主 講曾紹武 陜西鐵路工程職施工課件講解_第1頁(yè)
主 講曾紹武 陜西鐵路工程職施工課件講解_第2頁(yè)
主 講曾紹武 陜西鐵路工程職施工課件講解_第3頁(yè)
主 講曾紹武 陜西鐵路工程職施工課件講解_第4頁(yè)
主 講曾紹武 陜西鐵路工程職施工課件講解_第5頁(yè)
已閱讀5頁(yè),還剩22頁(yè)未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶(hù)提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

主講:曾紹武

陜西鐵路工程職業(yè)技術(shù)學(xué)院第27講懸臂施工(3)《橋梁施工》精品資源共享課"BridgeConstruction"qualityresourcesharingclassLecture27oncantileverconstruction(3)Speaker:ZengShaowu,ShaanxiRailwayEngineeringVocationalandTechnicalCollege

0號(hào)段Section0懸澆段Suspensionsection

合攏段Closethesegment懸臂施工邊跨現(xiàn)澆段Sideacrossthecast-in-placesection

支架法、托架法掛籃施工法Hangingbasketconstructionmethod有支架施工法Thereisabracketconstructionmethod掛籃騎跨HangbasketridecrosscantileverbeintheprocessofconstructionSupportmethod,bracketmethod懸臂澆筑段施工任務(wù)Constructiontaskofthecantileverpouringsection

1one掛籃施工工藝流程Constructionprocessofhangingbasket

2two

3three施工設(shè)備選用及注意問(wèn)題Constructionequipmentselectionandpayattentiontotheproblems施工過(guò)程實(shí)施方案Constructionprocessimplementationplan任務(wù)1:掛籃施工工藝Task1:Constructiontechnologyofhangingbasket子任務(wù)1.掛籃施工工藝流程?Sub-task1.Hangingbasketconstructionprocess?解析子任務(wù)1:懸臂澆筑段施工工序Parsethesub-task1:theconstructionprocessofthecantileverpouringsection

掛籃試壓Hangbaskettestpressure

安裝掛籃Installthehangingbasket

調(diào)整模板系統(tǒng)Adjustthetemplatesystem

綁扎鋼筋預(yù)留孔道BreservereinforcementPouringconcrete澆筑混凝土

養(yǎng)護(hù)拆模Maintenanceandmoldremoval穿束張拉預(yù)應(yīng)力筋Wearthebundleintensionandpulltheprestressedtendons壓漿封端Pressureslurrysealingend

掛籃移動(dòng)HangbasketmoveHangbasketmove任務(wù)2:預(yù)應(yīng)力鋼筋布置方案Task2:Arrangementschemeofprestressedreinforcement子任務(wù)1.三向預(yù)應(yīng)力鋼筋位置及作用?1.Positionandfunctionofthree-wayprestressedreinforcement?子任務(wù)2.預(yù)應(yīng)力定位方法措施?Sub-task2.Prestresspositioningmethodsandmeasures?1.1縱向預(yù)應(yīng)力鋼筋位置及作用?1.1Locationandfunctionoflongitudinalprestressedreinforcement?子任務(wù)1.1解析:縱向預(yù)應(yīng)力沿著梁體縱向布置,主要抵抗縱向彎矩,鋼絲束。

Sub-task1.1Analysis:Thelongitudinalprestressisarrangedverticallyalongthebeambody,mainlyresistingthelongitudinalbendingmomentandthesteelwirebeam指出圖中豎向形式及作用?子任務(wù)1.2豎向預(yù)應(yīng)力鋼筋位置及作用?Sub-task1.2Positionandfunctionofverticalprestressedreinforcement?子任務(wù)1.2解析:豎向預(yù)應(yīng)力沿著梁體豎向布置,主要抵抗剪力,精軋螺紋鋼。Sub-task1.2Analysis:verticalprestressisarrangedverticallyalongthebeambody,mainlyresistingshear,finerolledrebar.子任務(wù)1.3.橫向預(yù)應(yīng)力鋼筋類(lèi)型及作用?1.3.Typeandfunctionoftransverseprestressedreinforcement?子任務(wù)1.3解析:橫向預(yù)應(yīng)力沿著梁頂翼緣板橫向布置,主要抵抗橫向彎矩,扁錨鋼絞線。Sub-task1.3Analysis:Horizontalprestressisarrangedhorizontallyalongthebeamtopflangeplate,mainlyresistingthehorizontalbendingmomentandflatanchorsteelstrand.預(yù)應(yīng)力鋼筋怎么保證位置?子任務(wù)2.預(yù)應(yīng)力鋼筋定位方法措施?Sub-task2.Positioningmethodandmeasuresofprestressedreinforcement?子任務(wù)2解析:定位鋼筋和架立鋼筋。Sub-task2analysis:positioningsteelbarsanderectingsteelbars.預(yù)應(yīng)力管道位置Prestressedpipelocation

任務(wù)3.預(yù)應(yīng)力鋼筋張拉實(shí)施

方案及設(shè)備選用Task3.Implementationplanoftensioningofprestressedreinforcementandequipmentselection子任務(wù)1.預(yù)應(yīng)力鋼筋張拉方法?

Sub-task1.Thetensionmethodofprestressedreinforcement?子任務(wù)3.預(yù)應(yīng)力張拉雙控含義?Sub-task3.Themeaningofprestressedtensionanddoublecontrol?子任務(wù)2.預(yù)應(yīng)力鋼筋張拉所用設(shè)備?Sub-task2.Equipmentforprestressedreinforcement?子任務(wù)4.預(yù)應(yīng)力鋼筋張拉安全控制要求?

Sub-task4.Safetycontrolrequirementsofprestressedreinforcementtension?子任務(wù)1-2解析:雙端整體一次性張拉設(shè)備:穿心式千斤頂,油壓表。Sub-task1-2analysis:dual-endoveralldisposabletensionequipment:heart-piercingjack,oilpressuregauge.子任務(wù)3-4解析:應(yīng)力控制和伸長(zhǎng)量控制安全要求:千斤頂校核,控制張拉速度和張拉力,張拉后端不能站人。Sub-task3-4analysis:stresscontrolandelongationcontrolsafetyrequirements:jackcheck,controlthetensionspeedandtension,thetensionbackendcannotstandpeople.張拉設(shè)備安放Placementoftensioningequipment

橫向預(yù)應(yīng)力張拉Transverseprestressedtension

豎向預(yù)應(yīng)力張拉Verticalprestressedtension

切割工作長(zhǎng)度Cutworkinglength

封端、壓漿Enclosure,grouting移動(dòng)掛籃Mobilehangingbasket

移動(dòng)掛籃Mobilehangingbasket

逐段懸臂澆筑直到合攏段Placecantileveruntilclosed掛籃懸臂澆筑施工工藝Constructiontechnologyofhangingbasketcantileverpouring

掛籃前移Hangthebasketforward掛籃調(diào)整錨固管道布置pipinglayout砼灌注Concreteperfusion預(yù)應(yīng)力張拉Prestressedtension孔道壓漿Holepressureslurry懸臂澆筑施工工藝Hangingarmpouringconstructiontechnology懸臂澆筑段施工工藝;Constructiontechnologyofthecantileverpouringsection;三向預(yù)應(yīng)力鋼筋位置和作用;Positionandactionofthree-wayprestressedreinforcement;預(yù)應(yīng)力張拉的要求、雙控含義;Requirementsofprestressedtensionandthemeaningofdoublecontrol;安全控制的要求。Safetycontrolrequirements.總結(jié)sumup(1)橋墩施工情境:30+45+30m連續(xù)梁橋,矩形橋墩,柱高16-30m,橋下無(wú)水。要求編制懸臂施工方案,制定相應(yīng)的實(shí)施工藝和設(shè)備選用及質(zhì)量控制措施。(1)Pierconstructionsituation:304530mcontinuousbeambridge,rectangularpier,columnheight16-30m,nowaterunderthebridge.Itisrequiredtopreparethecantileverconstructionplan,andformulatethecorrespondingimplementationprocessandequipmentselectionandqualitycontrolmeasures.(2)繪制懸臂施工工藝流程圖(2)Drawtheconstructionprocessflowchartofthecantilever作業(yè)卡片jobcard關(guān)鍵:根據(jù)橋梁

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論