groups for a reasonable number of levels in urgency priorities. Let g be this discretionary number of groups. There are g groups of blocks based on the urgency of blocks. The number of blocks in each group does not need to be identical.Blocks in each
58、group are re-ordered grouped into as many subgroups as workplaces, considering the workload of blocks such as the weight or welding length. The blocks in each subgroup have the similar urgency and workloads. Then, these blocks in each subgroup are ordered in an ascending order of the earliest starti
59、ng time. This ordering will be used to block allocations in sequence. The subgroup corresponds to the workplace.If block i must be processed at workplace w and is currently allocated to other workplace or subgroup than w, block i is swapped with a block at the same position of block i in an ascendin
60、g order of the earliest starting time at its workplace (or subgroup). Since the symmetric blocks must be located on a same workplace, a similar swapping method can be used. One of symmetric blocks which are allocated into different workplace (or subgroups) needs to be selected first. In this study,
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- DB12T 578-2015 液化氣體汽車罐車用緊急切斷閥檢驗方法與評定要求
- 新學(xué)期學(xué)習(xí)計劃范文匯編6篇
- 智能運(yùn)輸系統(tǒng) 體系結(jié)構(gòu) 服務(wù) 編制說明
- 全國連鎖洗衣店分布簡報 2024 -洗衣行業(yè)如何搶占商機(jī) 來看這份連鎖洗衣店選址布局
- 春節(jié)期間通信保障方案
- 雪房子課件教學(xué)課件
- 部編版歷史九年級上冊第六單元 第17課《君主立憲制的英國》說課稿
- 高壓電工作業(yè)題庫
- 寶安區(qū)重點(diǎn)中學(xué)七年級上學(xué)期語文期中考試試卷
- 購銷合同協(xié)議書范本(2篇)
- 犟龜-完整版獲獎?wù)n件
- 工業(yè)產(chǎn)品CAD技能三級試題及其評分標(biāo)準(zhǔn)
- 多元統(tǒng)計分析習(xí)題及解答
- 漢語詞性專題練習(xí)(附答案)
- 勞動合同-高管補(bǔ)充協(xié)議20110520
- 浙江省溫州市地圖矢量PPT模板(圖文)
- 上海市建設(shè)工程項目管理機(jī)構(gòu)管理人員情況表
- 北師大版二年級數(shù)學(xué)上冊第九單元《除法》知識點(diǎn)梳理復(fù)習(xí)ppt
- 空氣能室外機(jī)保養(yǎng)維護(hù)記錄表
- DB37∕T 5162-2020 裝配式混凝土結(jié)構(gòu)鋼筋套筒灌漿連接應(yīng)用技術(shù)規(guī)程
- 9-2 《第三方過程評估淋蓄水檢查內(nèi)容》(指引)
評論
0/150
提交評論