版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、文件種類S Drafted Checked Reviewed Approved Modification-BCHENGGANG NUCLEARPLANT PHASE I (21000MW)DOC文件種類S Drafted Checked Reviewed Approved Modification-BCHENGGANG NUCLEARPLANT PHASE I (21000MW)DOCLNC-220V ACMANUAL CHAPTER 5 OPERATING Project文件類Sub-ItemEngineering SBA:LNC-220V AC B: C:工國(guó)家甲級(jí) 工咨甲中廣核工程設(shè)Na
2、tionalAgradeengineeringCertificationNO:CHINA ERDESIGNNationalAgradeengineeringCertificationNO:編ernalCP0905-DE-GN-is the property of CNPDC It must not be used、reproduced、transmitted or disclosed without the prior written permis of CNPDC 本文件之 屬于中廣核工程設(shè)計(jì) 。未獲本公司 ,任何人不得擅自使用、 、傳遞或 該文件。B版版日狀編Drafted校Checked
3、審Reviewed批Approved修改說(shuō)Modification-AB版版日狀編Drafted校Checked審Reviewed批Approved修改說(shuō)Modification-AB版CHENGGANGPLANTPHASEIB版CHENGGANGPLANTPHASEILNC-220V ERSYSTEMMANUALCHAPTER5 OPERATING PARAMETERSCHINA ERDESIGNBB文件修版日章頁(yè)修改范圍及依AB2010-2011-8-LNC-220V AC ER SUPPLY SYSTEM LNC-220V AC ER SUPPLY SYSTEM MANUAL CHAPT
4、ER 5 Rev5OPERATINGNORMALPARTICULARSTEADY STARTUPANDNORMALOTHERCONTROLLNC-220V AC ER SUPPLY SYSTEM 5B5OPERATINGLNC-220V AC ER SUPPLY SYSTEM 5B5OPERATING5.1Normal5.2Particularsteady5.3Particulartransient5.3.1LossofACchargerinputheautomaticmode,chargeroperationisasAfter loss of ACer forriod of time les
5、snaswitchsetting(3-6-12min.), the charger is automatically restored to the pre-transient operating mode i.e. float or recharge/equalize. The switch is mountedhe charger enclosure (switch set to 6 Operationwith faultemergency 380V er er id to the inverter from the charged battery withouterruptionfor
6、one hour.Operation faulty In case of loss the 110V DC voltage or anernaldefectoftheinverter,ifthebypass er is present and notolerance, theer supply is automatically providedthrough a transformowered form the sic switch circuit with 140ms delay. In case of loss the 380V AC voltage and inverter failur
7、e, the sicswitchdoesnt need change over.Inverter In case of loss the inverter not available or during maenance, theer supply is manuallyswitchedovertothe380VACswitchboardthoughamanualbypassswitch.Under normal operation, the charger fed from the emergency-d 380V AC switchboard, provides the inverter
8、and floats the battery or recharges it as neThe charger starts automatic with charger mode. The charger is operatedhe float mode and voltage is maained constanfloat voltage setting. Following, theowersthedistributionunit.Thisis shownattheDisplayOperationUnit.inverterisoperatedLNC-220V AC 5B5.4Startu
9、pandnormalUPS-systemsLNC-220V AC 5B5.4StartupandnormalUPS-systemsarestart-upfortheplanoperationandshutdownwhiletheplanisnot ForparticularoperationsoftheUPS-systems,seechapterAfter loss of ACer forriod of lime greatern the switch setting, the charger resumes operationherecharge/equalizemodeforadurati
10、ondeterminedby atimer(alsomountedinchargerenclosure) adjustablefrom0to60hours(timersetto 15 hours). The charger then switches to float service.ChargerShortcircuit erformanceandcharacteristicsarenot affectedbyashort Selective tripis provided by time-delayed magnetic releasehebattery ing breaker.Charg
11、erovercurrentprotectioncircuitryactuatesafterabout10ms. Short-circuit on the The batterying fuse trips. Short-circuitonACsideofchargerThechargerAC(380V)busbreakerisCharger TheACbusbreakers(101JA)arcautomaticallyopened.Thechargerswitchesoff Suddenvariationsorlossof110Vvoltagefor inverterDuring sodden
12、 variations inthe invertower supply voltage (from 96.3V to 121V), the instantaneous variationheswitchboardvoltagedoesnotexceed15%of 220V Should the voltage drelow 96.3V DC or rise above 121V DC the inverter will trip and a transfer to the standby supply will be initiated.Load variations on theinverterFor instantaneous variations of load rise from 0 to 100%, and return to 0, the
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025版商業(yè)建筑外墻改造與拆除一體化服務(wù)合同3篇
- 2025版土地承包經(jīng)營(yíng)權(quán)轉(zhuǎn)包合同(含農(nóng)業(yè)保險(xiǎn))2篇
- 二零二五版物流運(yùn)輸保證合同印花稅繳納規(guī)定2篇
- 2025年度木材產(chǎn)業(yè)鏈上下游合作發(fā)展合同4篇
- 2025年寬帶網(wǎng)絡(luò)安全協(xié)約
- 2025年壓瘡預(yù)防護(hù)理服務(wù)合同
- 2025年委托招標(biāo)合同
- 2025年卵巢囊腫手術(shù)協(xié)議
- 2025年度木材加工行業(yè)安全監(jiān)管合作協(xié)議3篇
- 2025年加盟運(yùn)營(yíng)推廣合作協(xié)議
- 眼的解剖結(jié)構(gòu)與生理功能課件
- 小學(xué)網(wǎng)管的工作總結(jié)
- 2024年銀行考試-興業(yè)銀行筆試參考題庫(kù)含答案
- 泵站運(yùn)行管理現(xiàn)狀改善措施
- 2024屆武漢市部分學(xué)校中考一模數(shù)學(xué)試題含解析
- SYT 0447-2014《 埋地鋼制管道環(huán)氧煤瀝青防腐層技術(shù)標(biāo)準(zhǔn)》
- 浙教版七年級(jí)下冊(cè)科學(xué)全冊(cè)課件
- 弧度制及弧度制與角度制的換算
- 瓦楞紙箱計(jì)算公式測(cè)量方法
- DB32-T 4004-2021水質(zhì) 17種全氟化合物的測(cè)定 高效液相色譜串聯(lián)質(zhì)譜法-(高清現(xiàn)行)
- DB15T 2724-2022 羊糞污收集處理技術(shù)規(guī)范
評(píng)論
0/150
提交評(píng)論