已閱讀5頁(yè),還剩1頁(yè)未讀, 繼續(xù)免費(fèi)閱讀
版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1 附 錄 A The Design of Pull Arm Garbage Truck 1The introduction of Pull Arm Garbage Truck Pull arm garbage truck is equipped with two types of chassis that has a trunk load and unloading functions to pull arm device-specific vehicles. It can be achieved with car trunk the combination and separation, while the bulk of the trunk to achieve self-unloading cargo operations. The model has been widely used in foreign countries, often in the domestic industry as a sanitation refuse collection vehicles. 5 t pull arm garbage truck is one of the commonly used models, compared to 8 t Arm pull over large tonnage trucks, the pull-arm device structure is relatively simple and easy to domestic Manufacturers; And large tonnage often imported pull arm device. Domestic Manufacturers producing 5 t pull the car pulling the boom arm structure of the device, although about the same, but the important structural parameters of the selection and design of different structural arrangement, it will directly affect the car performance 20 . 2 Pull the boom structure and principle of the device 2.1 The structural characteristics of pull-arm device 5 t pull arm garbage truck pulling device consists of pulling the boom arm and pull arm cylinder, the United Moving frame, trunk insurance hook and cylinder, and the frame. La Boom device structural arrangement shown in figure 2, pull telescopic arm is not used right-angle bend structure. the end of the cylinder and pull the piston rod side arm hinged on the hinge pivot B; Another linkage frame front end and hinged at the hinge pivot C, the formation of a rotary arm pull heart. Cylinder head cylinder arm pull side hinged front frame on the hinge pivot A; linkage frame hinged rear axle frame rear hinge pivot D, the formation of linkage rotary frame heart. Insurance linkage trunk rack hook set the hook cylinder and insurance cylinder. 2.2 The working principle of the device arm pull Pulling garbage truck arm by pulling the device to complete the function of two different dynamic, for boxes and dumping. When the pull device for boom box action, the 2 first cylinder insurance hook action open the trunk insurance hook, trunk lift insurance. Pull lift arm cylinder piston rod elongation from the pull arm, pull arm to pivot around the hinge C clockwise rotation, the hook arm to pull back move. If the frame is equipped with a trunk, the trunk was pushed home ground. When put on the frame, so that the first hook retractor trunk rings, and contraction of the piston rod, pull arm to hinge pivot counter-clockwise rotation axis C, will put on the flat trunk, the insurance cylinder hook action, pull carriages insurance hook fixed to the frame to the trunk. When the pull-arm device dumping action, and action for different box, trunk insurance hook dump in the whole process to ensure that tension in the arm and trunk are not isolated, that is pull arm、 the linkage through the trunk rack and trunk link between the insurance as one of the hook, by the deputy rear frame hinge pivot clockwise rotation axis D, lifting carriages lifted until the refuse rubbish. Trunk reset, as long as the retraction of cylinder piston rod pull arm, the pulling arm body still hinge pivot point D is the shaft counterclockwise rotation, until the trunk reset. 3 La Boom Selection and design of device structure parameters 3.1 Device to pull the boom pivot hinge arrangement and geometry of the main structure Determined by the following three areas: a. Arm by pulling a dump truck performance, it is 5 t pull the best selection of cars from the arm unloading chassis, the chassis can be selected according to the length of pull arm device to determine frame the total length. To ensure the car to pull arm for changing trunk and dumping action by the force of the chassis reasonable and complete the dumping arm pull action pivot hinge rotation axis D of the location should be arranged in behind the rear spring plate from the chassis rear bearing axis, the spacing is about 0 100 mm. b. According to the first hinge pivot D arm pull for me the beginning of the selected pivot hinge rotation axis C. In the design and production of the actual process of pulling the car arm in arm had appeared during the pull action although the initial state, pull arm lift carriages, failed to pull arm pivot around the hinge C rotation, but with the linkage frame with the rotation around the hinge pivot point D, which can not get trunk open the beginning of fall; when lifting a certain height, the action of gravity in the trunk, the hinge will pivot C a sudden fall, so pull arm, the linkage frame and carriages suddenly drop, resulting in relatively large; in hit, resulting in extremely unsafe for me a smooth action. To resolve this 3 problem, determine the hinge point C of the axis position is especially important. First the one hand, the horizontal axis of pivot C can not above the level layout of pivot D. In addition, by the hinge can pivot C stress analysis know, the hinge pivot axis of C must be below the level of tension hinge pivot arm cylinder head horizontal axis, while the hook arm pull-start action must be arranged in the vertical axis of the hinge pivot between C and the hinge pivot left foot. c. Important geometrical parameters arm pull a pull arm foot radius of gyration for pull the oil boom turning radius of the cylinder piston rod end of radius of gyration of the angle between the two radius. From the above points analysis we know that, The smaller of radius. The greater the force needed to pull the smaller cylinder arm. Meet the requirements under the premise of arms-for-me pull-foot turning radius, the smaller the better, La boom cylinder rod side radius of gyration R. The bigger the better as far as possible, so that can pull compact boom, operating small space 21 . 3.2 The selection of pull arm cylinder and cylinder installation angle y. The range of Determined by the following two aspects: a. By mapping method or analytical method to determine the location of the above the hinge pivot and Pull arm geometry and other components, may initially determine the pull-stroke arm cylinder and installation distance. b. Pull arm cylinder mounting angle of La Boom is the important structural parameters of devices. By the former knowledge, pull the boom box or device for carrying out the process of dumping action, pull the oil boom cylinders have to be overcome trunk (full load) resistance torque generated by gravity, and the lifting crane action start unloading boxes when the moment of resistance is the greatest moment of resistance to overcome, and in Boom began pulling action of the hinge pivot device static friction and inertia moment of resistance Maximum torque. So pull arm cylinder mounting angle y. From the previous analysis we know, when angle larger, the pull arm cylinder smaller maximum thrust required, select the pull arm cylinder bore can be smaller. By pulling in the boom cylinder is installed between the frame and trunk floor, oil cylinder installation layout space is limited, so the pull arm cylinder mounting angle range is also very limited. Design principles to children as much as possible to install a large angle, choose the right drawing arm oil pulling arm cylinder bore to meet performance requirements for the use of vehicles, without increasing the cost and fuel tank weight, and 4 easy layout. Analysis and comparison of some domestic manufacturers to produce 5 t pull arm ,the actual design and production of cars and trucks pulling arm experience, 5 t pull arm around the installation space vehicles between 250 300 mm, the general tension arm cylinder mounting angle should be Taken between 3 5 . 附 錄 B 拉臂式垃圾車(chē)設(shè)計(jì) 1拉臂車(chē)概述 拉臂式垃圾車(chē)是在二類汽車(chē)底盤(pán)上裝有使車(chē)箱具有裝載和卸載功能的拉臂架裝置的專用汽車(chē)。它可實(shí)現(xiàn)車(chē)箱與汽車(chē)的結(jié)合和分離,同時(shí)對(duì)車(chē)箱的散裝貨物實(shí)現(xiàn)自卸作業(yè)。目前該車(chē)型已在國(guó)外得到廣泛使用,在國(guó)內(nèi)也常作為環(huán)衛(wèi)行業(yè)的垃圾收集運(yùn)輸車(chē)。5 t拉臂式垃圾車(chē)是常用車(chē)型之一,相比 8 t以上的大噸位拉臂車(chē),其拉臂架裝置結(jié)構(gòu)較簡(jiǎn)單, 便于國(guó)內(nèi)廠家生產(chǎn);而大噸位拉臂車(chē)常采用進(jìn)口拉臂架裝置。國(guó)內(nèi)各生產(chǎn)廠家生產(chǎn)的 5 t拉臂車(chē)的拉臂架裝置的結(jié)構(gòu)雖大致相同,但重要的結(jié)構(gòu)參數(shù)的選用和結(jié)構(gòu)布置設(shè)計(jì)的不同,會(huì)直接影響拉臂車(chē)的工作性能。 2拉臂裝置的結(jié)構(gòu)和工作原理 2 1 拉臂架裝置的結(jié)構(gòu)特點(diǎn) 5 t拉臂式垃圾車(chē)?yán)奂苎b置主要由拉臂和拉臂油缸、聯(lián)動(dòng)架、車(chē)箱保險(xiǎn)鉤和保險(xiǎn)鉤油缸、以及副車(chē)架組成。拉臂采用的是不可伸縮的直角折彎式結(jié)構(gòu),其一端與拉臂油缸的活塞桿端鉸接于鉸支點(diǎn) B,另一端與聯(lián)動(dòng)架前端軸心鉸接于鉸支點(diǎn) C,形成了拉臂的回轉(zhuǎn)軸心。拉臂油缸的缸頭端鉸接在副車(chē)架 前端鉸支點(diǎn) A上;聯(lián)動(dòng)架后端軸心鉸接在副車(chē)架后部的鉸支點(diǎn) D,形成聯(lián)動(dòng)架的回轉(zhuǎn)軸心。聯(lián)動(dòng)架上設(shè)置了車(chē)箱保險(xiǎn)鉤和保險(xiǎn)鉤油缸。 2 2 拉臂架裝置的工作原理 拉臂式垃圾車(chē)通過(guò)拉臂架裝置完成兩種不同的功能動(dòng)作:換箱和傾卸。當(dāng)拉臂架裝置進(jìn)行換箱動(dòng)作時(shí),首先保險(xiǎn)鉤油缸動(dòng)作,開(kāi)啟車(chē)箱保險(xiǎn)鉤,車(chē)箱解除了保險(xiǎn)。拉臂油缸活塞桿伸長(zhǎng)舉起拉臂,使拉臂繞鉸支點(diǎn) c順時(shí)針回轉(zhuǎn),拉臂鉤就往后移動(dòng)。如果副車(chē)架上裝有車(chē)箱,則車(chē)箱被推置地上。當(dāng)?shù)厣宪?chē)箱要提上車(chē)架時(shí),使拉鉤先鉤住車(chē)箱吊環(huán),然后收縮活塞桿,使拉臂以鉸支點(diǎn) c為軸心逆時(shí)針回轉(zhuǎn),將車(chē)箱提上放 平后,5 保險(xiǎn)鉤油缸動(dòng)作,拉起車(chē)箱保險(xiǎn)鉤,使車(chē)箱固定在副車(chē)架上。當(dāng)拉臂架裝置進(jìn)行傾卸動(dòng)作時(shí),與換箱動(dòng)作不同,車(chē)箱保險(xiǎn)鉤在整個(gè)傾卸過(guò)程中要處在保證拉臂與車(chē)箱不分離,即拉臂、聯(lián)動(dòng)架及車(chē)箱通過(guò)車(chē)箱保險(xiǎn)鉤相互聯(lián)結(jié)為一體,以副車(chē)架后部鉸支點(diǎn) D為軸心順時(shí)針回轉(zhuǎn),舉升車(chē)箱直到卸去垃圾。車(chē)箱復(fù)位時(shí),只要拉臂油缸活塞桿回縮,整個(gè)拉臂機(jī)構(gòu)仍以鉸支點(diǎn) D為轉(zhuǎn)軸點(diǎn)逆時(shí)針回轉(zhuǎn),直至車(chē)箱復(fù)位。 3拉臂架裝置結(jié)構(gòu)參數(shù)選用與設(shè)計(jì) 3 1拉臂架裝置各鉸支點(diǎn)的布置及主要結(jié)構(gòu)幾何尺寸 按以下三方面確定: a因拉臂車(chē)具有傾卸工作性能,故 5 t拉臂 車(chē)最好選用自卸底盤(pán),可根據(jù)所選定的底盤(pán)長(zhǎng)度,確定拉臂架裝置副車(chē)架的總長(zhǎng)度。為了保證拉臂車(chē)進(jìn)行換箱和傾卸動(dòng)作時(shí)底盤(pán)受力合理,拉臂完成傾卸動(dòng)作的回轉(zhuǎn)鉸支點(diǎn) D的軸線位置應(yīng)布置在距底盤(pán)后輪彈簧鋼板后支座軸線的后部,間距約為 0 100mm。 . b根據(jù)鉸支點(diǎn)
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 打架保證書(shū)告別沖動(dòng)珍愛(ài)生命
- 下滑成績(jī)的悔過(guò)保證書(shū)
- 苗木采購(gòu)合同范本格式格式
- 短期借款合同
- 防火重于泰山生命高于一切
- 生鮮雞蛋買(mǎi)賣(mài)協(xié)議
- 城市更新拆遷補(bǔ)償
- 飼料購(gòu)銷半年合同
- 電信服務(wù)合同法律適用規(guī)定
- 惠州二手房買(mǎi)賣(mài)合同簽訂步驟
- 小學(xué)二年級(jí)道德與法制上冊(cè)《家鄉(xiāng)物產(chǎn)養(yǎng)育我》教學(xué)教案
- 吊籃安裝合同范文
- 【甲乳外科-甲狀腺-課件-幻燈】超聲引導(dǎo)下甲旁亢熱消融治療
- 軟件開(kāi)發(fā)項(xiàng)目的監(jiān)理規(guī)劃
- 送教上門(mén)情況記錄表送教活動(dòng)記錄六篇.doc
- 戴煒棟英語(yǔ)語(yǔ)言學(xué)概論Chapter 1
- 2020年廣東省中考數(shù)學(xué)試卷
- 廣東省義務(wù)教育階段學(xué)生學(xué)籍卡
- 小區(qū)會(huì)所經(jīng)營(yíng)方案(開(kāi)業(yè)投資分析)
- 加氣混凝土砌塊施工方法
- 銷售冠軍團(tuán)隊(duì)銷售職場(chǎng)培訓(xùn)動(dòng)態(tài)PPT
評(píng)論
0/150
提交評(píng)論