GB 50984-2014 GB50984-2014石油化工工廠布置設(shè)計規(guī)范:英文_第1頁
GB 50984-2014 GB50984-2014石油化工工廠布置設(shè)計規(guī)范:英文_第2頁
GB 50984-2014 GB50984-2014石油化工工廠布置設(shè)計規(guī)范:英文_第3頁
GB 50984-2014 GB50984-2014石油化工工廠布置設(shè)計規(guī)范:英文_第4頁
GB 50984-2014 GB50984-2014石油化工工廠布置設(shè)計規(guī)范:英文_第5頁
已閱讀5頁,還剩59頁未讀, 繼續(xù)免費閱讀

付費閱讀全文

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)

文檔簡介

專用

人人文庫

NATIONALSTANDARD

OFTHEPEOPLESREPUBLICOFCHINA

CodeforDesignofPetrochemicalPlantLayout

GB50984-2014

ChiefDevelopmentDepartment:ChinaPetrochemicalCorporation

ApprovalDepartment:MinistryofHousingandUrbanRuralDevelopment

-

ofthePeoplesRepublicofChina

ImplementationDate:December1,2014

專用

人人文庫

ChinaPlanningPress

Beijing2019

ChineseeditionfirstpublishedinthePeoplesRepublicofChinain2014

EnglisheditionfirstpublishedinthePeoplesRepublicofChinain2019

byChinaPlanningPress

rd

,,專用

3FloorCTowerGuohongBuilding

No.A11,Muxidi-Beili,XichengDistrict

Beijing,100038

PrintedinChinabyBeijingJingyintangGraphicPrintingCenter

?2014byMinistryofHousingandUrban-RuralDevelopmentof

thePeoplesRepublicofChina

Allrightsreserved.Nopartofthispublicationmaybereproducedortransmittedinanyformor

byanymeans人人文庫,graphic,electronic,ormechanical,includingphotocopying,recording,

oranyinformationstorageandretrievalsystems,withoutwrittenpermissionofthepublisher.

Thisbookissoldsubjecttotheconditionthatitshallnot,bywayoftradeorotherwise,belent,

resold,hiredoutorotherwisecirculatedwithoutthepublisherspriorconsentinanyformof

blindingorcoverotherthanthatinwhichthisispublishedandwithoutasimilarcondition

includingthisconditionbeingimposedonthesubsequentpurchaser.

ISBN978-7-5182-1088-6

中華人民共和國住房和城鄉(xiāng)建設(shè)部公告

2018年第185號

住房城鄉(xiāng)建設(shè)部關(guān)于發(fā)布《石油化工工程防滲技術(shù)規(guī)范》

等7項工程建設(shè)標(biāo)準(zhǔn)英文版的公告

現(xiàn)批準(zhǔn)《石油化工工程防滲技術(shù)規(guī)范》(GB/T50934—2013)、《石油化工安全儀表系統(tǒng)設(shè)

計規(guī)范》(GB/T50770—2013)、《石油化工鋼制低溫儲罐技術(shù)規(guī)范》(GB/T50938—2013)、《石

油化工裝置設(shè)計文件編制標(biāo)準(zhǔn)》(GB/T50933—2013)、《石油化工工廠布置設(shè)計規(guī)范》(GB

50984—2014)、《石油化工用機泵工程設(shè)計規(guī)范》(GB/T51007—2014專用)、《石油化工建(構(gòu))筑物

荷載規(guī)范》(GB51006—2014)英文版。工程建設(shè)標(biāo)準(zhǔn)英文版與中文版出現(xiàn)異議時,以中文版

為準(zhǔn)。

該7項工程建設(shè)標(biāo)準(zhǔn)英文版由住房城鄉(xiāng)建設(shè)部組織中國計劃出版社出版發(fā)行。

中華人民共和國住房和城鄉(xiāng)建設(shè)部

年月日

201894

人人文庫

AnnouncementofMinistryofHousingandUrban-Rural

DevelopmentofthePeoplesRepublicofChina

No.363

AnnouncementoftheMinistryofHousingandUrbanRuralDevelopmentofthe

-

PeoplesRepublicofChinaonPublishingtheNationalStandardCodefor

DesignofPetrochemicalPlantLayout

CodeforDesignofPetrochemicalPlantLayouthasbeenapprovedasanationalstandardwitha

serialnumberofGB50984-2014,andwillbeimplementedonDecember1,2014.InthisCode,Articles

3.2.16(1,2,3,4,5)and5.2.9aremandatoryonesandmustbeimplementedstrictly.

AuthorizedbytheResearchInstituteofStandardsandNorms,MinistryofhousingandUrban

-

RuralDevelopmentofP.R.China,thisCodeispublishedanddistributed專用byChinaPlanningPress.

MinistryofHousingandUrbanRuralDevelopmentofthePeoplesRepublicofChina

-

March31,2014

人人文庫

Foreword

ThisCodeisdevelopedbySinopecEngineeringIncorporationincooperationwithotherinvolved

organizationsaccordingtotherequirementsofDocument(JIANBIAO〔2008〕No.105)issuedbythe

MinistryofHousingandUrbanRuralDevelopment(MOHURD)NoticeonPrintingandDistributing

--

"theDevelopmentandRevisionPlanofNationalEngineeringConstructionStandards(2ndGroup)in

2008".

InpreparingthisCode,thedevelopmentteamhascarriedoutextensiveinvestigations,summarized

theengineeringpractices,madereferencetotheadvancedcodesandstandardsinChinaandabroad,

requestedandconsolidatedcommentsfromrelevantorganizations,discussedandstudiedthemain

issues,andthenfinalizedthisCodeafterreviewing.

ThisCodeconsistsof9chaptersand3appendixes,coveringgeneralprovisions,terms,plantsite

selectionandgeneralplanning,generallayout,interblockcorridorarrangement,gradingplan,roads,

-

railwayandgreening.

Theprovisionsprintedinboldtypearemandatoryonesandmustbeimplementedstrictly.

Thisstandardisunderthejurisdictionof,anditsmandatoryprovisions專用areinterpretedbythe

MinistryofHousingandUrbanRuralDevelopmentofthePeoplesRepublicofChina.China

-

PetrochemicalCorporation(SinopecGroup)isresponsibleforitsroutinemanagement.Sinopec

EngineeringIncorporationisinchargeoftheexplanationoftechnicalspecifications.During

implementationofthisCode,anycommentsandadvicescanbepostedorpassedontoSinopec

EngineeringIncorporation(Address:Bldg.21Anyuan,AnhuiBeiLi,ChaoyangDistrict,Beijing,

Postcode:100101)asareferenceforrevisingthisCodeinthefuture.

Chiefdevelopmentorganizations,participatingdevelopmentorganizations,chiefdraftingstaffand

chiefreviewingstaffoftheCode:

:

ChiefDevelopmentOrganizations

SinopecEngineeringIncorporation

SinopecLuoyangPetrochemicalEngineeringCorporation

:

ParticipatingDevelopmentOrganizations

SinopecNingboEngineeringCo.,Ltd.

人人文庫SinopecNanjingEngineeringCo.,Ltd.

SinopecShanghaiEngineeringCo.,Ltd.

ChinaPetroleumPlanningandEngineeringInstitute

BeijingYanshanYulongPetrochemicalEngineeringCompanyLtd.

SinopecZhenhaiRefineryandPetrochemicalCompany

:

ChiefDraftingStaff

MaGengyuTaoJibinDongJijunYouBinYuQijieHanJun

ChenWeiyeZhengMingzhuYueChenjianYuSongxiangChenJi

DongGuangxiZhangShoubinYeHongyuePanHui

·1·

:

ChiefReviewingStaff

AnDingyuWangXiuyunLiPingCaiWeiWangRuoqingHeLonghui

ZhangXiaopingJiHongjinWenKewuLiangXinminLiChunyan

專用

人人文庫

·2·

Contents

1GeneralProvisions……………(1)

2Terms…………………………(2)

3PlantSiteSelectionandGeneralPlanning……………………(4)

3.1GeneralRequirements……………(4)

3.2PlantSiteSelection……………(4)

3.3GeneralPlanning………………(6)

3.4ExternalTransportation…………(7)

3.5AreaSafety……………………(8)

4GeneralLayout…………………(10)

4.1GeneralRequirements……………(10)

4.2PlantLayout……………………(10)

4.3ProcessPlantLayout……………(13)

4.4TankFarmLayout………………(14)

4.5UtilityandAuxiliaryFacilityLayout………………專用(16)

4.6WarehouseandTransportationFacilityLayout……………………(19)

4.7FlareSystemLayout……………(20)

4.8AdministrativeFacilityLayout……………………(22)

4.9FenceandGateLayout…………(24)

5InterblockCorridorArrangement……………(26)

-

5.1GeneralRequirements…………(26)

5.2ComprehensivePlan……………(27)

5.3UndergroundPipelines…………(28)

5.4AbovegroundPipelinesandTrestles………………(29)

6GradingPlan……………………(32)

6.1GeneralRequirements…………(32)

6.2GradingPlanStyles……………(32)

6.3StormWaterDrainage…………(33)

6.4Earthwork……………………人人文庫(34)

6.5GradingPlanwithinUnits………………………(35)

7Roads……………(38)

7.1GeneralRequirements…………(38)

7.2RoadRoutes……………………(38)

7.3RoadCrossing…………………(41)

8Railway…………………………(42)

8.1GeneralRequirements…………(42)

8.2RailwayRoutes…………………(42)

8.3AuxiliaryFacilities………………(44)

·1·

9Greening………………………(45)

9.1GeneralRequirements…………(45)

9.2ProcessPlantArea………………(45)

9.3TankFarmandLoading/unloadingBay……………(45)

9.4UtilityandAuxiliaryFacilityArea…………………(46)

9.5AdministrativeArea……………(47)

9.6RoadandRailway………………(47)

9.7DistancebetweenTreesandRelevantFacilities……………………(47)

AppendixASoilLooseCoefficientandCompressionCoefficient………………(50)

AppendixBProjectEarthworkControlIndicators………………(51)

AppendixCCalculationofGreeningCoverageCoefficient……(52)

ExplanationofWordinginThisCode……………(53)

ListofQuotedStandards…………(54)

專用

人人文庫

·2·

1GeneralProvisions

ThisCodeispreparedwithaviewtoadaptingthepetrochemicalplantlayoutdesigntothe

1.0.1

uniquefeaturesofpetrochemicalindustry,suchasthelongindustrialchains,largescalesandflammable

andexplosivechemicalsinvolved,soastosatisfytherequirementsoftechnicaladvancement,

appropriatelayout,safety,environmentalprotection,health,andenergyconservation,andtogainbenefit

forsociety,economy,andenvironment.

ThisCodeisapplicableforthelayoutdesignfortheprojectsofnewconstruction,expansionand

1.0.2

revampinoilrefiningandpetrochemicalindustry.

InadditiontotherequirementsstipulatedinthisCode,thosestipulatedinthecurrentrelevant

1.0.3

nationalstandardsshallalsobecompliedwithinthepetrochemicalplantlayoutdesign.

專用

人人文庫

·1·

2Terms

Petrochemicalplant

2.0.1

Refinery,petrochemicalcomplex,petrochemicalfiberplant,etc.,ortheirintegratedcomplexwhere

petroleum,naturalgas,coalderivedsyngasandtheirproductsareusedasfeedstockstoproduce,store

-

andtransportvariouspetrochemicalproducts.

Plantsiteselection

2.0.2

Properlyselectanareaorasiteforplantconstruction.

Generalplanning

2.0.3

Tomakeanintegratedplanningtoestablishappropriatelocationalrelationshipsamongmultiple

projectsofthesiteaswellascollaborationprojectsofthesite,andtomakeproperrouteplanningfor

materialtransportation,basedonthenaturalandsocialconditions,urbandevelopmentplanning,andthe

requirementsofenvironmentalprotectionandproductionsafety,forthepurposetoimprovethe

integrateperformanceofthewholeproject.

Plantlayout

2.0.4

Todeterminetherelativerelationsandthespatiallocationsbetween專用theplantprocessunitsand

variousfacilitiesbasedonthegeneralplanning.

Plantarea

2.0.5

Theareacomprisingprocessunitsandvariousfacilitiesintheplant.

Productionarea

2.0.6

Theareacomprisingprocessarea,tankfarmandloading/unloadingareaandrelevantfacilities.

Utilityfacilities

2.0.7

Ageneraltermthatisusedtorefertothefacilitiesprovidingwater,powerandsteamforthe

process.

Auxiliaryfacilities

2.0.8

Thetypeoffacilitythatisotherthanproductionandutilityfacilitiesbutnecessarytosupportthe

processoperation.

Tankfarm

2.0.9

Anareathatcomprisesseveralgroupedstoragetanks,includingtheassociatedpumparea,power

supplysystemand人人文庫firefacilities.

Warehouse

2.0.10

Thebuildings(structures)andlaydownareasusedtostorebulkfeedstocks,products,semi

-

productsandspareparts.

Transportationfacility

2.0.11

Dedicatedrailway,roads,terminals,trestles,andrelevantfacilities,andloading/unloading

machinesandtoolsprovidedforspecificloading/unloadingoperationsandtransportationactivities.

Administrativefacility

2.0.12

Thefacilityprovidedforplantwideadministrationandproductioncontrol.

-

Processequipmentarea

2.0.13

·2·

Theareaintheprocessunitwhereequipmentandpipingaregroupedforprocessoperations.

Block

2.0.14

Anindependentareathatisdividedbytheroadsandintendedforperformingspecificfunctions.

Interblockcorridor

2.0.15-

Astripzonelocatedbetweenbatterylimitsorbetweenbatterylimitandfence,whichisusedto

constructroads,railway,abovegroundpiperacks,undergroundpipelines,beltconveyerandisintended

-

forlandscapingpurpose.

Pipelines

2.0.16

Ageneraltermforpipingfabricatedbyvariousmaterials,powercables,telecomcablesandoptical

fibercables.

Pipelinescoordination

2.0.17

Anactivitytoproperlyplanandarrangevariouspipelinesintheinterblockcorridorinaccordance

-

withrelevantspecifications.

Interconnectingpipelines

2.0.18

Theabovegroundpipings,undergroundpipingsandcablesthatarelocatedbetweentheplantareas

inoneindustrialparkorbetweentheplantareaandoutsidefencefacilities,andusedtoconveythe

feedstocks,products,steam,etc.

Plantroadforrawmaterialsandproductshandling

2.0.19

Theroadinsidetheplantthatisconstructedforthemotorvehicles專用tohandlebulkrawmaterialsor

products.

Gradingplan

2.0.20

Plantoreformthenaturalterrainofthesite,andassignelevationsandslopesfortheconstruction

site.

Gradingplanwithslightslope

2.0.21

Reformingtheconstructionsiteintooneorseveralplanargroundswithcontinuousgradientand

slopedirection,theplanargroundsaregentlyconnectedwithoutsignificantheightchange.

Gradingplanwithterrace

2.0.22

Reformingtheconstructionsiteintotwoormoreterracesindifferentelevations,twoadjacent

terraceshaveanelevationdifference,andarejoinedbyslopeorretainingwall.

Designwaterlevel

2.0.23-

Themaximumwaterlevelusedindesign,whichiscalculatedinaccordancewithfloodprevention

standard.

Calculatedwaterlevel

2.0.24人人文庫-

Thedesignwaterlevelpluswaterburstheightandwaveheight.

-

Occupiedbuilding

2.0.25

Abuildinghousingpersonswhoareregularlyassignedthereandperformthemajorityoftheirjob

functionwithinthebuilding,andoneworkingdaymorethan40personnelhour.

-

Potentialexplosionsource

2.0.26

Theequipment/facilityinacongestionprocessdomainpotentialreleaseflammablematerialmay

risetovaporcloudexplosion(VCE).

Potentialtoxicsource

2.0.27

Theequipment/facilitythatispotentialsourceofreleasingtoxicmaterials.

·3·

3PlantSiteSelectionandGeneralPlanning

3.1GeneralRequirements

Plantsiteselectionshallmeettherequirementsofnationaleconomicdevelopmentandoverall

3.1.1

planningofpetrochemicalindustry.

Plantsiteselectionandgeneralplanningshallfollowthebasicnationalpolicyofproperuseand

3.1.2

conservationoflandresourcesandprotectionoffarmlands,complywiththelocalgeneralplanningfor

landuse,andimprovelanduseefficiency.

Plantsiteselectionandgeneralplanningshallbeinaccordancewithlocalurbanandindustrial

3.1.3

parkplanning.

Plantsiteselectionandgeneralplanningshallbeinaccordancewiththerequirementsand

3.1.4

provisionsonenvironmentalprotection,safetyandhealth,mineralresourceandhistoricalrelic

protection,trafficandtransportation,etc.

3.2PlantSiteSelection

Plantsiteselectionshallbetechnicallyfeasible,favorablefor專用socialstability,socialbenefit,

3.2.1

economicbenefitandenvironmentalbenefit.Ifseveralsitesareavailablefortheproposedplant,theplant

siteshallbeselectedthrougheconomicalandtechnicalcomparison.

Deepinvestigations,studies,analysisandassessmentshallbemadeforthefollowingaspects

3.2.2

whenselectingtheplantsite:

Sitesafety.

1

Strategicindustrialplanning.

2

Surroundingenvironmentalstatusandobjectswithenvironmentalsensitivity.

3

Localurbanplanningandindustrialparkplanning.

4

Locallandutilizationplanningandlandavailability.

5

Localnaturalconditions.

6

Localtrafficandtransportationconditions,aswellasfeedstockandproducttransportation

7

options.

Utilitiessupplyconditionsortheutilitiesavailabletosupporttheplant.

8

Wastesolidtreatmentandeffluentdrainage.

9人人文庫

Localcollaborationandservicesavailabletosupporttheplant.

10

Technicalandeconomicconditionsrequiredduringplantconstruction.

11

Futuredevelopment.

12

Plantshouldbesitedinuncultivatedlandorbadland,andbasicfarmlandshallnotbeoccupied.If

3.2.3

theplantislocatedinthecoastalarea,thereclaimedareamaybeselectedastheplantsite.

Plantshallbesitedfarawayfromenvironmentsensitiveareassuchastheurbanareasoflarge

3.2.4-

andmediumsizecities,publicwelfarefacilitiesandcommunities,andshouldbelocatedattheupwind

-

sideofwinddirectionwithminimumfrequencythroughouttheyearofadjacentenvironmentsensitive

area.

·4·

Plantshallbepreferablysitedintheareawheregoodcollaborationconditionsandsocialservices

3.2.5

areavailabletosupporttheplant.

Plantshallbepreferablysitedintheareawithgoodtopographical,geological,hydrographicand

3.2.6

meteorologicalconditions,andshouldnotbesitedintheareawithcomplexnaturallandformorsteep

naturalgradient.

Plantshallnotbesitedintheareawithpotentialflood,tideorwaterlogging,whenunavoidable,

3.2.7

reliablefloodcontrolanddrainagemeasuresshallbetaken.

Plantshallbesitedintheareawhereairemissiondispersion,effluentwaterdischargeandsolid

3.2.8

wastestorageresultinlessimpacttothesurroundingenvironment.

Plantsiteselectionshallavoidlargerelocationoflocalresidents,ifnecessary,therelocationshall

3.2.9

befullyassessed.

Reliablewatersupplyandpowersupplyshallbesecuredintheareawheretheplantissited.

3.2.10

Plantshouldbesitedintheareawithconvenientfeedstocktransportationconditions,large

3.2.11

marketdemandandhighconsumptioncapacity,andshouldbeinaccordancewiththefollowing

requirements:

Ifcrudeoilisusedasthefeedstock,theplantshouldbesitedintheareawherecrudedepots,

1

largeoilproductterminalsoroilconveyingpipelinesareavailable.

Ifcoalisusedasthefeedstockorfuel,theplantshouldbesitedneartotherawcoalminingarea

2

ortheareawithgoodtransportationconditionsavailableforrawcoal.專用

Plantsiteselectionshallbefavorableforsustainableandcoordinateddevelopmentwiththe

3.2.12

surroundingenvironment,andtheenterpriseswithsimilarnatureorcollaborationrelationsshouldbe

selectedastheneighboringenterprises.

Plantsiteselectionshallmeettherequirementsoftheplantlongtermplanning.

3.2.13-

Revamporexpansionprojectshallbepreferablylocatedintheexistingplantareatoproperly

3.2.14

usetheidlelandandfacilitiesforintegratingthelandresource.Whennecessarytoselectanewsite,the

interfacebetweennewplantareaandexistingplantareashallbeproperlyconsideredformakingfulluse

oftheexistingfacilitiesandavoidanceofrepeatedconstruction.

Thelocationsofwatersource,effluentoutfall,solidwastelandfillyards,andthelandsforroads,

3.2.15

railway,jettyandotheroutsidefencesupportfacilitiesshallbealsodeterminedatplantsiteselection

stage.

Plantshallnotbesitedinthefollowingareasorzones:

3.2.16

1Seismicfaultzoneandtheareawithseismicprecautionaryintensityof9degreeandabove.

,,

2Potablewater人人文庫resourceprotectionareatheforestagricultureprotectionandfuture

,,

developmentareasdesignatedbythestatenaturalprotectionareasscenicspotsandhistoricalsite

protectionareas.

3Theareaspronetogeologicaldisastersandkeypreventionareaofgeologicaldisasters

,,,,,

suchasmountaincollapsemudslidemudflowdriftsandsevergroundsettlementorcollapsethe

miningcollapseorfaultedarea.

,

4Theflooddetention/retardingbasintheareapossiblyfloodedwithwaterincaseofdamor

bundbreaking.

5Theareajeopardizingtheclearanceprotectionzonefortheairport.

Thepromisingmineralareaorthemineralresourcereservedarea.

6

·5·

Theareawithshortageofwaterresources.

7

Thezoneswithpoorgeologicalconditionssuchasheavyloesscollapsibleunderoverburden

8

pressurezone,recentlydepositedloesszoneinlargethicknessandthesaturatedloesszoneinhigh

compressibility.

Thezonewithpoornaturalventilationinmountainousorhillyareas.

9

3.3GeneralPlanning

Aftersiteselection,generalplanningshallbefirstmadefortheplantandoutsidefencesupport

3.3.1

facilitiesinthesite.

Generalplanningshallhighlighttheoverallbenefitanddevelopmentoftheprojectandtheinter

3.3.2-

relationsofproduction,storage,transportationandmanagementforproperintegrationandcoordination.

Generalplanningshallproperlyorganizethelogisticsforconvenienttransportationand

3.3.3

separationofcargoaccessandpedestrianaccessbasedonthefeaturesoftheplantanditssupport

facilities.

Regionalfloodcontrolanddrainagesystemsshallbeplannedinanintegratedway.

3.3.4

Thearrangementforadjacentplantsshallfollowtheprinciplesbelow:

3.3.5

Theadministrativeareasandotheroccupiedbuildingsofadjacentplantsmaybearrangedina

1

centralizedareaoutsidetheplantareas.

Thefeedstockandproductstoragetanksfordifferentplantsmay專用beplannedinthesameoil

2

depotoutsidetheplantareas.

Theutilitiesandsupportfacilitiesmaybecentralizedbasedontheirscopeofservicestoprovide

3

servicesformultipleplants.

Theflarezoneshouldbeproperlyplannedandservesformultipleplantsortheplantareas

4

constructedatdifferentstages.

Thelogisticsmethods,logisticsroutings,andpublicroads,railway,waterwaysandpipeline

5

shouldbeplannedinanintegratedway.

Thepossiblecrosspollutionshallbeavoidedbetweenadjacentplantareas.

6-

Themainsubstationoutsidefenceshallbearrangedinasafelocationthatshallfacilitate

3.3.6

installatio

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

最新文檔

評論

0/150

提交評論