下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
ProjectManagementServicesforRabighPhaseIIPetrochemicalProjectSPARINGPHILOSOPHY
JGCJobCode:0-5361-20-0000
Doc.No.:
S-PM-G000-1222-0603<8>
3of6
SCOPE
Thepurposeofthissparingphilosophyistoprovidedesignguidancefortheprovisionofsparefacilitiesandequipment.
Theobjectiveistheenhancementofthefollowingntoperationalfactors:
Safety
Reliability
Availability
Maintainability
Operability
DEFINITIONS
:AramcoOverseasB.V.andSumitomoChemicalCo..
APPLICABLEDRAWINGS,SPECIFICATIONS,ANDCODESANDSTANDARDS
ProjectSpecifications
S-PM-G000-1131-0007WaivingandClarificationProcedure
SaudiAramcoEngineeringStandards
SAES-J-600 PressureReliefDevices
DEVIATIONSANDCLARIFICATIONS
AnydeviationsorclarificationsfromthisspecificationrequireapprovalundertheWaivingandClarificationProcedure(S-PM-G000-1131-0007).
ORDEROFPRECEDENCEOFS
Theorderofprecedenceshallbe:
Thisspecification
Projectdrawingsandspecifications
ApplicableSaudiAramcoStandards
ApplicableInternationalCodesandStandards
GENERALSPARINGPHILOSOPHY
Stand-byequipmentwillbeprovidedforequipmentwhosefailurewouldadverselyaffecttheprocessproductiontargets(setoutinthebasisofdesignforeachunit)orthesafetyofthent.Equipmentwillalsobesparedwheneverthereisahighfrequencyofoperatingmaintenance;thisincludesequipmentinfoulingserviceaswellasequipmentrequiringspecificmaintenance.Thestand-byequipmentshallbeidenticaltotheoriginalequipment.Thestand-byequipmentshallbeconfigureda100%spareorN+1,asshowninTABLE1.Nmeansthenormaloperationequipmentnumberwhichcancover100%capacity.Thefollowingtableshowsthetotalequipmentcapacityincludingstand-byitem.Whereequipmentisnotessentialtotheprocessanddonotimpactoperations(e.g.certainfilters),onlyaby-passlinemaybeconsidered.
N
TotalEquipmentCapacityofN+1
TotalEquipmentCapacityofN+2
1
100%Duty+100%Spare=200%
100%Duty+2x100%Spare=300%
2
2x50%Duty+50%Spare=150%
2x50%Duty+2x50%Spare=200%
3
3x33%Duty+33%Spare=133%
3x33%Duty+2x33%Spare=165%
ProjectManagementServicesforRabighPhaseIIPetrochemicalProjectSPARINGPHILOSOPHY
JGCJobCode:0-5361-20-0000
Doc.No.:
S-PM-G000-1222-0603<8>
PAGE
5
of6
TABLE1GENERALSPARINGGUIDELINES
Item
Equipment
Service
SparingRequirements
Notes
1
Pumps
Pumpswhichhaveahistoryoffrequentfailureinoperation,
or
Pumpswhiayfailwhencalleduponcauseanunsafeconditionoftheinstallation,
jeopardisinglifeand/orequipment.
A100%spareisrequired.
Thesepumpsshallincorporateautomaticstartofthesparepump.
Pumpswhichoftenfailinoperation,or
Pumpswhichcancauseasevereprocessunitupsetwhenstartedup.
A100%spareorN+1ofpumpsisrequired.
Wheretwoservicescanpracticallyutiliseacommonsparethisisacceptable.
Otherpumpserviceswhichdonotfallintotheabovecategories.
Aninstalledspareisnotrequired.
Anon-installedspareshallbeprovided,unlessor
Licensor mendsotherwise.
2
Compressors
Compressorswhichhaveahistoryoffrequentfailureinoperation,
or
Compressorswhiayfailwhencalleduponcauseanunsafeconditionoftheinstallation,jeopardisinglifeand/or
equipment.
A100%spareisrequired.
Wheretwoservicescanpracticallyutiliseacommonsparethisisacceptable.
Compressorswhichoftenfailinoperation,or
Compressorswhichcancauseasevereprocessunitupsetwhenstartedup.
A100%spareisrequired.
Othercompressorserviceswhichdonotfall
intotheabovecategories.
Aninstalledspareisnotrequired.
Hydrotreaterrecyclecompressors
TobespecifiedbyLicensor.
However,prefersthe
centrifugaland driventypeCompressors.
Theexpectedprincipalcompressorsintheprocessunits.
TobespecifiedbyLicensor.
3
FansandBlowers
FansandBlowersincontinuousoperationwhichoftenfail,
or
FansandBlowerswhichcancauseasevereprocessunitupsetwhenstartedup.
A100%spareisrequired.
Wheretwoservicescanpracticallyutiliseacommonspare,thisisacceptable.
Item
Equipment
Service
SparingRequirements
Notes
4
Exchangerchangersincriticalandfoulingservice.
Aspareisrequiredifexchangerincriticalandfoulingserviceneedtobecleanedperiodicallyinlessthanexpectedshutdownintervalofbeingin
service.
Exchangersareusedintermittently(i.e.
coolersinsummer)
Aspareisnotrequired.
Tobeprovidedwithabypass.
5
Deaerators
(OnlyforIWSPP)
N+1ofdeaeratorsarerequired.
Nisthenumberofunitsrequiredto
meetumcontinuousBFWdemand.
6
Generators(OnlyforIWSPP)
N+1of generatorsarerequired.
The umcontinuouscredibledemandcanbemetwiththeone
largest generatorshutdown/tripped/outofserviceandnoneoftheothergeneratorsoperatingatabovetheirumcontinuousrating(MCR),
Nisthenumberofunitsrequiredtomeetthe
demand
Thisisnotapplicabletontwasteheatrecoveryboilers.
Note:generatorsofIWSPPPhaseIIareintegratedintothatof
IWSPPPhaseI.
7
PowerGeneration(OnlyforIWSPP)
N+1ofpowergeneratingtrains.
Nisthenumberoftrainsrequiredtosupplythe
Toensurecontinuityofoutputinthisscenario,N+1trainsareeachoperatedatreducedoutput,permittingrapidoutputincreaseifonetrips.
Note:PowergeneratorsofIWSPP
PhaseIIareintegratedintothatofIWSPPPhaseI.
8
Ejectors
ejectorswhichhaveahistoryoffrequentfailureinoperation.
A100%spareisrequired.
9
Filters
Liquidfilterssubjecttoroutinemaintenance.
A100%spareisrequired.
Gasfiltersincontinuousservice.
Aspareisnotrequired.
Tobeprovidedwithavalvedbypasstoallowmaintenancewithout
interruptingprocessflow.
InstrumentairfiltersatntBatteryLimit.
A100%spareisrequired.
10
LetDownStation(OnlyforIWSPP)
Aspareletdownvalveshallbeprovidedforeachpressurelevel.
ProjectManagementServicesforRabighPhaseIIPetrochemicalProjectSPARINGPHILOSOPHY
JGCJobCode:0-5361-20-0000
Doc.No.:
S-PM-G000-1222-0603<8>
PAGE
6
of6
Item
Equipment
Service
SparingRequirements
Notes
11
Package
Equipment
Aspareofwholepackagesisnot
required.
Individualitemswithinthepackage
shouldbespared,ifrequired.
12
PZVs
AllPZVsshallbesparedandatleastonespare
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 人教版整式課件
- 守株待兔動畫課件
- 員工心態(tài) 課件
- 第四單元(復(fù)習(xí))-二年級語文上冊單元復(fù)習(xí)(統(tǒng)編版)
- 西南林業(yè)大學(xué)《操作系統(tǒng)原理》2023-2024學(xué)年期末試卷
- 西京學(xué)院《融合新聞報道》2022-2023學(xué)年第一學(xué)期期末試卷
- 抗戰(zhàn)英雄家書
- 西京學(xué)院《基礎(chǔ)護理學(xué)》2023-2024學(xué)年第一學(xué)期期末試卷
- 西京學(xué)院《電氣控制技術(shù)與PLC》2021-2022學(xué)年期末試卷
- 西華師范大學(xué)《自然地理》2021-2022學(xué)年第一學(xué)期期末試卷
- 2024年新北師大版數(shù)學(xué)一年級上冊 第4單元 10以內(nèi)數(shù)加與減 第9課時 可愛的企鵝 教學(xué)課件
- 外研版(2019) 選擇性必修第四冊 Unit 5 Into the Unknown Understanding ideas教案
- 中班健康課件《認識五官》
- 2024~2025學(xué)年度八年級數(shù)學(xué)上冊第1課時 等邊三角形的性質(zhì)和判定教學(xué)設(shè)計
- 江西九江富和建設(shè)投資集團有限公司招聘筆試題庫2024
- 2024-2030年中國BPO行業(yè)發(fā)展分析及發(fā)展前景與趨勢預(yù)測研究報告
- 文明禮儀伴我行文明禮儀從我做起課件
- 人教版八上 2.2我的未來不是夢 教案
- 光伏消防演練方案及流程
- TCISA 415-2024 高爐本體數(shù)字孿生系統(tǒng)技術(shù)要求
- 醫(yī)美代運營合作協(xié)議書范本
評論
0/150
提交評論