參考文稿教案s pm g_第1頁
參考文稿教案s pm g_第2頁
參考文稿教案s pm g_第3頁
參考文稿教案s pm g_第4頁
全文預(yù)覽已結(jié)束

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)

文檔簡介

ProjectManagementServicesforRabighPhaseIIPetrochemicalProjectSPARINGPHILOSOPHY

JGCJobCode:0-5361-20-0000

Doc.No.:

S-PM-G000-1222-0603<8>

3of6

SCOPE

Thepurposeofthissparingphilosophyistoprovidedesignguidancefortheprovisionofsparefacilitiesandequipment.

Theobjectiveistheenhancementofthefollowingntoperationalfactors:

Safety

Reliability

Availability

Maintainability

Operability

DEFINITIONS

:AramcoOverseasB.V.andSumitomoChemicalCo..

APPLICABLEDRAWINGS,SPECIFICATIONS,ANDCODESANDSTANDARDS

ProjectSpecifications

S-PM-G000-1131-0007WaivingandClarificationProcedure

SaudiAramcoEngineeringStandards

SAES-J-600 PressureReliefDevices

DEVIATIONSANDCLARIFICATIONS

AnydeviationsorclarificationsfromthisspecificationrequireapprovalundertheWaivingandClarificationProcedure(S-PM-G000-1131-0007).

ORDEROFPRECEDENCEOFS

Theorderofprecedenceshallbe:

Thisspecification

Projectdrawingsandspecifications

ApplicableSaudiAramcoStandards

ApplicableInternationalCodesandStandards

GENERALSPARINGPHILOSOPHY

Stand-byequipmentwillbeprovidedforequipmentwhosefailurewouldadverselyaffecttheprocessproductiontargets(setoutinthebasisofdesignforeachunit)orthesafetyofthent.Equipmentwillalsobesparedwheneverthereisahighfrequencyofoperatingmaintenance;thisincludesequipmentinfoulingserviceaswellasequipmentrequiringspecificmaintenance.Thestand-byequipmentshallbeidenticaltotheoriginalequipment.Thestand-byequipmentshallbeconfigureda100%spareorN+1,asshowninTABLE1.Nmeansthenormaloperationequipmentnumberwhichcancover100%capacity.Thefollowingtableshowsthetotalequipmentcapacityincludingstand-byitem.Whereequipmentisnotessentialtotheprocessanddonotimpactoperations(e.g.certainfilters),onlyaby-passlinemaybeconsidered.

N

TotalEquipmentCapacityofN+1

TotalEquipmentCapacityofN+2

1

100%Duty+100%Spare=200%

100%Duty+2x100%Spare=300%

2

2x50%Duty+50%Spare=150%

2x50%Duty+2x50%Spare=200%

3

3x33%Duty+33%Spare=133%

3x33%Duty+2x33%Spare=165%

ProjectManagementServicesforRabighPhaseIIPetrochemicalProjectSPARINGPHILOSOPHY

JGCJobCode:0-5361-20-0000

Doc.No.:

S-PM-G000-1222-0603<8>

PAGE

5

of6

TABLE1GENERALSPARINGGUIDELINES

Item

Equipment

Service

SparingRequirements

Notes

1

Pumps

Pumpswhichhaveahistoryoffrequentfailureinoperation,

or

Pumpswhiayfailwhencalleduponcauseanunsafeconditionoftheinstallation,

jeopardisinglifeand/orequipment.

A100%spareisrequired.

Thesepumpsshallincorporateautomaticstartofthesparepump.

Pumpswhichoftenfailinoperation,or

Pumpswhichcancauseasevereprocessunitupsetwhenstartedup.

A100%spareorN+1ofpumpsisrequired.

Wheretwoservicescanpracticallyutiliseacommonsparethisisacceptable.

Otherpumpserviceswhichdonotfallintotheabovecategories.

Aninstalledspareisnotrequired.

Anon-installedspareshallbeprovided,unlessor

Licensor mendsotherwise.

2

Compressors

Compressorswhichhaveahistoryoffrequentfailureinoperation,

or

Compressorswhiayfailwhencalleduponcauseanunsafeconditionoftheinstallation,jeopardisinglifeand/or

equipment.

A100%spareisrequired.

Wheretwoservicescanpracticallyutiliseacommonsparethisisacceptable.

Compressorswhichoftenfailinoperation,or

Compressorswhichcancauseasevereprocessunitupsetwhenstartedup.

A100%spareisrequired.

Othercompressorserviceswhichdonotfall

intotheabovecategories.

Aninstalledspareisnotrequired.

Hydrotreaterrecyclecompressors

TobespecifiedbyLicensor.

However,prefersthe

centrifugaland driventypeCompressors.

Theexpectedprincipalcompressorsintheprocessunits.

TobespecifiedbyLicensor.

3

FansandBlowers

FansandBlowersincontinuousoperationwhichoftenfail,

or

FansandBlowerswhichcancauseasevereprocessunitupsetwhenstartedup.

A100%spareisrequired.

Wheretwoservicescanpracticallyutiliseacommonspare,thisisacceptable.

Item

Equipment

Service

SparingRequirements

Notes

4

Exchangerchangersincriticalandfoulingservice.

Aspareisrequiredifexchangerincriticalandfoulingserviceneedtobecleanedperiodicallyinlessthanexpectedshutdownintervalofbeingin

service.

Exchangersareusedintermittently(i.e.

coolersinsummer)

Aspareisnotrequired.

Tobeprovidedwithabypass.

5

Deaerators

(OnlyforIWSPP)

N+1ofdeaeratorsarerequired.

Nisthenumberofunitsrequiredto

meetumcontinuousBFWdemand.

6

Generators(OnlyforIWSPP)

N+1of generatorsarerequired.

The umcontinuouscredibledemandcanbemetwiththeone

largest generatorshutdown/tripped/outofserviceandnoneoftheothergeneratorsoperatingatabovetheirumcontinuousrating(MCR),

Nisthenumberofunitsrequiredtomeetthe

demand

Thisisnotapplicabletontwasteheatrecoveryboilers.

Note:generatorsofIWSPPPhaseIIareintegratedintothatof

IWSPPPhaseI.

7

PowerGeneration(OnlyforIWSPP)

N+1ofpowergeneratingtrains.

Nisthenumberoftrainsrequiredtosupplythe

Toensurecontinuityofoutputinthisscenario,N+1trainsareeachoperatedatreducedoutput,permittingrapidoutputincreaseifonetrips.

Note:PowergeneratorsofIWSPP

PhaseIIareintegratedintothatofIWSPPPhaseI.

8

Ejectors

ejectorswhichhaveahistoryoffrequentfailureinoperation.

A100%spareisrequired.

9

Filters

Liquidfilterssubjecttoroutinemaintenance.

A100%spareisrequired.

Gasfiltersincontinuousservice.

Aspareisnotrequired.

Tobeprovidedwithavalvedbypasstoallowmaintenancewithout

interruptingprocessflow.

InstrumentairfiltersatntBatteryLimit.

A100%spareisrequired.

10

LetDownStation(OnlyforIWSPP)

Aspareletdownvalveshallbeprovidedforeachpressurelevel.

ProjectManagementServicesforRabighPhaseIIPetrochemicalProjectSPARINGPHILOSOPHY

JGCJobCode:0-5361-20-0000

Doc.No.:

S-PM-G000-1222-0603<8>

PAGE

6

of6

Item

Equipment

Service

SparingRequirements

Notes

11

Package

Equipment

Aspareofwholepackagesisnot

required.

Individualitemswithinthepackage

shouldbespared,ifrequired.

12

PZVs

AllPZVsshallbesparedandatleastonespare

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

最新文檔

評論

0/150

提交評論