1、.wd.wd.wd.BIssue for ApprovalAIssue for ApprovalREV.DESCRIPTIONDATEDESIGNED BYCHECKED BYREVIEWED BYAPPROVED BYOWNERVIETNAM ELECTRICITYTHERMAL POWER PROJECT MANAGEMENT BOARD 3CONSULTANTPOWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3CONTRACTORTHE CONSORTIUM OF CHENGDA-DEC-SWEPDI-ZEPCSUBCONTRACTORZH
2、EJIANG THERMAL POWER CONSTRUCTION COMPANYPROJECT:DUYEN HAI 3 THERMAL POWER PLANT PROJECTCONTRACT NO:DH3-05082011DOCUMENT NAME:Working Plan for Main House ExcavationPROJECT CONTROL NO.: DH3-31U-C-WP-0002REV: BContents TOC o 1-3 h z u HYPERLINK l _Toc3892302321 Project Overview PAGEREF _Toc389230232 h
3、 1HYPERLINK l _Toc3892302332 Reference Standards and Codes PAGEREF _Toc389230233 h 1HYPERLINK l _Toc3892302343 Construction Preparation PAGEREF _Toc389230234 h 1HYPERLINK l _Toc3892302353.1 Technique Preparation PAGEREF _Toc389230235 h 1HYPERLINK l _Toc3892302363.2 Labor Power Preparation PAGEREF _T
4、oc389230236 h 1HYPERLINK l _Toc3892302373.3 Machinery Preparation PAGEREF _Toc389230237 h 2HYPERLINK l _Toc3892302383.4 Material Preparation PAGEREF _Toc389230238 h 2HYPERLINK l _Toc3892302393.5 Working Surroundings Preparation PAGEREF _Toc389230239 h 2HYPERLINK l _Toc3892302403.6 Working Schedule P
5、AGEREF _Toc389230240 h 2HYPERLINK l _Toc3892302414 Main Method & Technique Measures PAGEREF _Toc389230241 h 3HYPERLINK l _Toc3892302424.1 Construction Sequence & Methods PAGEREF _Toc389230242 h 3HYPERLINK l _Toc3892302434.2 Slope PAGEREF _Toc389230243 h 3HYPERLINK l _Toc3892302444.3 Steel pile PAGER
6、EF _Toc389230244 h 4HYPERLINK l _Toc3892302454.4 Drainage of Foundation Pit PAGEREF _Toc389230245 h 6HYPERLINK l _Toc3892302464.5 Foundation Pit Monitoring PAGEREF _Toc389230246 h 6HYPERLINK l _Toc3892302475 Quality Assurance Measures PAGEREF _Toc389230247 h 6HYPERLINK l _Toc3892302485.1 Organizatio
7、n chart of QA/QC PAGEREF _Toc389230248 h 6HYPERLINK l _Toc3892302495.2 Flow chart of quality problems treatment PAGEREF _Toc389230249 h 7HYPERLINK l _Toc3892302505.3 Specific measures PAGEREF _Toc389230250 h 8HYPERLINK l _Toc3892302516 Supplement of Guarantee Measures to the Schedule PAGEREF _Toc389
8、230251 h 8HYPERLINK l _Toc3892302526.1 Establish a Strict Censorship for Construction Schedule PAGEREF _Toc389230252 h 8HYPERLINK l _Toc3892302536.2 Warranty the Supply of Materials & Outward Processing Components PAGEREF _Toc389230253 h 8HYPERLINK l _Toc3892302546.3 The Coordination Work Between Ci
9、vil Engineering & Equipments Installation PAGEREF _Toc389230254 h 9HYPERLINK l _Toc3892302557 Safety & Civilized Construction PAGEREF _Toc389230255 h 9HYPERLINK l _Toc3892302568 Attachment Drawing PAGEREF _Toc389230256 h 11HYPERLINK l _Toc3892302578.1 Drawing of excavation for #1 main house PAGEREF
10、_Toc389230257 h 11HYPERLINK l _Toc3892302588.2 Layout of Drainage measures for #1 main house foundation pit PAGEREF _Toc389230258 h 12HYPERLINK l _Toc3892302598.3 Steel Sheet piles survey points layout for #1 main house PAGEREF _Toc389230259 h 13HYPERLINK l _Toc3892302608.4 Survey Record for Foundat
11、ion Pit PAGEREF _Toc389230260 h 14HYPERLINK l _Toc3892302618.5 Calculation for steel pile wall PAGEREF _Toc389230261 h 15Working Plan for Main House Excavation1 Project OverviewProject Name:Duyen Hai 3 2x622MW Thermal Power Plant;The Owner: Power Generation Corporation 1The Consultant: Power Enginee
12、ring Consulting Joint Stock Company 3Design Overview: The project of Vienam Duyen Hai 3 Power Plant is located in Duyen Hai, Tra Vinh Province. Which the foundation is located on mud layer or sea sand layer. Rawgeographical elevation is -2.37m, and underground water level is -3.8m.Main house of #1 u
13、nit includes Turbine house and bunker bay, axis AD is 52.6m, axis 09 is 91m. The excavation cushion bottom elevation for foundation of main house are -4.1m、-5.1m、-6.1m、-8.4m, the excavation cushion bottom elevation for turbine house foundation is 9.4m, the bunker bay cushion bottom elevation is -6.1
14、m.As for elevation of some foundation is below underground water level, and excavation is deep, it is required to stress on dewatering for deep foundation pit and slop reinforcement to ensure the safety construction.2 Reference Standards and CodesUnified Standard for Constructional Quality Acceptanc
15、e of Building EngineeringGB 50300-2001 Code for Acceptance of Constructional Quality of Building Foundation (GB 502022002)Code for Engineering SurveyingGB 50026-20073 Construction Preparation3.1 Technique PreparationPrepare, review and approve method statement in accordance with procedures.Prepare I
16、TP in accordance with acceptance standard.Prepare construction start report, reviewed and approved by related departments.Organize related personnel for drawing joint review and technique enclosure, making record and archive.Before start work, perform technique and safety enclosure for constructors.
17、Complete site horizontal control network and leveling point monitoring work according to the surveying control point supplied by construction unit. 3.2 Labor Power PreparationLabor required by this project is as following table:S.N.Type of workQuantityS.N.Type of workQuantity1Site management staff27
18、Excavator driver42HSE Personnel18Piling machine driver23QC Inspector19Other staff154Electrician25Surveyor46Truck driver163.3 Machinery PreparationMachinery and equipments by this project is as following table:S.N.NameTypeQuantity (unit)Remarks1Loader12Hydraulic excavator23Submersible pump2.2kw174Dum
19、p truck85LevelATO 3216Total StationNTS 312R+17Piling MachineType 4501For steel sheet piling work3.4 Material PreparationPlastic film:4000 m2;Sand bag:600 m;Scaffoldings:7 t;Fastening:1000 pieces;Water pipes:700m;12m steel sheet piles:160 pieces.All above material shall be traced in the whole constru
20、ction process, and added if found not enough.3.5 Working Surroundings PreparationWater: lead from Phase 3 steel factory water pipes;Electricity: lead from II cabinet located in the southwest of phase 3 #1 boilerRoad: a concrete road used for transportation locates in the southwest of the working sit
21、e;Temporary roads are built by actual demands between the working site with the concrete road. 3.6 Working Schedule4 Main Method & Technique Measures4.1 Construction Sequence & MethodsThe sequences & methods for various working parts are as following table:S.N.Working PartContents & Sequence1Bunker
22、bay excavationExcavated to the depth of -6.1m, adopt slope excavationusing plastic film to cover slope surfaceafter the excavation is completed, drainage ditch & pit are set at the bottom of the foundation for pumping water.2Turbine foundation axis ABExcavated to the depth of -4.1m,adopt slope excav
23、ationusing plastic film to cover slope surfaceafter the excavation is completed, drainage ditch & pit are set at the bottom of the foundation for pumping water.3Excavation for Turbine foundationB row of steel sheet piles constructionThe foundation of depth to -9.4m,The rest adopts slope excavation,
24、vertical excavation for B rowusing plastic film to cover slope surfaceafter the excavation is completed, drainage ditch & pit are set at the bottom of the foundation for pumping water.See 8.1 for drawing of the foundation excavation4.2 SlopeThe slope of this project is as 1:1.5 according to the Code
25、 for Acceptance of Constructional Quality of Building Foundation (GB 502022002); the distance between the boundary of earthwork excavation with foundation boundary is: b= 0.6+0.3+0.3+1.5h, which h is excavation depth. See following sketch for details:Since the soil of the site has a good stability i
26、tself, reinforcement measures need not to be taken for the slope during excavation.The slope covered with color band cloth preventing from rain. As following pic. shows :4.3 Steel pileTo assure construction progress, the foundation by the side of B should be supported with steel sheet piles。Accordin
27、g to the data of exploration & the manufacturers, the type & layout of the teel sheet piles are as follows:Type: 12m in lengthSee attachment 8.5 for calculation , 0.4 in width, 76.1kg/m, as following picture:Site layout of the steel sheet of piles is as picture 8.1;Install guide positioning bracket:
28、 it is installed for ensuring the verticality and level of piles. The enclosing purlins are welded by 2pieces of 20# U-steels in two-way, and the height for Installing guide positioning bracket is 2.5m, two theodolites are set for controlling the verticality. When the installation is completed, the
29、beams of guide positioning bracket cannot be sunk and deformed and shall keep vertical in the process of steel sheet piling.Steel sheet piling: the steel sheet piles shall be inspected before piling, vertical face shall be flat and alignment, and lock catch shall meet requirements, and be fixed if n
30、ot. Meanwhile close groove bottom in tip of piles with grease painted onto it to avoid mud into the lock catch. Crawler crane is used for piling, the steel sheet piles will be lifted to the inserting point by cranes, the lockcatch shall be in alignment when pitching of piles, pile cap and hardwood m
31、at will be covered on top and piled normally. In order to ensure the verticality of piles, the piling shall be performed along with the enclosing purlins by using two theodolites for controlling. When start piling, the location and direction of the first and second pieces of pile shall be accurate f
32、or the function of guiding, they shall be measured for every meter into the earth. When it reaches the height of bracket, it shall be fixed by welding of steel plate with guide positioning bracket. After that, mark the position of each steel pile on steel enclosing purlings in convenient of correcti
33、on at any time. If the pile is inclined in piling, steel rope will be used for pulling the piles, pulling, piling and correction by steps. When the first row piling finished, and be piled to the designed depth by second time.4.4Drainage of Foundation PitWater collection and drainage by ditches are t
34、aken for foundation pit drainage, see foundation pit drainage drawing for the drainage facilities. Bags covered with plastic film on the top of slope are used for stop water to prevent outside water from flowing into the pit. The bags shall be stacked closely with the gap filled by clayey soil.Width
35、 of 300mm ditch are set at the position of 600 mm higher the pit bottom, the depth of ditch at slope starting point is 300mm and the gradient is in 0.1%. 600mm600mm water collection pits are set along with the ditch, the distance between two pits is no more than 30m. The depth of water collection pi
36、t is 500 mm deeper than the ditch. And the water in the pit will be pumped outside.See attachment 8.2 for water stop, ditch and water collection pit arrangement.4.5Foundation Pit MonitoringIn order to ensure the construction safety, displacement and settlement for steel sheet pile shall be monitored
37、 in the period of foundation excavation and using.The layout of monitoring points: one monitoring point is set on the middle steel sheet pile, which both sides of 12m and 24 m away are also set monitoring points, the total quantity Is 5, see attachment 8.3 for monitoring points layout.Method of moni
38、toring points: when the construction of steel sheet piling is completed, one small hole on the top of pile drilled by nail is considered as the monitoring point for displacement and settlement.Monitoring: The initial value shall be measured in the 12h after the completion of foundation pit excavatio
39、n; And in the 3days after the initial value measured, it shall be measured once in each day; and after that once one week.See attachment 8.4 for Table of monitoring record.5 Quality Assurance Measures5.1 Organization chart of QA/QC Project ManagerProject Chief Engineer Deputy Project DirectorProject
40、 Quality in charge Specialized person for quality inspection of projecttechnical person in charge Specialized person for quality inspectionTeam technician Surveying teamMaterial management teamMachinery dispatching teamUnskilled workers5.2 Flow chart of quality problems treatmentIf any quality probl
41、em is found, it is required to be treated as followingfind quality problems or quality accident confirm the protective measuresinvestigate the said above Analyze cause unclearimplement the protective measuresclearInvestigate more, and analyze the cause furtherno need to treat treat or notneed to tre
42、atconfirm treatment plandesign or constructioninspection and acceptanceconclusionsubmit the treatment plan 5.3 Specific measures5.3.1 Surveying and LayoutTotal station and level used for surveying shall be calibrated with calibration certificate.Sideline shall be re-surveyed in the process of excava
43、tion to assure the accurate excavation position.5.3.2 Earth work100 mm above elevation of foundation pit basement shall be excavated by manpower to avoid disturbing the basement soil and lowering its load capacity. Under-excavation and over-excavation are not allowed.If over-excavation happens, it s
44、hall be backfilled with the material permitted by the Owner/Consultant, and the compaction factor shall meet the design requirements.?ITP for Earth Work?shall be implemented.6 Supplement of Guarantee Measures to the Schedule6.1 Establish a Strict Censorship for Construction ScheduleThe construction
45、progress and the time for each kind of workers joining into the work shall be controlled in accordance with the network plan, the management shall arrange construction sequences in accordance with aggregate scheduling. Check everyday construction progress and finish everyday work in schedule, ensure
46、 todays work will not affect tomorrow, this process will not influence next. The site manager will take command by himself for key part which affect schedule.6.2Warranty the Supply of Materials & Outward Processing ComponentsOrganize personnel making subproject and item project analysis sheet, and p
47、rocessing, procurement and supplying plan for material, production and semi-production. Ensure the machinery allocation work and material procurement and supplying. Determine time for material enter-site according to the Drawing of Construction Scheduling Network Plan.6.3The Coordination Work Betwee
48、n Civil Engineering & Equipments InstallationThe civil engineering & equipments installation working team need to cooperate in construction, and protect each others production and semi-production. A coordination meeting is required to hold by project manager once a week to solve the problems for coo
49、peration among various of works. Construction groups with many years of constructionexperience are selected for this project. And complete the management organization. Arrange labor power and material supplying reasonably and improve construction efficiency according to the construction schedule net
50、work plan. Distinguish primary and secondary parts according to the the characteristics of this project, interchange the work in accordance with construction sequences and technology to assure the project is done on schedule.7 Safety & Civilized ConstructionThe personnel shall wear safety helmet when enter into the site.All the constructor shall wear required safety shoes when enter into the site.Power distribution by classes and three-phase five little system for power distributing line are taken in site. Forbid to stay wire wi
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 全國粵教版信息技術(shù)八年級(jí)下冊(cè)第二單元第十五課《數(shù)碼顯示與無線通信的實(shí)現(xiàn)》教學(xué)設(shè)計(jì)
- 云南經(jīng)貿(mào)外事職業(yè)學(xué)院《社會(huì)問題與對(duì)策》2023-2024學(xué)年第二學(xué)期期末試卷
- 遼寧建筑職業(yè)學(xué)院《中學(xué)生物學(xué)課程標(biāo)準(zhǔn)與教材研究》2023-2024學(xué)年第二學(xué)期期末試卷
- 重慶移通學(xué)院《精細(xì)化工綜合實(shí)訓(xùn)》2023-2024學(xué)年第二學(xué)期期末試卷
- 廣西體育高等??茖W(xué)?!斗b美學(xué)》2023-2024學(xué)年第二學(xué)期期末試卷
- 南昌交通學(xué)院《電子科學(xué)與技術(shù)專業(yè)創(chuàng)新課程》2023-2024學(xué)年第二學(xué)期期末試卷
- 克拉瑪依職業(yè)技術(shù)學(xué)院《新能源汽車檢測與維修》2023-2024學(xué)年第二學(xué)期期末試卷
- 濱州學(xué)院《酒店電子商務(wù)》2023-2024學(xué)年第二學(xué)期期末試卷
- 重慶工程職業(yè)技術(shù)學(xué)院《現(xiàn)代傳感器技術(shù)及虛擬儀器》2023-2024學(xué)年第二學(xué)期期末試卷
- 福建農(nóng)業(yè)職業(yè)技術(shù)學(xué)院《會(huì)計(jì)學(xué)基礎(chǔ)》2023-2024學(xué)年第二學(xué)期期末試卷
- 2021年杭州市中考英語試題及答案
- 安徽藥都銀行2023年員工招聘考試參考題庫含答案詳解
- 小學(xué)體育與健康人教體育與健康基礎(chǔ)知識(shí)輕度損傷的自我處理【省一等獎(jiǎng)】
- 外貿(mào)中英文報(bào)價(jià)單模版
- 部編版二年級(jí)下冊(cè)科學(xué)全冊(cè)教案
- 婦產(chǎn)科學(xué)(第9版)第二章女性生殖系統(tǒng)解剖
- GB/T 700-2006碳素結(jié)構(gòu)鋼
- 2023年開封大學(xué)高職單招(數(shù)學(xué))試題庫含答案解析
- 建設(shè)項(xiàng)目委托代建合同范文(4篇)
- GB/T 13277.4-2015壓縮空氣第4部分:固體顆粒測量方法
- 人教版八年級(jí)下冊(cè)歷史全冊(cè)教案完整版教學(xué)設(shè)計(jì)含教學(xué)反思
評(píng)論
0/150
提交評(píng)論