版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
**SAGD
Drilling
ExperienceSAGD鉆井服務(wù)Sperry
Drilling
Services
ChinaSeptember
2008Agenda
目錄*What’s
SAGD?What
does
it
do?SAGD
ApplicationWhat
are
the
results?Case
Story2The
basic
theory
behind
SAGD
is
to
injectsteamatslightlyhigher
than
reservoir
pressure
into
the
upper
well.
A
steamchamber
is
created
as
thesteamcontacts
the
bitumen
and
condenses.
The
condensed
steamand
melted
bitumen
fall
by
gravity
drainage
and
are
produced
from
the
lowerwell.Steam-Assisted
Gravity
Drainage
蒸汽輔助重力泄油*What
does
it
do?能做什么?It
involves
accurate
drilling
of
well
pairs
in
the
formation.Steam
is
injected
in
the
upper
well
to
assist
productiolower
well
準(zhǔn)確進(jìn)行成對(duì)水平井的作業(yè)。蒸汽由上部井眼注入提高下部井眼的采收率。4*Typical
coordinate
uncertaintyLateral
VerticalRequired:
○
2
○
1
metersUncertainty
at
end
of
well:MWD:
○
30○
4
metersGyro:
○
10○
3
metersUncertainty
of
SAGD
Well
Separation
Using
Conventional
Survey
MethodsSeparation
calculated
using
conventional
survey
methodsis
subject
to
cumulativeerrorsexceeding
SAGD
tolerances利用常規(guī)測(cè)量手段所產(chǎn)生的累計(jì)誤差遠(yuǎn)遠(yuǎn)超過(guò)SAGD的精度要求Why
is
well
bore
ranging
required?為什么需要控制井眼間距?With
SAGD
wells,the
proximity
of
the
well
bores
to
one
another
is
critical
formaximum
recovery
對(duì)于SAGD井,平行井眼之間的距離是獲取最大采收率的關(guān)鍵Typicalcoordinateuncertainty典型的測(cè)量誤差Lateral
橫向
Vertical
垂向Required
要求:
2 1
metersUncertainty
at
end
of
well
井底誤差:*MWD:304
metersGyro:103
meters5Typical
coordinateuncertainty(
between
2
&
5%
of
separation
)Lateral
:
○
0.1
-
0.25
metersvertical
:
○
0.1
-
0.25
metersAt
5meter
separationWhy
is
well
bore
ranging
required?為什么需要控制井眼間距?Each
ranging
survey
measures
separation
precisely
given
an
independent
determination
of
wellseparation
and
coordinates
每次的控制間距測(cè)量給出一個(gè)獨(dú)立的分離距離和坐標(biāo)數(shù)值*Typical
coordinateuncertainty典型的坐標(biāo)誤差(
between
2
&
5
%
of
separation
)(介于2
和5
%
的分離)
Lateral
橫向:
0
.1
-
0
.25
metersVertical
垂向
:
0
.1
-
0
.25
metersAt5meterseparation當(dāng)分離距離為5米時(shí)6Control
the
separationVertical
and
horizontal
separation
measured
within
the
precision
of
a
few
inches
from
the
reference
well
bore.Control
the
separation
with
links
to
Halliburton’s
MWD
System
與哈里伯頓的MWD配合使用控制井眼間距TTyyppiiccaall
ccoooorrddiinnaattee
uunncceerrttaaiinnttyy((
bbeettwweeeenn
22
&&
55%%
ooff
sseeppaarraattiioonn
))
LLaatteerraall
::
00..11
--
00..2255
mmeetteerrssvveerrttiiccaall
::
00..11
--
00..2255
mmeetteerrssAAtt
55
mmeetteerr
sseeppaarraattiioonnMagnetic
Guidance
ToolTM
磁性導(dǎo)向工具*7Magnetic
Guidance
ToolTM
–
Theory
of
OperationMagnetic
Guidance
ToolTM
–Theory
of
Operation
磁性導(dǎo)向工具的測(cè)量原理Operational
Procedure
作業(yè)程序8*The
RMRS
usesamagnetic
bit
sub
in
combinationwitha
wireline
receiver
tool
to
precisely
control
the
separation
of
a
SAGD
well
pair.
Verticaland
Horizontal
separations
are
measured
with
a
precision
of
afew
10ths
of
a
meter
while
drilling
the
2nd
well
bore.Rotating
Magnet
Ranging
System
TM旋轉(zhuǎn)磁性測(cè)距系統(tǒng)How
it
works
如何工作?9*Rotating
Magnet
Ranging–Theory
of
Operation旋轉(zhuǎn)磁性測(cè)距的測(cè)量原理Operational
Procedure
作業(yè)過(guò)程Separation
Distance分離距離RMRSTM
Sensor
傳感器The
amplitude
of
the
axial
magnetic
field
component
goes
through
aminimum
as
the
RM
bit
sub
passes
the
sensor通過(guò)旋轉(zhuǎn)磁性接頭的傳感器的軸向磁場(chǎng)的振幅最小The
measured
distance
between
the
two
maxima
approximates
theradial
separation
between
wells測(cè)量?jī)煽诰g最大的徑向分離距離*10Choosing
the
right
system
選擇正確的系統(tǒng)Operational
Procedure
作業(yè)過(guò)程Distance
距離MGTTMRMRSTM5-10
meters2%
of
separation(0.1
–
0.2m)5%
of
separation(0.25
–
0.5m)10-25
meters5%(0.5
–
1.25m)5%(0.5
-
1.25m)25-50+
metersOut
of
Range5%(1.25
–
2.50m)*The
MGT
has
a
slightly
better
accuracy
at
close
proximities
increasingseparation
control
between
well
bores
當(dāng)井距較近時(shí)MGT精度較高The
RMRS
has
a
significantly
increased
range
and
is
suited
forobservation
well
positioning
RMRS用于井距較大時(shí),適合于觀察井11Choosing
the
right
system
選擇正確的系統(tǒng)Comparison
兩個(gè)系統(tǒng)的比較Consideration
內(nèi)容MGTTMRMRSTMFit-For-Purpose
主要用途Horizontal
well
tracking
水平井Well
Intersection
交叉井Proven
technology
成功實(shí)例400+wellpairssince1993自1993年完成400多對(duì)100
pairs
since
2001
自2001年完成100多對(duì)Hz.Well
to
Hz.Well
Precision(<10
m)水平井井眼的距離精度+/-
2%
(10
–
20
cm)+/-
5%
(25
-
50
cm)Operational
Simplicity
配套設(shè)施MWD’s
can
handle
MWDAdditionalspecialistreq’d其他專家Signal
Isolation
信號(hào)隔離No
impact
無(wú)影響Impact
of
motor
and
bit
freq.受鉆頭和馬達(dá)的影響NPT
due
to
re-shots
重復(fù)測(cè)量的時(shí)間2
–
3
minutesWipedepthintervalrequired交叉深度段需要Multiple
Casing
Strings
套管串的影響Calibratedforallcasingscenarios標(biāo)定所有的管串Reductioninsignalstrength降低信號(hào)的強(qiáng)度Operating
Temperature
Range
作業(yè)溫度Maximum
of
1400
C最高M(jìn)aximum
of
850
C最高Redrill/In-fill
Well
Ranging
重鉆/加密井距Preferred
首選Not
Preferred
(casing/temp)非首選(套管/溫度)Vertical
Well
to
Hz.Well
Precision
直井到水平井精度距離Max
25m
range
最大25米R(shí)ange
beyond
25m
大于25米*12Any
Application
where
one
well
bore
must
be
accurately
referenced
to
anotherSAGD
Well
PairSAGD
Observation
wellsCoal
Bed
Methane
De-gasifying
wellsWell
Bore
to
Well
Bore
intersection
wellsWhere
is
it
used?應(yīng)用范圍?Accurately
referencing
two
well
bores
精確地參照兩個(gè)井眼Any
application
where
one
well
bore
must
be
accuratelyreferencedby
another.一口井必須精確地參考另外一口井進(jìn)行作業(yè)SAGD
Well
Pair
成對(duì)SAGD井SAGD
Observation
Wells
SAGD觀測(cè)井Coal
Bed
Methane
De-gasifying
wells
煤層氣除氣井Well
bore
to
Well
Bore
intersection
wells
井眼之間的交叉*13The
advantages
–Sperry
representative
on
rig
for
first
job
onlyEasy
local
maintenanceNotes
–Initiates
correction
at
0.2
degrees
inclinationBit
driven
by
GeoForce?
motorDesigned
for
limited
rotationNo
particular
bit
pressure
drop
requiredSperry
representative
on
rig
for
first
job
onlyCheck
shots
if
required
by
anything
from
Totco
to
LWDEasy
local
maintenanceHole
sizes
12
?”
to
~20”,
changeable
on
rig.First
commercialtools
available
Q406.Where
is
it
used?應(yīng)用范圍?Steam
Assisted
Gravity
Drainage
(SAGD)蒸汽輔助泄油Steam
Assisted
Gravity
Drainage
is
a
production
method
used
to
increaserecoverable
reserves
from
heavy
oil
&
bitumen
reserves蒸汽輔助泄油用于重油或?yàn)r青油藏的增產(chǎn)開(kāi)發(fā)Improve
Recovery
Factors
提高采收率Cold
Production
5-15%冷油藏5-15%CSS
17-25%(single
well)CSS
17-25%(單井)SAGD
70
to
80%
SAGD70-80%Increase
Production
rates
提高產(chǎn)量Use
heat
to
mobilize
slow
moving
heavy
oil
利用加熱驅(qū)動(dòng)重油緩慢流動(dòng)Production
Rates
of
500–1500
BBL
per
day
每天產(chǎn)量500–1500
BBL*14Heavy
Oil
Drilling
Experience重油鉆井經(jīng)驗(yàn)*
Sperry
Drilling
Services
is
a
leader
in
heavy
oil
drilling
exp
worldwide是世界范圍內(nèi)重油鉆井經(jīng)驗(yàn)的先導(dǎo)者Located
in
many
parts
of
the
world
including
Canada,Venezu
Indonesia,Russia,China
遍布世界的許多地方:加拿大,委內(nèi)瑞印度尼西亞,俄羅斯,中國(guó)Technology
Experience
技術(shù)經(jīng)驗(yàn)Conventional
heavy
oil
常規(guī)重油開(kāi)采Multilaterals
for
heavy
oil
多分枝重油開(kāi)采Steam-Assisted
Gravity
Drainage(SAGD)熱蒸汽重力瀉油(SAGDWell
intersections
and
complex
well
geometries
交叉井和復(fù)雜面井15Out
of
all
the
SAGD
pairs
drilled,
92%
have
been
drilled
by
Halliburton
–
Sperry
Drilling
Services.
A
small
handful
of
other
wells
have
beendrilled
by
other
companiesSAGD
Statistics
SAGD作業(yè)統(tǒng)計(jì)*380
-
400
SAGD
pairs
drilled
worldwide世界范圍內(nèi)鉆了大約380-400口SAGD成對(duì)井,分別由以下公司完成:86.0%
–
Halliburton
–
Sperry
Drilling
Services9.0%
–
Precision
Drilling
–
Computalog5.0%
–
Directional
Plus
–
(Independent)0.0%
–
Baker
Hughes
InteQ0.5%
–
Schlumberger
–
Anadrill16This
project
is
currently
being
planned
as
the
longest
toe-to-toe
well
intersection.
Because
of
the
distance
and
depthinvolved,
acombinationofsurvey
accuracy,
declination
monitoring
and
geological
control
techniques
will
be
used
to
get
the
two
wells
in
range
to
be
intersected.Once
the
wells
are
in
range,
magnetic
ranging
techniques
will
be
used
to
intersect
the
wells.Sperry
Drilling
Services
Toe-to-Toe
Intersection
–
Can*Sperry鉆井服務(wù)公司的水平井終端與終端相交–加拿大Completed
October
2004完鉆時(shí)間:2004年十月Wellheads:
3,000
m
apart井口相隔:3,000
mFormations:
1,500
m
deep底層深度:1,500
mAccomplished
using:應(yīng)用的技術(shù):Survey
accuracy
and
real-time
magneticdeclination
monitoring精確測(cè)量和實(shí)時(shí)磁偏角監(jiān)測(cè)Geological
control
to
control
TVD地質(zhì)導(dǎo)向控制垂深Sweeping
the
boreholes
across
each
other
until
they
intersect相交后互相清洗井眼17*
Two
SAGD
injection
wells,
H314-2
&
H313-2
,
were
successfully
drilled
in
PanLiaohe
Oilfield
from
19th
June
to
19th
July
2008.2008年6月19日至7月19日,在遼河油田成功地完成了兩口SAGD的作業(yè)
Halliburton
provided
EMWD,
MGT,
ABI
Motor
in
both
the
12-1/4”
and
8-1/2”Hole
Sections.
哈里伯頓公司提供了12-1/4”和8-1/2”井眼的EMWD,MGT和ABI導(dǎo)向馬達(dá)技術(shù)服務(wù)Halliburton
also
provided
well
planning
and
anti-collision
services哈里伯頓同時(shí)也提供了注汽井的軌跡設(shè)計(jì)和施工過(guò)程中的防碰作業(yè)Total
operation
14.5
days,
10
days
ahead兩口井的總作業(yè)時(shí)間14.5天,比設(shè)計(jì)提前了10天SAGD
in
China
SAGD在中國(guó)18SAGD
in
China
SAGD在中國(guó)
Halliburton
equipment
operated
with
very
littledown
time,
and
data
accuracy
was
tested
with
therequest
of
re-shooting
MGT
surveys.
All
of
whichwere
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 事業(yè)單位員工合同協(xié)議書(shū)
- 企業(yè)資產(chǎn)購(gòu)置合同模板
- 機(jī)構(gòu)用工合同協(xié)議書(shū)
- 實(shí)驗(yàn)室合作協(xié)議范本
- 工業(yè)廠房租賃合同標(biāo)準(zhǔn)文本
- 期貨交易數(shù)據(jù)服務(wù)協(xié)議
- 廣東省室內(nèi)裝潢設(shè)計(jì)工程施工合同示例
- 保安服務(wù)合同協(xié)議書(shū)范本
- 房屋翻新合同的范本
- 廣東省批發(fā)花卉選購(gòu)合同
- 2024年高三數(shù)學(xué)復(fù)習(xí)備考策略講座
- 山東省2023-2024學(xué)年高一上學(xué)期語(yǔ)文期中考試試卷(含答案)
- 人力資源行業(yè)人才招聘網(wǎng)站設(shè)計(jì)與優(yōu)化方案
- 高職計(jì)算機(jī)專業(yè)《數(shù)據(jù)庫(kù)原理與應(yīng)用》說(shuō)課稿
- 8 網(wǎng)絡(luò)新世界 第三課時(shí)(教學(xué)設(shè)計(jì))統(tǒng)編版道德與法治四年級(jí)上冊(cè)
- 2024-2030年全球與中國(guó)金屬線柵偏振片行業(yè)市場(chǎng)現(xiàn)狀調(diào)研分析及發(fā)展前景報(bào)告
- 2025年考研政治政治理論時(shí)政熱點(diǎn)知識(shí)測(cè)試題庫(kù)及答案(共三套)
- 抑郁癥培訓(xùn)課件
- 2025年研究生考試考研動(dòng)物生理學(xué)與生物化學(xué)(415)測(cè)試試題及答案解析
- 2025年研究生考試考研思想政治理論(101)自測(cè)試卷與參考答案
- 小學(xué)生競(jìng)選班委課件
評(píng)論
0/150
提交評(píng)論