版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)
文檔簡介
1、Amendment 1 to PANS-ATM, Doc 4444, 15th Edition “ICAO 2012”UpdateFederal AviationAdministrationFederal AviationAdministrationPrepared by: Ray Ahlberg, AJE-36Date presented: December 2011 AgendaTransition PlansTesting PlansLatest guidance regarding the changeTransition PlansANSPs are Currently making
2、 changes, contracting for changes, or have made changesPlanning to test systems and interfaces in the first half of 2012ANSPs will start coming on line in transition mode in July 2012FAA expects to be ready for mixed operations in September 2012The FAA plans to request filers start filing NEW format
3、 no later than November 12 to ensure that no PRESENT flight plans are in the system on November 15th.Test Opportunities The FAA is planning three types of test capabilities for flight plan filers:Email flight plans to us. We will evaluate them and reply with the results.We are working to set up syst
4、ems at our Technical Center and make them available in set time periods.We have to solve some connectivity issuesWe will define periods of limited operations, after July 1st, where flight plans can be submitted to specific centers. Test OpportunitiesThe details on how to sign up for testing will be
5、provided on the 2012 web site.Additionally, we are working to publish examples of valid and invalid flight plans.Test Opportunities with Eurocontrol IFPSEurocontrol has updated their internet-accessible IFPS test facility to handle 2012 format flight plansThey have also changed the order of validati
6、on so that Fields 10 and 18 are evaluated before the route.Therefore, you dont need a valid European route to test a 2012 compliant flight planIf you get a route error (or errors), it means Fields 10 and 18 are considered validThe tool will automatically detect whether the flight plan is in NEW or P
7、RESENT formatIf both formats appear, an error will be generatedThe errors provided are informative and it will typically be easy to diagnose errorsIFPUV Test FacilityThe test capability is located in the CFMU Portal, at /PUBPORTAL/gateway/spec/index.html Note, IFPUV does not support some common brow
8、ser versions. If the IFPUV window does not appear on the right lower side of the portal page then implement “compatibility mode” in your browser settingsNote that IFPS, like most ANSP systems, will not enforce Field 18 orderLatest Guidance regarding the changeThe European and Asia-Pacific 2012 task
9、forces have been the most active in publishing technical guidance on interpreting the amendmentSome minor discrepancies exist, but should not affect filersThe current official APAC guidance document is available at/edocs/FPL_Guidance_ver3.pdfThe expected final version (v4) is not yet approved, and i
10、s available in draft at/cns/meeting.do?method=MeetingDetail&meeting_id=88Specifications for the IFPS, which encompass the EUR region interpretations, are available at /documents_open_meetings/files.php?subcategory_id=120FAA guidanceWe have received a few comments on the draft “FAA ICAO Flight Planni
11、ng Interface Reference Guide”Expect an update soonThe following issues have been identified:CHG, CNL, and DLA messages will be required to contain Field 18 (DOF/ information or -0). The draft reference guide does not contain this update.Some material is specific to domestic systems, need to identify
12、 where filing instructions for oceanic systems are differentSome additional guidance on when to use certain Field 18 indicators will be provided. Existing information is incompleteGuidance on use of STS/NONRVSM will be updatedMore information on non-Standard indicators that the FAA plans to recogniz
13、e will be provided (RVR/, RFP/, and IRMK/)Some sample flight plans in NEW format(FPL-N12345-IG -C172/L-SD/C -KGAI0710 -N0110A080 DCT EMI DCT -ZZZZ0119 KEDG -DEST/MD31)(FPL-N234W-IG -C550/L-SDGLRWZ/C -KPWM0030 -N0350F380 BRUWN2 ACK J62 RBV DCT CHS SSI3 -KJAX0119 KCRG -PBN/A1D2 NAV/RNVD1E2A1)Simple GA flightHigh End GA flightSome sample
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2024年建筑安裝工程項目合同
- 力課件教學(xué)課件
- 2024年廣告代理合作協(xié)議
- 2024年工程咨詢與技術(shù)服務(wù)合作協(xié)議
- 2024年度公司用車管理協(xié)議
- 2024年度建筑工程設(shè)計、施工購銷合同
- 2024年度35kv高壓線路施工合同
- 2024年度某影視公司與某投資公司關(guān)于某電影項目融資的合同
- 公司年會的演講稿模板八篇
- 為世界無車日活動宣傳標(biāo)語(155句)
- 2024年中國南水北調(diào)集團(tuán)水網(wǎng)水務(wù)投資限公司及下屬單位社會招聘高頻難、易錯點500題模擬試題附帶答案詳解
- (新版)食品生產(chǎn)企業(yè)食品安全員理論考試題庫500題(含答案)
- 七年級語文上冊第13課《紀(jì)念白求恩》公開課一等獎創(chuàng)新教案
- 統(tǒng)編版語文六年級上冊第八單元大單元整體教學(xué)設(shè)計
- 教師個人業(yè)務(wù)學(xué)習(xí)筆記(41篇)
- 2025年高考語文復(fù)習(xí)備考復(fù)習(xí)策略講座
- 數(shù)學(xué)史上的三次數(shù)學(xué)危機
- 2024年水電暖安裝承包合同
- 缺乳(乳汁淤積)產(chǎn)婦的中醫(yī)護(hù)理
- 2024北師大版新教材初中數(shù)學(xué)七年級上冊內(nèi)容解讀課件(深度)
- 2024年公共營養(yǎng)師三級考試試卷及答案
評論
0/150
提交評論