西服m72feb這次feedback主要是一些問題答案不好記也不全自己看_第1頁
西服m72feb這次feedback主要是一些問題答案不好記也不全自己看_第2頁
西服m72feb這次feedback主要是一些問題答案不好記也不全自己看_第3頁
全文預(yù)覽已結(jié)束

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)

文檔簡介

這次feedback主要是一些問題,答案不好記。問題也不全,自己看看知識點

Incontinuitytest,whichofthefollowingiscorrect?

a.valuelesstotestinparallel

b.breakdownaslittleaspossibleatplugandteminal

c.checkfromequipmenttocircuitbreaker

computingweightandbalance

averagearmwithincg

averagearmiszero

magnifyingglass:

5-20times

2-10times

alchoice

chemicalagentscausehumanwithoutsurfaceevent

fl ble,reactive

toxic,corrosive

toxic,reactive

preparingandcuttingcoaxial

must1inch

must1/16inchdifferentfromnormalsize

mustnotfileatendofinnerconductor

x-rayradiographic:

contrastisthesameasdefinition

filmcontrastisthesameasfilmdensity

definitionissharpnessoflines

thebiggest drillsizeis

E

5/16inch

20onthenumber

if testvalueexceedstherangeofvoltmeter.itmaybeconnecting

themultiplier

theshunt

reducedvoltmetersupply

managementsystemforprogrammingandcoordinatingmaintenanceeffortandimprovementis

QA

QC

QCandsurveillance

11edsystemswayinthesimilartohelptroubleshootingfurtherdamagewilloccurif

a.thecomponentisgood

b.thecomponentisbadandahiddencauseispresent

c.thecauseismultiplier

theamountofbowis

a.measuredbyaspecialgaugewithoutcalculate

b.bydecimalsuchas0.002

c.structure

ifthespliceoffuelis40feetsquare.youmust

moppedup

drainit

callforfirefighter

Ax-raytubeissealedandmadeof

lead

deflected uranium

glass

diameterinrivetsymbolis

SW

SE.

NE @

whentowing,whichisminimumacceptablecondition

onetireisbrokenoneachaxes

onetireisbrokenoneachtrunk

whenparking

tox-rayastructurepartsforfatiguecracks19.constructionofpenetrameter

wireonly

forcrimtoolswithreceablecontactlocator

varydepthwithdifferentlocator

locatorisalwaysinstalledbyaratchetandretaining

directlyaffectiononwireis

aging

fuelmoisture22.maintenancenis

atasklist

b.amaintenanceprocess

maintenanceinterval

23hardsolderingisusedona.oxygenline

tubularconnection

electricalline

24.whicharenotpublishedbythemanufacture.

theeffectofHIRFis

theactionofdeflectioncoil,whenthecontrolopenedinthebondingtest?

fulldeflection

noeffectonthelastdeflection

inzeropoint

thecautionofusinggrindingwheel

whenusingAVOmeter

connectanodetored

connectanodetoblack

incoldweather,theafterflightchecklistinclude

engineexhaustice

capandblankpinandsocket

both

30whenparkingperiodisfrom30daysto60days,whichactionisappropriate?

thewaytotreatfl bleinaemergency

cutoffallelectricpowersourcethatmaycausespark

applyfirebottlec.

thefireonenginegeneratorduetoshortcircuit,mustusewhichfirebottle

B,CO2

C,foam

D,drypowder

hard–settingpointingshould notbeused:34whatisthelabelfortoxicmaterial

orderoftolerancegrades

sha,drilling,milling

forLRUs,hotandground

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
  • 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論