下載本文檔
版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、for upto 4 units in parallel , this is exactly like say 2 or 3 units in paralle1. say for 4 x 480 kva configurations 一 you will need:dp3480e - 4 unitsparallel card for dp3480e - 4 units (1 sitting inside each unit) mccb box - 4 units (1 for each ups)service bypass for 4 x dp3480e - 1 unit (specify r
2、edundant n+1 or full power i. c. whether load is 480 x 3 kva or 480 x 4 kva) electronic static switch - built in every unit (no need to add deperately)the diagram wi 11 be exactly same as for 2 or 3 x dp3480e or 4 x dp3480e.for more than 4 units, we shall need an external static switch - so the thin
3、gs will change to:say for 6 x 480 kvadp3480e - 6 unitsparallel card for dp3480e - 6 units (1 sitting inside each unit) mccb box - 6 units (1 for each ups)service bypass for 6 x dp3480e - 1 unit (specify redundant n+1 or full power i. c. whether load is 5 x 480 kva only or 6 x 480 kva - in example be
4、low it is 5 x 480 kva)electronic static switch 一 external to be capable of handling full power of load (say 6 x 480 kva for full power or 5 x 480 kva for redundancy 一 in example below it is 5 x 480)this diagram will look something like:in this option, the load is 5 x 480kva = 2,400 kva, which can be
5、 handled by 5 ups modules. the 6th module is parallel operating and sharing the load in redundant operation.normally on full load operation, each of the 6 ups active modules is running at 5/6lh i.e. about 85% load only.an external static switch is used to handle any overloads outside the rating of o
6、nline operation or failure of more than 1 module the static switch is rated for 5 x 480 kva load.a single line drawing is attached below to give an impression of the arrangement.parallel operation of dp300esambhaji wagh apc, singaporein dp300e systems parallel operation works as followswe can connec
7、t upto nine units of same capacity in parallel to achieve redundancy or increased load capacity in ups system. the configuration will look as followswe have supplied this kind of solution to ibm uk where they have two banks of six units of dp300e in parallel to support their megacenter.parallel oper
8、ation is used with the above shown configuration and works as followsthese parallel units are connected to service bypass panel to make it easy to combine the ups power and distribute it to the load all units get the input through input switches from sbp (service bypass panel) and output of all unit
9、s will be combined on sbp through individual output switches. this makes it easy to service and maintain the units and increase the reliability of operation.up to four units can be connected in parallel without any additional external static switch. if the configuration demands more than four unit t
10、o be connected in parallel then this configuration uses external static switch for bypass, which is also connected to sbp through switches. for more than four systems the external static switch is used to avoid the imbalance of current on all parallel ups static switches, because of the different le
11、ngths of input and output cables, during the bypass operation of upsin order to work in parallel and share the load all units are installed with parallel operation board inbuilt in a system. this board insures that all units work in synchronization and share the load current equallytherefore 9 units
12、 of dp3480e in parallel can support 4320kva of total load with each unit carrying the equal current.the configuration of connecting all units in parallel has advantages of high power availability, overload capacity, redundancy in case of load less than full load capacity of 8 units and high reliabil
13、ity as no additional equipment required at the output.sbp is a unit which has only power switches and sense contacts and does not include any electronic components and hence very reliable and makes it easy to maintain and repair the units in futurein order to connect all units in parallel, a paralle
14、l cable is connected between all units and this parallel cable also has redundancy (i.e. uses two parallel cables) in order to increase the reliability of parallel operation. parallel board ensures that all units run in synchronization to keep the same output frequency and phase, it also senses the
15、output current for all units and make it equal on all systems. in parallel operation system also continuously checks how many units are cuitently active and sharing the load and display it on front panel fr. ex. 3/3 (i.e. 3 of 3, all three of parallel systems are on) or 2/3 (i.e. two of three parall
16、el systems are working and one is off). by measuring the total load and checking the number of active system it display on front panel whether the system is operating in parallel or parallel redundant mode.all parallel board signals are electrically isolated from ups control circuit and hence there will not be possibility of causing any failure in other units if one of unit fails. many other manufacturers use parallel board where there is no isolat
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 二零二五年度職工住房借款與社區(qū)養(yǎng)老配套服務(wù)協(xié)議3篇
- 二零二五年度吊裝工程安全評(píng)估與監(jiān)督管理合同2篇
- 2025年辦公家具回收利用與環(huán)保處理合同3篇
- 極簡(jiǎn)市場(chǎng)營(yíng)銷(杰瑞20231224)
- 二零二五年度花椒采摘與旅游融合發(fā)展合同3篇
- 2024年陽(yáng)泉煤業(yè)(集團(tuán))有限責(zé)任公司總醫(yī)院三礦醫(yī)院高層次衛(wèi)技人才招聘筆試歷年參考題庫(kù)頻考點(diǎn)附帶答案
- 2024年河南水利與環(huán)境職業(yè)學(xué)院高職單招數(shù)學(xué)歷年參考題庫(kù)含答案解析
- 2024年河北機(jī)電職業(yè)技術(shù)學(xué)院高職單招職業(yè)適應(yīng)性測(cè)試歷年參考題庫(kù)含答案解析
- 二零二五年度美食街?jǐn)偽蛔赓U及廣告投放合同3篇
- 2024年江蘇財(cái)經(jīng)職業(yè)技術(shù)學(xué)院高職單招職業(yè)適應(yīng)性測(cè)試歷年參考題庫(kù)含答案解析
- 2024年石家莊正定國(guó)際機(jī)場(chǎng)改擴(kuò)建工程合同
- 2025年度愛(ài)讀書(shū)學(xué)長(zhǎng)定制化閱讀計(jì)劃合同2篇
- 河南省信陽(yáng)市浉河區(qū)9校聯(lián)考2024-2025學(xué)年八年級(jí)上學(xué)期12月月考地理試題(含答案)
- 快速康復(fù)在骨科護(hù)理中的應(yīng)用
- 國(guó)民經(jīng)濟(jì)行業(yè)分類和代碼表(電子版)
- ICU患者外出檢查的護(hù)理
- 公司收購(gòu)設(shè)備合同范例
- 廣東省潮州市2023-2024學(xué)年高二上學(xué)期語(yǔ)文期末考試試卷(含答案)
- 2024年光伏發(fā)電項(xiàng)目EPC總包合同
- 試卷(完整版)python考試復(fù)習(xí)題庫(kù)復(fù)習(xí)知識(shí)點(diǎn)試卷試題
- GB/T 44679-2024叉車禁用與報(bào)廢技術(shù)規(guī)范
評(píng)論
0/150
提交評(píng)論