




免費預(yù)覽已結(jié)束,剩余81頁可下載查看
下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)
文檔簡介
relationship established equivalent relationship 14 and subject application problem 4 scores and percentage application problem review content overview answers scores and percentage application problem of key is according to meaning 1 determine standard volume units 1 2 find associate volume rate corresponds to relationship Then in line solution Category fraction multiplication word problem score Division applications engineering problem problem XV a subject review of the measurement of the amount of capacity measurement and units of measurement of common units of measurement and their significance in rate 1 currency length area volume unit size volume weight and rate Omitted 2 commonly used time units and their relationships Slightly with a measurement units Zhijian of of poly 1 and of method 2 and poly method 3 and of method and poly method of relationship measurement distance of method 1 and tool measurement 2 and estimates 16 and subject geometry preliminary knowledge 1 line and angle review content line and segment and Ray and vertical and parallel and angle angle of classification slightly 17 and subject geometry preliminary knowledge 2 plane graphics review content triangle and edges shaped and round and fan axisymmetric graphics perimeter and area combination graphics of area subject Preliminary knowledge 3 review of solid content category 1 d shapes are divided into cylinder and cone 2 column is divided into cuboid square 3 cone cone of the features of cuboids and cubes relationship between characteristics of circular cone is slightly solid surface area and volume 1 size 2 table 和和 某某工程 施工監(jiān)理規(guī)劃 湖北中南市政工程監(jiān)理有限公司 200 年 月 relationship established equivalent relationship 14 and subject application problem 4 scores and percentage application problem review content overview answers scores and percentage application problem of key is according to meaning 1 determine standard volume units 1 2 find associate volume rate corresponds to relationship Then in line solution Category fraction multiplication word problem score Division applications engineering problem problem XV a subject review of the measurement of the amount of capacity measurement and units of measurement of common units of measurement and their significance in rate 1 currency length area volume unit size volume weight and rate Omitted 2 commonly used time units and their relationships Slightly with a measurement units Zhijian of of poly 1 and of method 2 and poly method 3 and of method and poly method of relationship measurement distance of method 1 and tool measurement 2 and estimates 16 and subject geometry preliminary knowledge 1 line and angle review content line and segment and Ray and vertical and parallel and angle angle of classification slightly 17 and subject geometry preliminary knowledge 2 plane graphics review content triangle and edges shaped and round and fan axisymmetric graphics perimeter and area combination graphics of area subject Preliminary knowledge 3 review of solid content category 1 d shapes are divided into cylinder and cone 2 column is divided into cuboid square 3 cone cone of the features of cuboids and cubes relationship between characteristics of circular cone is slightly solid surface area and volume 1 size 2 table 和和 監(jiān)理規(guī)劃監(jiān)理規(guī)劃 編寫人編寫人 relationship established equivalent relationship 14 and subject application problem 4 scores and percentage application problem review content overview answers scores and percentage application problem of key is according to meaning 1 determine standard volume units 1 2 find associate volume rate corresponds to relationship Then in line solution Category fraction multiplication word problem score Division applications engineering problem problem XV a subject review of the measurement of the amount of capacity measurement and units of measurement of common units of measurement and their significance in rate 1 currency length area volume unit size volume weight and rate Omitted 2 commonly used time units and their relationships Slightly with a measurement units Zhijian of of poly 1 and of method 2 and poly method 3 and of method and poly method of relationship measurement distance of method 1 and tool measurement 2 and estimates 16 and subject geometry preliminary knowledge 1 line and angle review content line and segment and Ray and vertical and parallel and angle angle of classification slightly 17 and subject geometry preliminary knowledge 2 plane graphics review content triangle and edges shaped and round and fan axisymmetric graphics perimeter and area combination graphics of area subject Preliminary knowledge 3 review of solid content category 1 d shapes are divided into cylinder and cone 2 column is divided into cuboid square 3 cone cone of the features of cuboids and cubes relationship between characteristics of circular cone is slightly solid surface area and volume 1 size 2 table 和和 目 錄 1 工程概況 工程概況 1 1 1 工程背景 1 1 2 工程概況 2 2 監(jiān)理工作的范圍 內(nèi)容 目標(biāo)和依據(jù) 監(jiān)理工作的范圍 內(nèi)容 目標(biāo)和依據(jù) 3 2 1 監(jiān)理工作的范圍 3 2 2 監(jiān)理工作內(nèi)容 3 2 3 監(jiān)理工作的目標(biāo) 4 2 4 監(jiān)理工作依據(jù) 4 2 5 主要技術(shù)規(guī)范及標(biāo)準(zhǔn) 4 3 項目監(jiān)理機構(gòu)的組織形式 項目監(jiān)理機構(gòu)的組織形式 6 3 1 駐場監(jiān)理組織機構(gòu)圖 6 3 2 駐場監(jiān)理機構(gòu)人員配備計劃 8 4 監(jiān)理人員職責(zé)和權(quán)利 監(jiān)理人員職責(zé)和權(quán)利 9 4 1 總監(jiān)理工程師的主要職責(zé) 9 4 2 總監(jiān)理工程師的權(quán)力 10 4 3 總監(jiān)代表職責(zé)和權(quán)利 10 4 4 專業(yè)監(jiān)理工程師的主要職責(zé) 11 4 5 專業(yè)監(jiān)理工程師的權(quán)力 11 4 6 監(jiān)理員的主要職責(zé) 12 4 7 監(jiān)理員的權(quán)力 12 5 監(jiān)理工作程序 工作制度及工作深度 監(jiān)理工作程序 工作制度及工作深度 13 5 1 監(jiān)理工作程序 13 5 2 監(jiān)理工作制度 14 5 2 1 信息和資料管理制度 14 5 2 2 監(jiān)理會議制度 14 5 2 3 監(jiān)理工作報告制度 15 5 2 4 設(shè)計文件審核簽發(fā)與技術(shù)交底制度 16 5 2 5 工程質(zhì)量和質(zhì)量事故報告與處理制度 17 relationship established equivalent relationship 14 and subject application problem 4 scores and percentage application problem review content overview answers scores and percentage application problem of key is according to meaning 1 determine standard volume units 1 2 find associate volume rate corresponds to relationship Then in line solution Category fraction multiplication word problem score Division applications engineering problem problem XV a subject review of the measurement of the amount of capacity measurement and units of measurement of common units of measurement and their significance in rate 1 currency length area volume unit size volume weight and rate Omitted 2 commonly used time units and their relationships Slightly with a measurement units Zhijian of of poly 1 and of method 2 and poly method 3 and of method and poly method of relationship measurement distance of method 1 and tool measurement 2 and estimates 16 and subject geometry preliminary knowledge 1 line and angle review content line and segment and Ray and vertical and parallel and angle angle of classification slightly 17 and subject geometry preliminary knowledge 2 plane graphics review content triangle and edges shaped and round and fan axisymmetric graphics perimeter and area combination graphics of area subject Preliminary knowledge 3 review of solid content category 1 d shapes are divided into cylinder and cone 2 column is divided into cuboid square 3 cone cone of the features of cuboids and cubes relationship between characteristics of circular cone is slightly solid surface area and volume 1 size 2 table 和和 2 5 3 監(jiān)理工作深度 17 6 工程質(zhì)量控制 工程質(zhì)量控制 19 6 1 工程質(zhì)量控制方法 19 6 1 1 工程質(zhì)量控制原則 19 6 1 2 工程質(zhì)量控制的主要方法 19 6 1 3 工程質(zhì)量控制的基本程序 20 6 2 工程質(zhì)量控制措施 21 6 2 1 工程質(zhì)量控制的措施 21 6 2 2 原材料質(zhì)量控制的方法和措施 21 6 2 3 工程質(zhì)量的事前控制措施 24 6 2 4 工程質(zhì)量事中控制措施 26 6 2 5 工程竣工驗收 28 6 2 6 質(zhì)量問題和質(zhì)量事故處理 29 7 工程進(jìn)度控制 工程進(jìn)度控制 31 7 1 工程進(jìn)度控制方法 31 7 1 1 工程進(jìn)度控制的原則 31 7 1 2 工程進(jìn)度控制的基本程序 31 7 1 3 進(jìn)度的動態(tài)控制 32 7 1 4 審批進(jìn)度計劃 33 7 1 5 監(jiān)督進(jìn)度計劃的實施 33 7 1 6 進(jìn)度計劃的調(diào)整 34 7 1 7 工程延期審批 34 7 2 工程進(jìn)度控制的措施 36 8 工程的投資控制 工程的投資控制 37 8 1 工程投資控制方法 37 8 1 1 工程投資控制的依據(jù) 37 8 1 2 工程投資控制的原則 37 8 1 3 工程投資控制的基本方法 38 8 1 4 工程投資控制的基本程序 38 8 2 工程投資控制措施 40 8 2 1 工程投資控制主要措施 40 8 2 2 工程量計量 40 8 2 3 工程款支付 41 relationship established equivalent relationship 14 and subject application problem 4 scores and percentage application problem review content overview answers scores and percentage application problem of key is according to meaning 1 determine standard volume units 1 2 find associate volume rate corresponds to relationship Then in line solution Category fraction multiplication word problem score Division applications engineering problem problem XV a subject review of the measurement of the amount of capacity measurement and units of measurement of common units of measurement and their significance in rate 1 currency length area volume unit size volume weight and rate Omitted 2 commonly used time units and their relationships Slightly with a measurement units Zhijian of of poly 1 and of method 2 and poly method 3 and of method and poly method of relationship measurement distance of method 1 and tool measurement 2 and estimates 16 and subject geometry preliminary knowledge 1 line and angle review content line and segment and Ray and vertical and parallel and angle angle of classification slightly 17 and subject geometry preliminary knowledge 2 plane graphics review content triangle and edges shaped and round and fan axisymmetric graphics perimeter and area combination graphics of area subject Preliminary knowledge 3 review of solid content category 1 d shapes are divided into cylinder and cone 2 column is divided into cuboid square 3 cone cone of the features of cuboids and cubes relationship between characteristics of circular cone is slightly solid surface area and volume 1 size 2 table 和和 8 2 4 竣工決算 42 9 合同管理 合同管理 43 9 1 合同管理的內(nèi)容 43 9 2 合同管理的方法 43 9 2 1 合同管理的基本方法 43 9 2 2 合同管理的基本程序 43 9 2 3 設(shè)計變更 洽商管理 47 9 2 4 工程暫停及復(fù)工的管理 47 9 2 5 工程延期的管理 48 9 2 6 費用索賠的管理 50 9 3 合同糾紛的調(diào)解 53 9 3 1 合同爭議的調(diào)解 53 9 3 2 違約處理 54 10 信息管理 信息管理 57 10 1 信息管理的內(nèi)容 57 10 2 信息管理程序 57 10 3 計算機輔助管理系統(tǒng) 59 10 4 監(jiān)理檔案整理 60 10 5 信息傳遞表 62 10 6 信息管理制度 62 11 組織協(xié)調(diào)工作 組織協(xié)調(diào)工作 64 11 1 組織協(xié)調(diào)的內(nèi)容 64 11 2 組織協(xié)調(diào)的方法 64 11 3 組織協(xié)調(diào)的措施 65 12 安全 文明施工及環(huán)境保護(hù)監(jiān)理 安全 文明施工及環(huán)境保護(hù)監(jiān)理 68 12 1 安全施工的監(jiān)理工作程序 68 12 2 施工準(zhǔn)備階段的安全監(jiān)理工作內(nèi)容 68 12 3 施工過程中的安全監(jiān)理工作內(nèi)容 69 12 4 安全監(jiān)理的方法及措施 71 12 5 文明施工 環(huán)境保護(hù)的監(jiān)理措施 71 13 工程項目監(jiān)理工作制度 工程項目監(jiān)理工作制度 74 relationship established equivalent relationship 14 and subject application problem 4 scores and percentage application problem review content overview answers scores and percentage application problem of key is according to meaning 1 determine standard volume units 1 2 find associate volume rate corresponds to relationship Then in line solution Category fraction multiplication word problem score Division applications engineering problem problem XV a subject review of the measurement of the amount of capacity measurement and units of measurement of common units of measurement and their significance in rate 1 currency length area volume unit size volume weight and rate Omitted 2 commonly used time units and their relationships Slightly with a measurement units Zhijian of of poly 1 and of method 2 and poly method 3 and of method and poly method of relationship measurement distance of method 1 and tool measurement 2 and estimates 16 and subject geometry preliminary knowledge 1 line and angle review content line and segment and Ray and vertical and parallel and angle angle of classification slightly 17 and subject geometry preliminary knowledge 2 plane graphics review content triangle and edges shaped and round and fan axisymmetric graphics perimeter and area combination graphics of area subject Preliminary knowledge 3 review of solid content category 1 d shapes are divided into cylinder and cone 2 column is divided into cuboid square 3 cone cone of the features of cuboids and cubes relationship between characteristics of circular cone is slightly solid surface area and volume 1 size 2 table 和和 4 14 監(jiān)理設(shè)施 監(jiān)理設(shè)施 80 15 工程建設(shè)監(jiān)理用表 工程建設(shè)監(jiān)理用表 82 湖北中南市政工程監(jiān)理有限公司 5 1 工程概況 工程概況 1 1 工程概況 質(zhì)量目標(biāo) 監(jiān)理服務(wù)期限 建設(shè)單位 設(shè)計單位 2 監(jiān)理工作的范圍 內(nèi)容 目標(biāo) 監(jiān)理工作的范圍 內(nèi)容 目標(biāo)和依據(jù)和依據(jù) 2 1 監(jiān)理工作的范圍 relationship established equivalent relationship 14 and subject application problem 4 scores and percentage application problem review content overview answers scores and percentage application problem of key is according to meaning 1 determine standard volume units 1 2 find associate volume rate corresponds to relationship Then in line solution Category fraction multiplication word problem score Division applications engineering problem problem XV a subject review of the measurement of the amount of capacity measurement and units of measurement of common units of measurement and their significance in rate 1 currency length area volume unit size volume weight and rate Omitted 2 commonly used time units and their relationships Slightly with a measurement units Zhijian of of poly 1 and of method 2 and poly method 3 and of method and poly method of relationship measurement distance of method 1 and tool measurement 2 and estimates 16 and subject geometry preliminary knowledge 1 line and angle review content line and segment and Ray and vertical and parallel and angle angle of classification slightly 17 and subject geometry preliminary knowledge 2 plane graphics review content triangle and edges shaped and round and fan axisymmetric graphics perimeter and area combination graphics of area subject Preliminary knowledge 3 review of solid content category 1 d shapes are divided into cylinder and cone 2 column is divided into cuboid square 3 cone cone of the features of cuboids and cubes relationship between characteristics of circular cone is slightly solid surface area and volume 1 size 2 table 和和 6 2 2 監(jiān)理工作內(nèi)容 根據(jù) 工程建設(shè)監(jiān)理規(guī)范 GB50319 2000 及 建設(shè)工程委托監(jiān)理合同 示范文本 GF 2000 0202 的有關(guān)規(guī)定 本公司提供的監(jiān)理服務(wù)內(nèi)容包括 施工 準(zhǔn)備階段 施工階段 質(zhì)量保修期的監(jiān)理工作 并協(xié)助業(yè)主進(jìn)行工程和材料等 招標(biāo)工作 對本工程的質(zhì)量 進(jìn)度和投資進(jìn)行嚴(yán)格控制 確保實現(xiàn)預(yù)定的各項 目標(biāo) 同時 對工程建設(shè)合同和信息進(jìn)行有效管理 并協(xié)調(diào)好有關(guān)單位的工作 關(guān)系 2 3 監(jiān)理工作的目標(biāo) 質(zhì)量控制目標(biāo) 達(dá)到國家現(xiàn)行的施工質(zhì)量驗收規(guī)范合格標(biāo)準(zhǔn) 進(jìn)度控制目標(biāo) 具體按照施工合同工期控制 投資控制目標(biāo) 將監(jiān)理范圍內(nèi)的工程投資控制在 29137 17 萬元人民幣以 內(nèi) 具體以施工合同承包價為實際投資控制目標(biāo) 2 4 監(jiān)理工作依據(jù) 1 國家現(xiàn)行工程建設(shè)的政策 法律 法規(guī) 技術(shù)經(jīng)濟(jì)標(biāo)準(zhǔn)及規(guī)范 2 業(yè)主單位和監(jiān)理單位簽訂的委托監(jiān)理合同 3 業(yè)主單位和承包單位簽訂的本工程施工合同文件 4 本工程施工圖設(shè)計文件 招標(biāo)文件 設(shè)計變更通知 包括設(shè)計交底 圖 紙會審記錄 及工程量清單等 5 各項設(shè)備的技術(shù)文件和安裝說明 6 工程建設(shè)標(biāo)準(zhǔn)強制性條文 湖北中南市政工程監(jiān)理有限公司 7 2 5 主要技術(shù)規(guī)范及標(biāo)準(zhǔn) relationship established equivalent relationship 14 and subject application problem 4 scores and percentage application problem review content overview answers scores and percentage application problem of key is according to meaning 1 determine standard volume units 1 2 find associate volume rate corresponds to relationship Then in line solution Category fraction multiplication word problem score Division applications engineering problem problem XV a subject review of the measurement of the amount of capacity measurement and units of measurement of common units of measurement and their significance in rate 1 currency length area volume unit size volume weight and rate Omitted 2 commonly used time units and their relationships Slightly with a measurement units Zhijian of of poly 1 and of method 2 and poly method 3 and of method and poly method of relationship measurement distance of method 1 and tool measurement 2 and estimates 16 and subject geometry preliminary knowledge 1 line and angle review content line and segment and Ray and vertical and parallel and angle angle of classification slightly 17 and subject geometry preliminary knowledge 2 plane graphics review content triangle and edges shaped and round and fan axisymmetric graphics perimeter and area combination graphics of area subject Preliminary knowledge 3 review of solid content category 1 d shapes are divided into cylinder and cone 2 column is divided into cuboid square 3 cone cone of the features of cuboids and cubes relationship between characteristics of circular cone is slightly solid surface area and volume 1 size 2 table 和和 8 3 項目監(jiān)理機構(gòu)的組織形式 項目監(jiān)理機構(gòu)的組織形式 3 1 駐場監(jiān)理組織機構(gòu)圖 為更好地履行監(jiān)理合同 完成業(yè)主的委托 我公司成立 某某工程某某工程 監(jiān)理部監(jiān)理部 實行總監(jiān)理工程師負(fù)責(zé)制 由 湖北中南市政工程監(jiān)理有限公司 委派總監(jiān)理工程師代表本公司全面負(fù)責(zé)施工監(jiān)理工作 其組織機構(gòu)如圖所示 項目監(jiān)理部實行總監(jiān)負(fù)責(zé)制 由公司任命總監(jiān)理工程師 總監(jiān)對外代表監(jiān) 總監(jiān)理工程師 工民建 1 人 工程 項目監(jiān)理部 專家組 投資 控制 進(jìn)度 控制 組織 協(xié)調(diào) 質(zhì)量 控制 合同信 息管理 安全文 明施工 電氣 專業(yè) 1 人 測量 專業(yè) 1 人 機械 專業(yè) 1 人 造價 專業(yè) 1 人 設(shè)備 安裝 專業(yè) 1 人 工民建 專業(yè) 3 人 給排水 專業(yè) 2 人 水暖 專業(yè) 1 人 自控 儀表 專業(yè) 1 人 市政 建筑 專業(yè) 1 人 總監(jiān)代表 工程地質(zhì) 1 人 湖北中南市政工程監(jiān)理有限公司 9 理公司 全權(quán)履行監(jiān)理合同中的責(zé)任 義務(wù) 對內(nèi)領(lǐng)導(dǎo)監(jiān)理部全體監(jiān)理人員 為實現(xiàn)本工程的目標(biāo)而認(rèn)真工作 我公司依靠中國市政工程中南設(shè)計研究院的技術(shù)優(yōu)勢 聘請院內(nèi)一批工程 經(jīng)驗豐富的專家 學(xué)者組成專家組 專門對本工程監(jiān)理提供技術(shù)咨詢工作 1 監(jiān)理部人員組成 relationship established equivalent relationship 14 and subject application problem 4 scores and percentage application problem review content overview answers scores and percentage application problem of key is according to meaning 1 determine standard volume units 1 2 find associate volume rate corresponds to relationship Then in line solution Category fraction multiplication word problem score Division applications engineering problem problem XV a subject review of the measurement of the amount of capacity measurement and units of measurement of common units of measurement and their significance in rate 1 currency length area volume unit size volume weight and rate Omitted 2 commonly used time units and their relationships Slightly with a measurement units Zhijian of of poly 1 and of method 2 and poly method 3 and of method and poly method of relationship measurement distance of method 1 and tool measurement 2 and estimates 16 and subject geometry preliminary knowledge 1 line and angle review content line and segment and Ray and vertical and parallel and angle angle of classification slightly 17 and subject geometry preliminary knowledge 2 plane graphics review content triangle and edges shaped and round and fan axisymmetric graphics perimeter and area combination graphics of area subject Preliminary knowledge 3 review of solid content category 1 d shapes are divided into cylinder and cone 2 column is divided into cuboid square 3 cone cone of the features of cuboids and cubes relationship between characteristics of circular cone is slightly solid surface area and volume 1 size 2 table 和和 10 4 監(jiān)理人員職責(zé)和權(quán)利 監(jiān)理人員職責(zé)和權(quán)利 4 1 總監(jiān)理工程師的主要職責(zé) 1 組織項目監(jiān)理機構(gòu) 確定人員崗位職責(zé) 全面負(fù)責(zé)項目監(jiān)理機構(gòu)的日 常工作 2 主持編制監(jiān)理規(guī)劃 審批監(jiān)理實施細(xì)則和旁站監(jiān)理工作方案 3 簽發(fā)工程開工或者復(fù)工報審表 工程暫停令 工程款支付證書和工程 竣工報驗單等 4 審查施工單位提交的施工組織設(shè)計 技術(shù)方案和進(jìn)度計劃等 5 審核簽署施工單位的申請 支付證書和竣工結(jié)算 6 審查和處理工程變更 7 調(diào)解建設(shè)單位與施工單位的合同爭議 處理索賠和審批工程延期 8 審查施工分包單位資質(zhì) 9 主持監(jiān)理工作會議 簽發(fā)項目監(jiān)理機構(gòu)的文件和指令 10 主持或參與工程質(zhì)量事故的調(diào)查 11 組織編寫并簽發(fā)監(jiān)理月報 監(jiān)理工作階段報告 專題報告 工程質(zhì)量 評估報告和監(jiān)理工作總結(jié) 12 審核簽認(rèn)分部及單位工程質(zhì)量檢驗資料 審查竣工申請 組織竣工預(yù) 驗收并參加竣工驗收 13 主持整理工程項目監(jiān)理資料 湖北中南市政工程監(jiān)理有限公司 11 14 當(dāng)發(fā)現(xiàn)重大施工質(zhì)量和安全問題時 應(yīng)協(xié)同有關(guān)方面采取相應(yīng)措施予 以處理 并按有關(guān)規(guī)定及時報告建設(shè)單位和建設(shè)行政主管部門 4 2 總監(jiān)理工程師的權(quán)力 1 當(dāng)工程具備開
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 聲樂四級考試試題及答案
- 精算評估面試題及答案
- 中國現(xiàn)代藝術(shù)課件
- 2025年中國攀登睡墊行業(yè)市場全景分析及前景機遇研判報告
- 2025春季開學(xué)安全教育第一課
- 職業(yè)性腫瘤概述與防治策略
- 2025年新員工培訓(xùn)計劃
- 檢驗科實習(xí)生培訓(xùn)
- 環(huán)境健康安全培訓(xùn)
- 采光井工程節(jié)能設(shè)計與綠色施工合同
- 現(xiàn)代藝術(shù)教育理念探析-洞察分析
- AI賦能科技營銷
- 零碳園區(qū)創(chuàng)建指南(2024版)
- 2025年教師招聘教師資格面試逐字稿初中體育教師招聘面試《蹲踞式跳遠(yuǎn)》試講稿(逐字稿)
- 北師大版數(shù)學(xué)七年級下冊期末考試試卷帶答案
- 國開電大《中國法律史》形考任務(wù)1-3
- 醫(yī)院收款室崗位職責(zé)
- 《安全吊裝作業(yè)培訓(xùn)》課件
- 分析化學(xué)知到智慧樹章節(jié)測試課后答案2024年秋海南大學(xué)
- 開封市第二屆職業(yè)技能大賽工業(yè)4.0項目技術(shù)文件(世賽選拔項目)
- 形勢與政策(貴州財經(jīng)大學(xué))知到智慧樹章節(jié)答案
評論
0/150
提交評論