1、Boston Big Dig-BackgroundThe problemsBoston, Massachusetts had a world-class traffic problem, an elevated six-lane highway called the Central Artery that ran through the center of downtown. When it opened in 1959, the Central Artery comfortably carried about 75,000 vehicles a day. It has carried upw
2、ards of 200,000, quite uncomfortably, making it one of the most congested highways in the United States.And traffic wasnt the only problem the old Central Artery caused in Boston. The elevated highway (which displaced 20,000 residents when it was built) also cut off Bostons North End and Waterfront
3、neighborhoods from the downtown, limiting these areas ability to participate in the citys economic life. 1Boston Big Dig - SolutionsThe projects two major components: Replacing the six-lane elevated highway with an eight-to-ten-lane underground expressway directly beneath the existing road, culminat
4、ing at its northern limit in a 14-lane, two-bridge-crossing of the Charles River. After the underground highway opened to traffic, the crumbling elevated wasdemolished and in its placewill beopen space and modest development. The extension of I-90 (the Massachusetts Turnpike) from its former terminu
5、s south of downtown Boston through a tunnel beneath South Boston and Boston Harbor to Logan Airport. The first link in this new connection- the four-lane Ted Williams Tunnel under the harbor- was finished in December 1995. The new bridge replaced a deteriorating six lane double-deck bridge that was
6、demolished in spring 2004. 2The .75-mile underwater part of the 1.6 mile tunnel was built using a dozen steel tube sections, each longer than a football field, that were sunk into a trench on the Boston Harbor floor and connected togetherThe underwater portion of the tunnel is actually made up of tw
7、elve binocular shaped steel tubes.Now that connections to the Massachusetts Turnpike (I-90) and Route 1A are in place, use of the tunnel is open to all vehicles. Unlimited use of the tunnel for all began in mid-January 2003 upon the opening of the Mass Pike extension, which connects to the Ted Willi
8、ams Tunnel. Solutions - Ted Williams Tunnel3Boston Big Dig - Open SpacesNashua Street ParkThe Central Artery/Tunnel Project is creating about 40 acres of park and recreational space along the Charles River Basin. This aerial view shows the 2.5 acre Nashua Street Park, set to open in September. Open spa
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025校園公交站亭建設合同
- 2025生產企業(yè)承包合同范本
- 高校教學改革效果的評估與改進
- 2024年版基礎設施PPP項目特許經營協議版B版
- 2024年離婚合同書簽署與實際離婚程序詳解版B版
- 2024年燈具出口代理合同
- 2024年簡單餐廳服務員雇傭協議
- 代理售樓分成合同范例
- 商洛職業(yè)技術學院《能量轉換材料與器件》2023-2024學年第一學期期末試卷
- 汕尾職業(yè)技術學院《編校軟件應用》2023-2024學年第一學期期末試卷
- 中醫(yī)內科學虛勞培訓課件
- 2024廣東省建筑安全員A證考試題庫附答案
- 【MOOC】勞動與社會保障法學-西南政法大學 中國大學慕課MOOC答案
- 西安電子科技大學《人工智能概論》2021-2022學年第一學期期末試卷
- 2024年建設銀行個人住房貸款標準協議模板一
- 大學生職業(yè)規(guī)劃采訪稿
- 3、2024廣西專業(yè)技術人員繼續(xù)教育公需科目參考答案(99分)
- 中國血管性認知障礙診治指南(2024版)解讀
- 2024版房屋市政工程生產安全重大事故隱患判定標準內容解讀
- 期末 (試題) -2024-2025學年人教PEP版(2024)英語三年級上冊
- 完整2024年國有企業(yè)管理人員處分條例專題課件
評論
0/150
提交評論