1、PAGE 3PAGE 6Proposed Design Philosophy, Construction, Installation and Monitoring MethodAs per 22.1.7 of Section 1.0 of ITB PAGE 6 PAGE 1 Proposed Design Philosophy, Construction, Installation and Monitoring MethodAs per 22.1.7 of Section 1.0 of ITB NUMPAGES 1Proposed Design Philosophy, Construction
2、, Installation and Monitoring Method ( as per 22.1.7 of section 1.0)Source of borrows pit indicating the location and quantityWe have license given by Vietnam authority to exploit a quantity of 8, 400,000 m3 in Nha Be river and the location is in Nhon Trach district, Dong Nai province.Physical propr
3、ieties of proposed fill materialThe sampling test of sand proposed to use is carried out according to AASHTO M45-89, C144-88 (see Test Result of Analyses of Sand component). The specific weight of the sand is 2.634, unit weight 1.5g/cm3, organic content 2.87% and modules 2.52.3. Proposed method of s
4、tatement and monitoring devices3.1 Method statementAccording to the geotechnical report of the site, the void ratio of the soft silty clay (e) is 2.377, and the permeability coefficient (Kv) 5.5*10-7cm/s. If we adopt “wick drains and pre-loading” method to reach a soil bearing capacity of 50Kpa, 75K
5、pa, 100Kpa under the sites conditions, the consolidation period would be far beyond the proposed work period. For the purpose of reducing the consolidation period of foundation soil an overload should be added, though the loading would be 7.30m high to fulfill the bearing capacity of 100Kpa. Obvious
6、ly, this technique would bear a tremendous number of loading and unloading, which would also mean a high construction cost. The stability of side slope would also be difficult to monitor.Based on our previous experience of soft soil improvement of China coastal and Hiep Phuoc Power Plant in Nha Be,
7、15km Southeast of Hochiminh City, the pre-loading method is appropriate only for general area. In process area we suggest to adopted the following method (details see drawings “Proposed Process Area Plan” and “Proposed Process Area Zone” in page 6, 7):f = 50 Kpa, vacuum precompression method;f = 75
8、Kpa, vacuum precompression and filling water (2.0m) on membrane method;f = 100 Kpa, vacuum precompression compound with loading method.The hydraulic filling of sea sand should be adopted under the elevation +2.80, which is specified in the tender documents. But based on our site investigation report
9、, we propose to use sweet water sand instead of sea sand for these following reasons:Fine grade and high mud content of the sea sand; No local facilities available such as hydraulic filling mud absorption. The backfill material (sweet water sand) will be delivered by barges to the nearest dock and t
10、hen carried by trucks to the site.3.2 Monitoring devicesAccording to the requirement of the tender documents, settlement gauge should be installed at 50mx50m grid and be measured by leveling instruments.In accordance with the requirement of the owner, the static penetration test should be carried ou
11、t at the 10 specified points and the penetration instruments should be buried through the whole depth of the compressible soil layers.The compaction test of filling materials in site should be carried out with heavy compactor. Design philosophy to achieve the requirement of the specification for soi
12、l improvementphilosophy of vacuum precompression methodThe vacuum precompression method is used to consolidate foundation soil. This method consists in laying on the surface of foundation soil a sand bed, and in installing a drainage system with wick drains. The sand bed drain line is buried and con
13、nected with vacuum system to form an air exhaust and a dewatering system. A set of airtight seal membranes is laid on the surface of the sand bed with its edge buried in soil. Thus, a negative pressure area within sand bed and foundation soil can be formed from air exhaust and dewaturing pumps. The
14、vacuum method can reach a soil bearing capacity of 80KPa. Under the vacuum condition, soil is in the state of consolidating and pore water is discharged from soil under the pressure difference. The consolidation is completed when pressure of soil to be consolidated is reaching the same pressure of t
15、he drainage system.The philosophy of vacuum recompression method is that under the pressure difference (Pa-Pv), soil can be consolidated; Pa indicates atmospheric pressure and Pv indicates air pressure in the sand bed and the vertical drains. In the calculation of consolidation of the foundation soi
16、l, the RENDULIC-TERZAGE Theory and BICOT Theory of Consolidation can be adopted which are the same of those adopted in loading recompression method. The drop of the ground water table may also accelerate the consolidation of foundation soil beside the pressure difference. The effective stress in the
17、 soil increases successively during the period of consolidation of the foundation soil with vacuum recompression method. The horizontal displacement of the soil is toward the center of the consolidation area from the beginning of the period of vacuum recompression, which is different from the loadin
18、g recompression method. So the stability of the foundation soil will not become a problem, and the required vacuum capacity can immediately be obtained and consequently, the period of vacuum recompression can be curtailed. Details is shown in drawings “Design Philosophy for Vacuum Precompression “ a
19、nd “Flow Diagram of Vacuum Precompression Method” in page 8, 9.Regarding the short work period of this project, the vacuum compound with loading recompression method is used in the process area where the required bearing capacity of the foundation soil is 100 Kpa. It has been proved from the theoret
20、ical calculation and our previous experience that the effects of vacuum and loading recompression methods on the consolidation can be coaxed. For this purpose, a soil capacity of 150 Kpa had been obtained in one of our previous project in the turbine house of Hiep Phuoc power plant located at Nha Be
21、 district in Hochiminh city. During the vacuum process and under the pressure difference (Pa Pv), the pore water permeates into the vertical drains and the consolidation occurs. On the other hand, when using pre-loading method, the air pressure raises to Pp and the consolidation occurs under the pre
22、ssure difference (Pp Pa). Therefore, by using the vacuum compound with pre-loading method, the pressure can be increased to (Pp PV) and the consolidation effect would be improved as a result.The process of vacuum compound with pre-loading method is shown in drawing “The Process drawing of Vacuum Pre
23、compression combined with Loading Method” in page 10.4.2 Monitoring method The loading height and loading period of each step of general area is mainly controlled by the stability of the foundation soil. The settlement monitoring should be mainly concerned in this area.Because the vacuum precompress
24、ion method will not cause a soil stability problem, the site measurements have less significance comparable to pre-loading method. According to the requirement of the tender documents, settlement gauges should be installed at 50mx50m grid and be measured by leveling instruments. The total settlement
25、 and settlement speed of the foundation in the loading area as well as the settlement or the rising height in the surrounded area must be monitored.The final settlement S can be calculated from the site monitoring data. The consolidation settlement Sc and the average consolidation ratio are obtained
26、 from this value. Moreover, the value can also be calculated as well as the average consolidation coefficient Cv.According to the requirement of the owner, the static penetration test should be carried out at the 10 specified points and the penetration instruments should be buried through the whole
27、depth of the compressible soil layers.4.3 Preliminary geotechnical design for vertical drains and soil dischargeThe type SPB plastic drainage plate is adopted as the vertical drains in this project. The vertical drains would be distributed accordingly to an equilateral triangle pattern.Based on our
28、previous experiences of soft soil improvement in the Mekong delta area and according to the work requirements from the project, we believe that the bearing capacity of processed foundation soil can be reached. However, it is arduous to reach the same requirement for the deformation. It needs a compa
29、ratively long period to attain a stable state of foundation soil settlement.In accordance with the tender document for the general area, the filling materials have to be well compacted to meet the building standard. Still, there are no relevant requirements of bearing capacity, so the inserting dept
30、h of the vertical drains should be less than the thickness of the soft soil layers to avoid the occurrence of extreme settlement. In the opposite case, that would imply a large additional quantity of loading materials and a soaring construction cost.Combining vacuum technique with loading method, th
31、e different requirements of bearing capacity of process area can be firmly met. Obviously, the airtight condition during vacuum precompression is a critical factor to ensure a sufficient vacuum level. The depth of vertical drains in the process area is estimated to be 10m to ensure that the end of v
32、ertical drains is within the soft soil layer which is about 14m depth. This will avoid any leakage from lower sand layer.The interval of the vertical drains in general area: L = 1.20mFor process area: f =5 t/m2, L = 1.2m.f =7.5 t/m2, L = 1.1m.f =10 t/m2, L = 0.7m.The initial geotechnical design is s
33、hown in two tables: “ Geotechnical Design of Vacuum Precompression Method of Process Area” and “ Geotechnical Design of Pre-loading Method of General Area” in page 11, 12.Proposed vertical drains materialsThe SPB0-II type vertical drain is adopted from CHINA. The proprieties of the production meet t
34、he requirements of Chinese standard DB3201Q18-87 (details is shown below in table “Quality Standard of SPB Vertical Drains “ ).uality Standard of SPB Vertical DrainsParameterUnitTypeRemarksSPB-1SPB-2SPB-3MaterialsPlastic strip core coated with a membrane filterSectiondimensionsWidthmm100210021002Thi
35、cknessmm3.54.04.5Longitudinal drain capacitym3/s15*10-625*10-6Side pressure 350KN/m2Tension strengthKN/10cm1.01.3Elongation is 100%Elongation1010Permeability coefficientcm/s5*10-45*10-4Capacity of insulating soilm751530Elongation is 10%WetN/cm1020Elongation is 15%Linear weightg/m90-10090-100Unit len
36、gthm200200Site clearingGeotextile layingPreparation of wick drainsinserting equipmentSite office andcontrol centerVacuum pipes installWick drains insertionSecond sand beddingFirst sand beddingMembrane layingAir extracting equipmentVacuum gauge and relay installAir extraction testPrecompression by ai
37、r extractionVacuum pressure and settlement readingsin the process areaEquipment removal of the precompression methodRefill and levelingWeir construc-tionControl and operation centerElectrical and light circuitRecheck the vacuum pumpsTemporary water pumps installationVacuum pipe preparationMembrane p
38、reparationSettlement gaugesInitial reading of settlement and relayResilience reading of ground settlementLeakage repair of membraneResults verification 編號:時間:2021年x月x日書山有路勤為徑,學(xué)海無涯苦作舟頁碼:第 頁Flow Diagram of Vacuum Precompression MethodGeotechnical design of vacuum precompression methods of process area
39、Process Area(m2)Average depth of soft soil(m)Bearing Capacity of foundation soil (t/m2)Interval of vertical drains(m)Depth of vertical drains(m)CalculatedFinal consolida-tion settlement(m)Depth of vertical drains(m)CalculatedFinal consolida-tion settlement (m)Estimated Settlement(m)Depth of vertical
40、 drains(m)CalculatedFinal consolida-tion settlement (m)128254 *_2528614.4210.02.101.608.01.62.9510.02.301.808.01.90100.813.43.6010.02.692.408.02.35241428.00 *_37450.0013.3910.02.101.608.01.62.7210.02.301.808.01.90100.812.33.3010.02.692.408.02.15354313.00
41、 *_49603.0013.0551.0212.02.5310.02.101.608.01.62.6510.02.301.808.01.90100.812.03.2310.02.692.408.02.15Note: The “ *” shows that the numerator means the proposed process area, which is extended from the area specified in the tender documents (denominator) by extending edge to 4.0 m.When f
42、= 7.5t/m2, the settlement (1.8) is calculated by using the average settlement after vacuum precompression of the main building of Hiep Phouc power plant (1.55) added settlement occurred in consolidation period (90days) which is (90* 3)mm. Geotechnical design of vacuum precompression method in process areaSchemeProcess Area(m2)Average depth of soft soil(m)Bearing Capacity of foundation soil (t/m2)Interval of vertical drains(m)Treatment Depth (m)Estimated Settlement(m)1 28254 *_2528614.4151.210.01.607.
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2024年鋼筋結(jié)構(gòu)施工協(xié)議
- 2025年智能交通系統(tǒng)建設(shè)反擔(dān)保合同3篇
- 2024年量子計算機技術(shù)研發(fā)與許可合同
- 2024年研發(fā)團隊外包服務(wù)合同
- 專業(yè)化一體化服務(wù)合同范本(2024年版)版
- 2024校服生產(chǎn)與校園服裝租賃服務(wù)合同3篇
- 2024版混凝土框架結(jié)構(gòu)施工協(xié)議條款版B版
- 專業(yè)化人力資源解決方案服務(wù)協(xié)議樣本版A版
- 2025不動產(chǎn)抵押權(quán)設(shè)立與登記服務(wù)擔(dān)保合同范本3篇
- 2024年茶園土地承包管理合同樣本
- 批量訂購車輛合同范本
- 新能源發(fā)電技術(shù)學(xué)習(xí)通課后章節(jié)答案期末考試題庫2023年
- 初中物理-初三物理模擬試卷講評課教學(xué)課件設(shè)計
- 道路危險貨物運輸企業(yè)安全生產(chǎn)清單
- 鋼鐵生產(chǎn)企業(yè)溫室氣體核算與報告案例
- 農(nóng)業(yè)合作社全套報表(已設(shè)公式)-資產(chǎn)負(fù)債表-盈余及盈余分配表-成員權(quán)益變動表-現(xiàn)金流量表
- 深入淺出Oracle EBS之OAF學(xué)習(xí)筆記-Oracle EBS技術(shù)文檔
- 貝利嬰幼兒發(fā)展量表BSID
- 四年級計算題大全(列豎式計算,可打印)
- 人教部編版八年級歷史下冊第7課 偉大的歷史轉(zhuǎn)折課件(共25張PPT)
- 年會主持詞:企業(yè)年會主持詞
評論
0/150
提交評論