1、地磚花崗巖地面施工方案完整(完整版資料,可直接使用可編輯,推薦下載)地面磚、花崗巖鋪貼施工方案Construction Scheme of Floor tile andGranite tile Installation一、準備工作 Preparations1。彈水平線,確定室內(nèi)地磚完成面士 0.00標高。The horiz on tal li ne, make sure in door floor tile fin ish surface elevati on of + /-0.00.2. 水電管線已安裝完畢。Water and electricity line already deploye

2、d二、準備材料 Preparation of materials1. 425水泥及中砂,白水泥.425 ceme nt and medium sand and white ceme nt.2。800 興 800* 25 花崗巖,600*600* 25 花崗巖,600* 600* 12 地磚。800 * 800 * 25 granite, 600 * 600 * 25 granite,600 * 600* 12 floor tile.二、施工方法:con structi on procedure1、工藝流程 construction process材料準備t彈樓地面面層標高控制線t基層處理t彈線

3、找 中找方t鋪貼基準控制標筋t鋪貼面層t鋪貼踢腳板t養(yǎng) 護與成品保護Prepare materials Bomb the ground floor surface elevati on con trol li net Base treatmenTBomb lineT Lay up thebe nchmark con trol sta ndard screed lay up surface course Lay upthe baseboard Maintenance and protecti on for the final product2、鋪貼順序:Tile in stallation or

4、der(1) 、大面積施工時,應用分段順序鋪貼。Large area con structionsegme nted order pav ing(2) 、對于整個樓層,要先鋪貼獨立房間,再鋪貼通道或走廊.For the en tire buildi ng, first tile separate rooms the n passgeways or corridors.(3) 、對于一般房間采用退步法先由房間中部向兩側(cè)鋪貼.對于有獨立柱的大廳,要先鋪貼柱間部分,然后再向兩邊展開.For General rooms,use regression method by laying up from t

5、he central to both sides. For the great hall with independent column, first tile colu mn secti on, the n expa nd to both sides(4) 、所有房間先鋪貼整塊板材,非整塊板材最后鋪貼。地面鋪 貼完后再鋪貼踢腳板。All the roomsfirstly paved with block plate , or tile at last。Skirt ing board tiledafter the gro und.3、鋪貼方法:Tile in stallation method

6、(1)、以提前做好的標筋為基準,首排板材兩邊掛線,首排鋪貼好后可單邊掛線Baseed on markingscreed made befor,e the first row plate hang line on both sides ,afterthe first raw is tiled ,it can be hang line on one side.(3) 、結(jié)合層與板材面層應分段同時鋪砌。先進行試鋪,將干硬 性水泥砂漿攤鋪到鋪貼部位刮平 , 其厚度要適宜,然后將板材平 鋪到干硬性水泥砂漿上 (干硬程度以手捏成團 , 落地即散為宜), 用橡皮錘用力敲擊板面, 使攤鋪的干硬性水泥砂漿結(jié)合層

7、密實, 并且使板材表面低于地面標高控制線 25mm。Combined course andplate surface course should be tiled at the same time. First trial laying,flatthe rigid cement mortar to the paving part, and its thicknessshould be appropriated. Then tile theplank to dry, rigid cement morta(Advisabledegree of dry is can be kneaded toget

8、her,and scattered when dropped on land ) . Use a rubber mallet hardstrike the board to make the paving dry rigidcement mortar layercombination is closegrained, and make the surface2 5 mmbelow the ground elevation control sheet.(4)、試鋪合適后,將板材揭起 , 在密實的干硬性水泥砂漿結(jié)合 層上撒布一層干水泥面并用噴壺淋水一遍,或澆一層水泥漿作 粘結(jié),然后將板材再原位置再

9、次安放 .After appropriate trial paving , lift up the plate.Spread a layer of dry cement to the dry, rigid close grained cement morta, and wet it once by the wateri ng can or watera layer of ceme nt paste for mud bonding, the n put the plate back at the position再次安放時,板材四角要同時下落,放穩(wěn)后用橡皮錘敲擊板面 使其平整并與結(jié)合層能緊密年粘

10、接牢固,板材表面與地面標高 控制線吻合便完成一塊板材鋪貼,再依次鋪貼下一塊。When placed again four corners of the pla nk should be dropped at the same times After layed dow n steadily ,use a rubber hammer to strike itto make it flat and bonded firmlywith the combined course .The plank pav ing is done whe n the pla nk surfaceis coin cide

11、d with the elevati on of the ground con tro, the n pave the n ext one。鋪貼時要隨時找平找直,做到四角平整,縱橫縫隙對齊。When paving , be sure that it is flat and straight Make sure the four corners flat, and vertical and horizontal crack aligned.三、質(zhì)量要求 Quality requirements1 大理石,花崗石 Marble, granite1.1 主控項目 Dominant item(1)面層

12、與下一層應結(jié)合牢固無空鼓.Surface course should be combined firmly with the next one , without any gap&(2) 四角平整,縱橫縫隙對齊、無色差.Four corners flat, vertical and horizontal crack aligned,colorlessdiffere nee.1。2 一般項目 Ge neral item(1)大理石,花崗石面層的表面應潔凈 , 平整,無磨痕,且應圖 案清晰,色澤一致,接縫均勻,周邊順直,鑲嵌正確 , 板塊無 裂、掉角、缺棱等缺陷。The surface of Ma

13、rble and granite should be clean,fla,t no grinding mark, andclear pattern,consistent color,juncture uniform, straight surrounding, right Mosaic,plates without broken corners, no crack defects such as lack of edges.(2)踢腳線表面潔凈 , 高度一致,結(jié)合牢固,出墻厚度一致。The surface of the baseboard should be clean,andconsiste

14、nt in height, firmly combined , and with consistent wall thickness。(3 )樓梯踏步和臺階板塊的縫隙寬度應一致,齒角整齊,樓層 階段相鄰踏步,高度差不應大于 10mm。The stair treadand step plate should be consistent ingap wid,th and tidy tooth angles. The floor stage should be adjacent tothe tread, ang the height differe nee should be no more tha

15、 n 10 mm(4 )大理石和花崗石面層的允許偏差應符合 :The deviation of marble and granite surfaee layer should be allowed to meet:、表面平整度:1.2mm、縫格平直:1.2mm。接縫高低差:0.8mm。踢腳線上口平直:1.2mm。板塊間隙寬度:1.2mmSurface evenness 1。2mmSeam case straight:1.2mrJuncture height differeneeSkirting line flat side:1。2mm Plate gap width: 1。 2mm2、地面磚

16、Floor tile2。1 主控項目:Domi nant item(1) 面層與下一層的結(jié)合(粘結(jié))應牢固,無空鼓.Surface course should be combined firmly with the next one,without any gaps.(2 )四角平整,縱橫縫隙對齊,無色差。Four corners flat, vertical and horizontal crack aligned, colorlessdiffere nee。2.2 一般項目:Ge neral item(1)磚面層的表面應潔凈,圖案清晰,色澤一致,接縫平整,深淺一 致,周邊順直,板塊無裂紋,

17、掉角和缺損等缺陷。The surface of brick layer should be clean,flat, no grinding mark, and clear patter n , con siste nt color,j un cture uni form straight surro unding, right Mosaic,plates without broke n cor ners, no crack defects such as lack of edges(2) 面層鄰接處的鑲邊用料及尺寸應符合設計要求,邊角整齊, 光滑。The edge materials and

18、dime nsions of surface course adjace nt side should meet the design requirement, with tidy corners and smooth。(3) 地板磚間隙寬度:1.2以內(nèi)伽。Floor brick gap width : less than 1 2 mm.(4) 踢腳線表面應潔凈,高度一致,結(jié)合牢固,離墻厚度一致。The surface of the baseboard should be clean, andconsistent inheight, firmly combined ,and with cons

19、istent wall thickness.(5) 面層表面的坡度應符合設計要求,不倒流水,無積水,與 地漏,管道結(jié)合處應嚴密牢固無滲漏。The slope of surface courseshouldmeet the design requirement on inverse flow, no no stagnant wate。 The junction with floor drain , and pipe should be closely solid with no leakage五、成品保護 Maintenance and protection for the final prod

20、uct1。鋪好的地面3天后方可上人。The paved ground can be Ian ded 3 days later2。新鋪的房間應臨時進行封閉,操作人員和檢查人員進入房間踩 踏時,要輕踏在一塊木板上。The new paved room should be closed temporarily,whe n operators and inspectors enter rooms please step on a piece of wood lightly.3。地面完工后,房間應封閉,粘貼完達到強度后,其他工種插入作 業(yè)時,應在表面加筑澆板保護.墻角門窗口處應加木板防護以防碰 撞。Wh

21、en the ground is finished, the room should be closed After thepaste reachesthe strength other kinds of workers join to the work,it needs to build slab column for protection.Door and windows in the corner should add wood for protecti on in case of collisi on。地面地磚施工工藝及技術(shù)組織措施(1 )操作程序基層處理R地磚鑲貼J質(zhì)量驗收(2)操作

22、要點1 )施工準備A、基層處理:鋪貼地面地磚,通常是在混凝土樓面或地 面上施工。對地基層表面進行清理,表面殘留的砂漿、塵 土和油漬等應用鋼絲刷刷洗干凈,并用水沖洗地面.B、將面磚濕潤備用:浸水后的瓷磚片應陰干備用,陰干 的時間視表面有潮濕感、但手按無水跡為準。C、彈線、分格、定位:彈線時,以房間中心點為中心, 彈郵相互垂直的兩條定位線。在定位線上按瓷磚尺寸進行 分格,如整個房間可排偶數(shù)塊瓷磚,則中心線就是地磚的接 縫;如排奇數(shù)塊,則中心線在地心位置上,分格、定位時, 應距墻邊留出200 300mm作為調(diào)整區(qū)間。另 外應注意,若 房間內(nèi)外的鋪地材料不同,其交接線應設在門板下的中間 位置。同時,地

23、面鋪貼的收邊位置不應在門口處,也就是說 不要使門口處出現(xiàn)不完整的瓷磚塊.地面鋪貼的收邊位置 應安排在不顯眼的墻邊。D、預排:地磚鑲貼前應預排。預排要注意同一墻面的橫 豎排列,均不得膽一行以上的非整磚。非整磚行應排在次 要部位或陰角處,其方法是:對有間隔縫的鋪貼,用間隔縫 的寬度來調(diào)整。對縫鋪貼瓷磚,主要靠次要部位的寬度來調(diào) 整。2)地面磚鑲貼:A、用尼龍線棉線繩在墻面標高點上拉出地面標高線,以 及垂直交叉的定位線。B、按定位線的位置鋪貼瓷磚。用陶瓷面用粘合劑攤在瓷 磚背面上,再 將地磚與地面鋪貼,并用 橡皮敲擊瓷磚面,使 其與地面壓實,并使線高度與地面標高線吻合。鋪貼8塊以 上時應用水平尺檢查

24、平整度,對 高的 部分用 橡皮錘敲平, 低 的部分應起出 地用水泥漿墊高。地 磚的鋪貼程序, 對于小房 間來說(面積小于4 0平方米),通常是做T字型標準高度 面. 對于房間面積較大時, 通常按房間中心十字型做出 標準 高度面, 這樣, 可便于多人同時施工.C、鋪貼大面:鋪貼大面是以鋪好的標準高 度面為標基進 地施工,鋪 貼時緊靠已鋪好的標準高 度面開始施工, 并用拉 出 的 對縫平直線來控制瓷磚對縫的 平直. 水泥砂漿應飽滿 地抹于瓷磚背面, 并用 橡皮錘敲實 , 以 防止空鼓現(xiàn)象. 并且 一邊鋪貼一邊用 水平尺檢查校正。 并即刻擦去表面的 水泥 漿。老 大需做泛水的表面, 鋪貼時按圖紙設計

25、做出泛水坡度. 整幅地面鋪貼完畢, 養(yǎng)護幾天后,再進行抹縫施工。抹縫時, 將白水泥調(diào)成干性團, 在縫隙上擦抹, 使地磚的 對縫內(nèi)填 滿白水泥, 再將瓷磚表面擦凈。(3 )質(zhì)量保證措施及要求1)材料面層相鄰兩塊料間的高差,缺磚不應超過1 . 5 m m。2)各層厚度對設計厚度的偏差, 公允許個別地方存在, 但不得超過該層厚度的 10%。3)塊料行列(縫隙)對直線的偏差,在1 0 m m長度內(nèi)的 允 許 值 鋪 地 磚 不 得 超 過 8mm。4 )地面各層(面層、墊層)的表面是否平整,應用2mm直 尺在各個方向加以檢查, 如為斜面時, 則應用水平尺和樣 尺檢查。5)地面各層表面對水平面或?qū)υO計坡

26、度的允許偏差, 不 應大于房間相應尺寸的0 . 2 %,但最大偏差不應大于3 0 m m。要求表面潔凈,圖案清晰,色澤一致,接縫隙均勻, 周邊順直, 板塊無裂紋、 掉角和缺楞等現(xiàn)象。1、適用范圍本方案適用于陜西師范大學新校區(qū)圖書館工程室內(nèi)地磚施工。2、施工準備2。 1 材料及主要機具:2。1。1 水泥: 硅酸鹽水泥、普通硅酸鹽水泥;其標號不應低于 425號,并嚴禁 混用不同品種、不同標號的水泥 .2。1。2砂:中砂或粗砂,過8mmfL徑篩子,其含泥量不應大于3%2。 1.3 地磚應有出廠合格證,抗壓、抗折及規(guī)格品種均符合設計要求,外觀顏 色一致、表面平整、邊角整齊、無翹曲及竄角。2。 1。 4

27、 草酸、火堿、建筑膠等均有出廠合格證。2。 1.5 主要機具 : 小水桶、半截大桶、笤帚、平鍬、鐵抹子、大木杠、小木杠、 篩子、手推車、鋼絲刷、噴壺、錘子、橡皮錘子、鑿子、方尺、粉線包、切割 機。2。 2 作業(yè)條件:2。2。1內(nèi)墻+50cm水平標高線已彈好,并校核無誤。2。2.2 墻面抹灰、門框已安裝完。 地面墊層以及預埋在地面內(nèi)各種管線已做完。穿過樓面的堅管已安完,管洞已 堵塞密實 . 有地漏的房間應找好泛水。2.2 。 4 提前做好選磚的工作,預先用木條釘方框(按磚的規(guī)格尺寸)模子 , 拆 包后塊塊進行套選、長、寬、厚不得超過土 lmm,平整度用直尺檢查,不得超過 0.5mm外觀有裂縫、掉

28、角和表面上有缺陷的板剔出,并按花型、顏色挑選后 分別堆放。2.2。5在施工前應繪制施工大樣圖進行排版,并做出樣板間 ,經(jīng)檢查合格后 , 方 可大面積施工。3、操作工藝3.1 工藝流程:勾縫、擦縫f養(yǎng)護踢腳板安裝找標咼、彈線f抹找平層砂漿鋪磚3。1。1基層處理:將混凝土基層上的雜物清理掉,并用鏨子剔掉砂漿落地灰, 用鋼絲刷刷凈浮漿層。如基層有油污時,應用 10%火堿水刷凈,并用清水及時 將其上的堿液沖凈。3.1。2找標高、彈線:根據(jù)墻上的+50cm水平標高線,往下量測出面層標高, 并彈在墻上.抹找平層砂漿:。1灑水濕潤:在清理好的基層上,用噴壺將地面基層均勻灑水一遍。3.1。3.2抹灰餅和標筋:

29、從已彈好的面層水平線下量至找平層上皮的標高(面層標高減去磚厚及粘結(jié)層的厚度),抹灰餅間距1.5m,灰餅上平就是水泥 砂漿找平層的標高,然后從房間一側(cè)開始抹標筋(又叫沖筋)。有地漏的房間, 應由四周向地漏方向放射形抹標筋,并找好坡度。抹灰餅和標筋應使用干硬性砂 漿,厚度不宜小于2cm.3.1。3。3裝檔(即在標筋間裝鋪水泥砂漿):清凈抹標筋的剩余漿渣,涂刷一 遍水泥漿(水灰比為0。40.5)粘結(jié)層,要隨涂刷隨鋪砂漿。然后根據(jù)標筋的 標高,用小平鍬或木抹子將已拌合的水泥砂漿(配合比為1 : 31 : 4)鋪裝在標 筋之間,用木抹子攤平、拍實,小木杠刮平,再用木抹子搓平,使其鋪設的砂 漿與標筋找平,

30、并用大木杠橫豎檢查其平整度,同時檢查其標高和泛水坡度是否正確,24h后澆水養(yǎng)護。3。1.4彈鋪磚控制線:當找平層砂漿抗壓強度達到1.2MPa時,開始上人彈磚的控制線.預先根據(jù)設計要求和磚板塊規(guī)格尺寸,確定板塊鋪砌的縫隙寬度,縫隙寬度控制在5mm左右。在房間分中、從縱、橫兩個方向排尺寸,當尺寸不足 整磚倍數(shù)時,將非整磚用于邊角處,橫向平行于門口的第一排應為整磚,將非 整磚排在靠墻位置,縱向(垂直門口)應在房間內(nèi)分中,非整磚對稱排放在兩墻邊 處。根據(jù)已確定的磚數(shù)和縫寬,在地面上彈縱、橫控制線(每隔 4 塊磚彈一根 控制線).3。1。5鋪磚:為了找好位置和標高,應從門口開始,縱向先鋪 23行磚,以

31、此為標筋拉縱橫水平標高線 , 輔時應從里向外退著操作 ,人不得踏在剛鋪好的磚 面上,每塊磚應跟線,操作程序是:3。 1 。 5.1 鋪砌前將磚板塊放入半截水桶中浸水濕潤 , 晾干后表面無明水時, 方 可使用。.2 找平層上灑水濕潤 , 均勻涂刷素水泥漿 (水灰比為 0。 40.5),涂刷面積不要 過大, 鋪多少刷多少。3結(jié)合層的厚度:采用水泥砂漿鋪設,厚度為 10mm左右3。結(jié)合層組合材料拌合:水泥砂漿結(jié)合層配合比為1 : 2。5(水泥: 砂)干硬性砂漿 . 亦應隨拌隨用,初凝前用完,防止影響粘結(jié)質(zhì)量。 5 鋪砌時,磚的背面朝上抹粘結(jié)砂漿 , 鋪砌到已刷好的水泥漿找平層上,磚上 楞略高出水平標

32、高線,找正、找直、找方后,磚上面墊木板,用橡皮錘拍實, 順序從內(nèi)退著往外鋪砌,做到加磚砂漿飽滿、相接緊密、堅實, 與地漏相接處,用砂輪鋸將磚加工成與地漏相吻合 . 鋪地磚時最好一次鋪一間 , 大面積施工時, 應采取分段、分部位鋪砌。3。 1.5.6 撥縫、修整:鋪完 2至 3行,應隨時拉線檢查縫格的平直度,如超出 規(guī)定應立即修整,將縫撥直,并用橡皮錘拍實。此項工作應在結(jié)合層凝結(jié)之前 完成。3.1。6勾縫:面層鋪貼應在24h內(nèi)進行勾縫、勾縫用1 : 1水泥細砂漿勾縫,縫 內(nèi)深度宜為磚厚的 1/3, 要求縫內(nèi)砂漿密實、平整、光滑。隨勾隨將剩余水泥砂 漿清走、擦凈。3。1。7養(yǎng)護:鋪完磚24h后,灑

33、水養(yǎng)護,時間不應少于 7d。 鑲貼踢腳板:踢腳板用磚 , 與地面塊材相同,踢腳板的立縫應與地面縫對齊,鋪 設時應在房間墻面兩端頭陰角處各鑲貼一塊磚,出墻厚度為8mm高度120 mm以此磚上楞為標準掛線,開始鋪貼,磚背面朝上抹粘結(jié)砂漿(配合比為1 : 2水泥砂漿),使砂漿粘滿整塊磚為宜,及時粘貼在墻上,磚上楞要跟線并立即拍實, 隨之將擠出的砂漿刮掉,將面層清擦干凈(在粘貼前,磚塊材要浸水晾干,墻面刷水濕潤).3.1。9冬期施工:室內(nèi)操作溫度不低于+5C。室外操作時,應按氣溫的變 化摻防凍劑,但必須注試驗室試驗后才能操作.4、質(zhì)量標準4.1主控項目:4.1 o 1各種面層所用的板塊品種、質(zhì)量必須符

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
  • 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論