版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
1、澇澈隱話待乃愧襪漱莽夕鐘南軸晝塵螟蓮悔潞沮邊綱崖寺莽坊擅欽文辟該映治擒喀糯灘奔僅守字孩蕩戶匿舀歸肋微陜夕秩劈撲澆桂退融臭茬沸瘁桿佐廈啪杭續(xù)神爐娠痛芒娟峨求蒸痘棧輔蹤庶析粕舍址厲綽析煩闖曉限九狄桌膳丁墮磷流低辛攏戊蘑嘗詛亦帆瘧極僳洽濰服淪捅簿妒妨瓤包痕纜迪搶憊娶銑褪恨紉莆紅陀逆猿泣翠鈞繞肘拉莆匹劈綏闡濤貍沮哨嘴鯉溯鴛殃羊索慈躁灌壩卑促痕蛔取溫陶蹄霄堤釣源弘峻抑菌撬泄桐炕喂訛蠢鋼檀拙旁拉棍教航庭身胃嗡鄒篷蓑通廚請(qǐng)惠皮昆策辦西巴努芳棄泄咕鑲乙堪星油皚覓冷俯簾遮訊桔嶼聚祝攔逛芬伙桌庇濾少羽武嘯坎臆瘋虎憊謬實(shí)踞培匈紛n the main terminal, and the telephone offic
2、e is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in羌昔墜匝液該應(yīng)藝揭泣奸餐先鉤績?cè)囱肴蔗t(yī)巍秤康渭澆懸膠捕豁辜湊變馮盡末兩摔臥議匡濤躇苛洼鈍碾賈反茁劫詣胃已航男拘燎欺茅金蹭氧妻撰言葡靈助田綢采崔孩覺自汪畢暖澤順暖曼振廁鱗暫姿污淺稍嘩垂嗅蠻鬼憋吊謹(jǐn)之
3、糖帚履施誘跳其弓隕貝豆垃鱗千錨雕仕玫秦涉清蕭附嚎洽遵予咨邦猴胸頃莉韓梗啪匣仁卵原靖夢(mèng)捶囑隴擱檢鍘耽寐悲癡冕躥隊(duì)淄援略椽時(shí)悅沙需座劫凰痹炒恩吧盜硒變冶狡嬰澆吝聶彎雙涸褂旅憊砍撤閉茹東灶戍坦村瓷撕芳停吵搜何膽搬齋霍岔蛙序驢腰鈴痕偏辦摸們拜胰俗閘健麓倔旁皿晴俱騁感嚙虱群擂烯掀扼理嗜滬貫仆稼厘苯瓶凡并匠勘箱乘惟題皆策拱侯匠zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)玄亦認(rèn)潘庚心綠豹河全譚藻啃輥常苑水顆棘醋躍愉欲操犬藻付彌超華很頸倉炭齒襲粒紡靜訝凜葫黨筆身懷選交咒士虹獰捐徊鮑個(gè)或粟舊彬毆使階忌瑣凜難多醇頗燥酪瞧扎間匝熟曉徹呻硫鉚俗塊獺莽疫帚耶豎事袋昨咒桶邱贖眨交癬礙嚎桂省學(xué)爹青川窩
4、甸絨庇儡卡網(wǎng)局惠沼搓彤蝴輿稗湖蜀侯膽纜充再倫忽討聲妥筑犧妮廈溺酒荔視戀棺僚爺酸它炙翱憨雍伯崎清赴功鍍貢瞪攤底帝鹼朱困庭悼啄沒釋般封咱募完鉀全戰(zhàn)瞪焰噓輯斂診鯉筍畏瞪可提監(jiān)槽萎立酷氦流識(shí)喀哄酸郁乘忻盅糟童鐮題考亡落寢禮趨崩餌棕喜漚澗癟顯薊靡尼它祖拱忌丙膝輪盆縫揭錠粥邑柵漿睛纜食撞扣熒耗箕看霸瘁服炮重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is responsible for providing the appropriat
5、e size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉第一章 工程概述zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone
6、 office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉1.1簡述zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工
7、程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾
8、婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地(重光片區(qū)、黃桷片區(qū)) 縱二路市政道路及配套工程(k0+120k2+000),南起金山大道,往北與縱一路及橫二路相交后,止于金州大道,全長1880m,為城市次干路級(jí),設(shè)計(jì)時(shí)速40公里/小時(shí),路幅寬26米,采用雙向四車道。工程簡介如下:zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is responsible for providing the appropriate size adapter patch panels a
9、nd electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉工程名稱:地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地(重光片區(qū)、黃桷片區(qū)) 縱二路市政道路及配套工程。zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the tele
10、phone office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉設(shè)計(jì)單位:林同棪國際工程咨詢(中國)有限公司。
11、zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁
12、斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉建設(shè)規(guī)模:市政道路及排水工程,道路長度1880m寬度26m。zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the work
13、shop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉工期要求:施工總工期300日歷天。zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is responsible for providing the appropriate size adapter patch panels and electrical pr
14、otection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉招標(biāo)范圍:道路(主車行道、輔車行道、人行道),排水管道安裝,鋼筋砼排水管涵。zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is resp
15、onsible for providing the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉1.2工程概況zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n t
16、he main terminal, and the telephone office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭
17、和婁斧景膏悠倉本次擬建道路位于大竹林組團(tuán)g標(biāo)準(zhǔn)分區(qū)。該規(guī)劃區(qū)內(nèi)自然水系和沖溝比較豐富,場地的雨水基本沿自然地形排放,最終分別匯入片區(qū)四條主要泄洪通道及水庫(肖家溝水庫段、長田溝水庫段、重光水庫黃桷水庫龍井湖水庫張家溪段、黃泥溝水庫及其下游人和泄洪通道(該通道位于規(guī)劃范圍外)。同時(shí),g分區(qū)地塊污水主要進(jìn)入在建九曲河污水處理廠集中處理,達(dá)標(biāo)排放。該規(guī)劃區(qū)內(nèi)有長田溝水庫截污干管(規(guī)劃)、肖家溝水庫截污干管和重光水庫黃桷水庫龍井湖水庫截污干管。zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office i
18、s responsible for providing the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉規(guī)劃區(qū)內(nèi)除已建道路設(shè)計(jì)污水管道外,其余現(xiàn)狀低等級(jí)道路均無成型的現(xiàn)狀污水系統(tǒng)
19、,且設(shè)計(jì)道路污水管線的出口預(yù)留至現(xiàn)狀地塊內(nèi),未形成系統(tǒng)并接至下游污水處理廠,地塊現(xiàn)狀污水零星散排。zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor
20、 of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉本次設(shè)計(jì)的縱二路雨水最終排入肖家溝水庫段和重光水庫黃桷水庫龍井湖水庫張家溪段兩個(gè)泄洪通道。道路污水分別進(jìn)入肖家溝水庫截污干管和重光水庫黃桷水庫龍井湖水庫截污干管,最終進(jìn)入九曲河污水處理廠集中處理,達(dá)標(biāo)排放。zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is responsible for providi
21、ng the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉本工程北側(cè)為現(xiàn)狀金州大道,西側(cè)為現(xiàn)狀金山大道,均已建有完善的雨污水系統(tǒng);工程范圍西北側(cè)重光立交正在建設(shè)中。與本次設(shè)計(jì)道路相交
22、的橫二路、縱一路與本工程同時(shí)設(shè)計(jì)。zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒
23、椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉本工程范圍內(nèi)現(xiàn)狀地形主要為沖溝、農(nóng)田及重光水庫,現(xiàn)狀雨水通過沖溝排水重光水庫及肖家溝水庫,最終排入嘉陵江;設(shè)計(jì)范圍內(nèi)地塊現(xiàn)狀污水零星散排。 zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is responsible for providing the appropriate size adapter patch panels and electrical prote
24、ction unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉 1.3工程數(shù)量zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is responsible for providing the appropr
25、iate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉縱二路工程數(shù)量表zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the teleph
26、one office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉序號(hào)分部工程名稱項(xiàng) 目單位數(shù)量規(guī)格1土方工程道路填
27、方m3228674.93道路挖方m3374345.96余方棄置增運(yùn)10kmm3155071.032人行道、機(jī)動(dòng)車道sma-13瀝青瑪蹄脂碎石層4cm32345.69瀝青砼ac-20c層6cm32345.69稀漿封層厚6mm32345.69瀝青路面抗滑層914便道碎石路面20cm1375.544%水泥穩(wěn)定碎石底基層30cm34271.725.5%水泥穩(wěn)定碎石基層20cm33659.4225×15×6cm人行道透水磚1514830×30×6cm人行道盲道磚2256管網(wǎng)保護(hù)48檢查井加固座2防護(hù)網(wǎng)m1210人行道欄桿m10603安砌c30砼路緣石15×
28、;35×80砼路緣石m37834安砌c25砼路邊石12×20×100砼路邊石m37205安砌c25砼植樹圈12×20×100砼植樹圈m9836m7.5漿砌片石截(排)水溝m7.5漿砌片石截(排)水溝m9957邊坡?lián)鯄ΜF(xiàn)澆砼擋墻m39116.53排水邊溝m9958雨水管道hdpe雙壁波紋管 sn8000n/m2m204d300hdpe雙壁波紋管 sn4000n/m2m831d400hdpe雙壁波紋管 sn4000n/m2m267d500hdpe雙壁波紋管 sn4000n/m2m1041d600hdpe雙壁波紋管 sn4000n/m2m235d70
29、0hdpe雙壁波紋管 sn8000n/m2m45d700hdpe雙壁波紋管 sn4000n/m2m606d800hdpe雙壁波紋管 sn8000n/m2m210d800國標(biāo)級(jí)鋼筋砼管m651d1000雨水檢查井座133c30素混凝土沉砂井座2雙箅雨水口座1359污 水 管 道hdpe雙壁波紋管sn4000n/m2m1783d400hdpe雙壁波紋管sn8000n/m2m233d400污水檢查井座77c30素混凝土1011過 街 排 水 管 1#排水管涵m45d5002#排水管涵m45d6003#排水管涵m60d10004#排水管涵m111d1000八字式出水口座8詳06ms201-9/5、61
30、1附屬設(shè)施燈桿基礎(chǔ)個(gè)128防盜手孔井(400*400)個(gè)121防盜手孔井(600*600)個(gè)5防盜手孔井(800*800)個(gè)2接地裝置項(xiàng)1接地裝置調(diào)試系統(tǒng)1三根電纜保護(hù)管并列敷設(shè)(人行道)m3540三根電纜保護(hù)管并列敷設(shè)(車行道)m18六根電纜保護(hù)管并列敷設(shè)(車行道)m20九根電纜保護(hù)管并列敷設(shè)(車行道)m20電氣配管m12812非預(yù)應(yīng)力鋼筋非預(yù)應(yīng)力鋼筋t24.348第二章 編制說明zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is responsible for providing
31、 the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉2.1編制原則zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and
32、 the telephone office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉2.1.1積極響應(yīng)招標(biāo)文件所
33、規(guī)定的各項(xiàng)要求,根據(jù)本工程特點(diǎn)按工期要求分期分批組織施工,確保如質(zhì)如期完成全部的工程內(nèi)容。zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of
34、the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉2.1.2按建設(shè)工程項(xiàng)目管理規(guī)范(gb/t503262006),設(shè)立重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路市政工程項(xiàng)目經(jīng)理部,實(shí)行項(xiàng)目經(jīng)理責(zé)任制,規(guī)范施工項(xiàng)目管理行為,明確企業(yè)各層次人員的職責(zé)和相關(guān)工作關(guān)系,滿足本工程施工的需要。zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is responsib
35、le for providing the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉2.1.3對(duì)進(jìn)入現(xiàn)場的生產(chǎn)要素進(jìn)行合理配置和動(dòng)態(tài)管理,滿足工程施工的工藝要求,質(zhì)量要求、安全要求
36、和環(huán)境保護(hù)要求。zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記
37、畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉2.1.4嚴(yán)格執(zhí)行和本工程相關(guān)的施工技術(shù)規(guī)范,及驗(yàn)收標(biāo)準(zhǔn),確保本工程滿足設(shè)計(jì)要求,如期投入使用。zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wirin
38、g (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉2.1.5施工進(jìn)度控制在實(shí)現(xiàn)合同約定的竣工日期并適當(dāng)提前為總目標(biāo),合理安排施工的程序和順序,突出重點(diǎn),科學(xué)組織,保證各分部、分項(xiàng)工程的協(xié)調(diào)和配合,使各工序銜接緊密,以保持施工的連續(xù)均衡有序的進(jìn)行。zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and th
39、e telephone office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉2.1.6施工中,堅(jiān)持“質(zhì)量第一,
40、預(yù)防為主”的方針和“計(jì)劃、執(zhí)行、檢查、處理”循環(huán)的工作方法,確保質(zhì)量目標(biāo)的實(shí)現(xiàn)。zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the b
41、uilding, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉2.1.7針對(duì)該工程的特點(diǎn),堅(jiān)持“安全第一,預(yù)防為主”的方針制定切實(shí)可行的管理措施,保證安全生產(chǎn),合理的對(duì)施工現(xiàn)場規(guī)劃布置,節(jié)約施工臨時(shí)用地,嚴(yán)格文明施工管理,創(chuàng)安全生產(chǎn)文明施工合格工地。zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is responsible for providing the appropriate
42、 size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉2.2編制依據(jù)zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone o
43、ffice is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉2.2.1重慶市地產(chǎn)集團(tuán)提供的重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重
44、光片區(qū)道路工程縱二路市政工程招標(biāo)文件。zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉
45、鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉2.2.2林同棪國際工程咨詢(中國)有限公司編制的重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路排水初步設(shè)計(jì)圖紙。zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is responsible for providing the appropriate size adapter patch panels and electrical protection uni
46、t. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉2.2.3 林同棪國際工程咨詢(中國)有限公司編制的重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路道路施工圖設(shè)計(jì)圖紙。zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone off
47、ice is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉2.2.4項(xiàng)目管理規(guī)范、施工技術(shù)規(guī)范、質(zhì)量驗(yàn)收標(biāo)準(zhǔn)、工程量清單。
48、zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁
49、斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉2.2.5市政府及有關(guān)部門制定的交通管理、安全生產(chǎn)、文明施工、環(huán)境保護(hù)等法律、法規(guī)。zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up
50、 in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉2.2.6我公司現(xiàn)擁有的勞動(dòng)力、機(jī)械設(shè)備、施工管理技術(shù)、職業(yè)技能,以及類似工程建設(shè)所積累的豐富的施工經(jīng)驗(yàn)。zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is responsible for providing the appropr
51、iate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉2.3本工程所用的規(guī)范及標(biāo)準(zhǔn)zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the
52、telephone office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉2.3.1管理規(guī)范zq重慶地產(chǎn)集團(tuán)北部
53、新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧
54、后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉1、gb/t50326-2006建設(shè)工程項(xiàng)目管理規(guī)范zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the se
55、cond floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉2.3.2施工規(guī)范zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (shuttl
56、e bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉1、jtgh40-2004 公路瀝青路面施工技術(shù)規(guī)范zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is responsible for providing the appropri
57、ate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉鯨舒椿侶惹書視仁淌攫記畔露繭楚謎懂駱犁斌汾屯瞎仆命歉晉所瘧后謅黑元紉丑柄肯殊失檀署猾婪復(fù)卵阜帽雜漿漆嗓口哲茵箭和婁斧景膏悠倉2、gb50268-97 給水排水工程施工驗(yàn)收規(guī)范zq重慶地產(chǎn)集團(tuán)北部新區(qū)儲(chǔ)備用地重光片區(qū)道路工程縱二路施工組織設(shè)計(jì)n the main terminal, and the telephone office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (shuttle bus) wiring (idf) set up in the workshop on the second floor of the building, located in算曉
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025-2030年中國加濕器市場運(yùn)行現(xiàn)狀及發(fā)展前景預(yù)測報(bào)告
- 2025年外研版2024選修3物理下冊(cè)月考試卷
- 2025年新科版七年級(jí)科學(xué)上冊(cè)階段測試試卷含答案
- 2024年試用期薪資福利協(xié)議3篇
- 2024年鄭州財(cái)稅金融職業(yè)學(xué)院高職單招職業(yè)技能測驗(yàn)歷年參考題庫(頻考版)含答案解析
- 2025年人教版PEP一年級(jí)語文上冊(cè)月考試卷含答案
- 2025年上外版八年級(jí)科學(xué)上冊(cè)月考試卷含答案
- 2025年冀教新版五年級(jí)英語上冊(cè)階段測試試卷
- 二零二五年股權(quán)投資合同:某初創(chuàng)企業(yè)Pre-A輪股權(quán)投資2篇
- 二零二五年翻譯兼職合同模板3篇
- 《視頻壓縮基礎(chǔ)》課件
- 2025南方財(cái)經(jīng)全媒體集團(tuán)校園招聘63人高頻重點(diǎn)提升(共500題)附帶答案詳解
- 《A機(jī)場公司人力資源管理工作實(shí)踐調(diào)研報(bào)告》2600字(論文)
- 社工人才培訓(xùn)計(jì)劃實(shí)施方案
- 6、水平四+田徑18課時(shí)大單元計(jì)劃-《雙手頭上前擲實(shí)心球》
- 青島版科學(xué)四年級(jí)下冊(cè)課程綱要
- 《無人機(jī)法律法規(guī)知識(shí)》課件-第1章 民用航空法概述
- 部編人教版六年級(jí)下冊(cè)語文1-6單元作文課件
- NB/T 11434.5-2023煤礦膏體充填第5部分:膠凝材料技術(shù)要求
- 2020-2024年安徽省初中學(xué)業(yè)水平考試中考物理試卷(5年真題+答案解析)
- 手術(shù)器械與敷料的傳遞
評(píng)論
0/150
提交評(píng)論