精益生產(chǎn)工具(英文PPT22_第1頁(yè)
精益生產(chǎn)工具(英文PPT22_第2頁(yè)
精益生產(chǎn)工具(英文PPT22_第3頁(yè)
精益生產(chǎn)工具(英文PPT22_第4頁(yè)
精益生產(chǎn)工具(英文PPT22_第5頁(yè)
已閱讀5頁(yè),還剩17頁(yè)未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、Tenants of Single Piece Flow Do Not Make Defects Do Not Pass Along Defects Do Not Accept DefectsZero Defects = 0 Defects Not 3.4ppmQuality, Quality, QualityDefects are the Worst Kind of Waste 7 Types of Waste Defective Parts Over Production Inventory Motion Transportation Waiting Manual TouchesBatch

2、Single Piece FlowFrom: The Toyota Production SystemBuilding Quality into the ProcessSingle Piece FlowThe next process is the customer never send defects ! Sample Inspect catches Defect too Late When you Finally Find a Defect How many more do you have? Where are they in the process? What is the root

3、Cause? Single Piece Flow catches Defects immediately When you find a Defect You only have one You know where it occurred You Can find/Resolve the Root Cause immediatelyCheck, Do, VerifyCheck - The previous operators work.Do - Your work.Verify - That you did your work correctly.ProcessInspectTranspor

4、tTransportation is integrated into the production processvia automation e.g., moving lineProcessInspectProcessInspectTransportProcessInspectTransportation is integrated into the production processvia human conveyance e.g., Chaku-ChakuBuilding Quality into the Process2 ways to perform SPFThe next pro

5、cess is the customer never send defects !Check, Do, VerifyGets you into Parts Per Million quality-When you verify your work, you catch 1 flaw in 100 parts. The next person checks your work and can catch 1/100 so thats 1/10,000. Then that person Verifies their work and can catch 1/100. Thats 1/1,000,

6、000 errors that can get through. Check, Do, VerifyEvery Customer in a Process has:- a right to expect perfect material- an obligation to inspect the material before use.- an obligation to inform the previous step in the process of any problem.- an obligation to stop the process until any problem has

7、 been resolved.Single piece or one piece flow is a means to primarily buildQuality into the process. This is achieved by establishing a taktTime, developing std work, and swip. The premise is that an Operator can only work on one piece at a time, and performs a Quick quality check on the CTQs of the

8、 process before movingThe part to the following process. If a defect is detected, JidokaIs enactedthe line is stopped, and immediate action is takenTo remediate the situation and take countermeasures to preventreoccurence1. Takt time2. Std workFlow: work (process) that is done in conjunction with or

9、 simultaneous to transportationOne Piece Flow The production is organized into a synchronous chain where each person has a balanced amount of work relative to his/her supplier and customer in the chain. As one person finishes their element, so do all. Work is then moved down the line synchronously.

10、Every person is empowered to stop the production process if a reject is spotted.OrganizationAreaSupervisorNew / RevPageofDateProduction LinePart NumberPart NameOperatorStandard Work SheetTo:TurnsDPUsScope of OperationsFrom:Quality CheckSafety PrecautionStandard Work-in-Process# Lots of Standard Work

11、-in-ProcessTakt/Rate TimeTotal Manual & Travel TimeMan/Travel TimeOperatorEnd FinishWeldEnd FinishWeldOrbital WeldHydro TestMarkMech.CleanTorchBrazeTubingCFM CellFern BissonnetteCell 6All PartsAll Tubes1 1Mech.CleanRaw materialWeld100/DayFPIX-RayEDM2nd Qtr. 01EndFinishOutside Cell27 - avg lot =

12、6FlexFinished GoodsACTION WORKOUTgGEMS Global Production SystemThe next process is the customer never send defects !Check, Do, VerifyOne Piece Flow Your customer is the next step in the process. Give to your customer, exactly what they need ( 1 item), exactly when they need it, done perfect every ti

13、me.Tenants of 1 pcs Flow Do Not Make Defects Do Not Pass Along Defects Do Not Accept DefectQuality, Quality, QualityDefects are the Worst Kind of WasteSystem of manufacturing in which the final process withdraws the parts it needs from the precedingprocess at exact timing intervals, in the exact sta

14、ndardized amount needed.Pull Production Methodology & SequenceDefinitionRef Material Presentation training for explanation on Supermarket definition and useEnd FinishWeldEnd FinishWeldOrbital WeldHydro TestMarkMech.CleanTorchBrazeMech.CleanFlexEnd FinishWeldEnd FinishWeldOrbital WeldHydro TestMa

15、rkMech.CleanTorchBrazeMech.CleanFlexParts13456End FinishWeldEnd FinishWeldOrbital WeldHydro TestMarkMech.CleanTorchBrazeMech.CleanFlexEnd FinishWeldEnd FinishWeldOrbital WeldHydro TestMarkMech.CleanTorchBrazeMech.CleanFlex789102Assembly LineCell or Chaku-Chaku lineSupplierMaterialInformationSupermar

16、ketEmpty containerFull containerLegend1Sequence / TimingPull Production Methodology & SequenceJITJidokaeGPS for GPCHeijunkaLevel LoadingSequencingFinding a balance between the volume of work that your organization needs to do and your capacityAdjusting a production schedule to meet unexpected ch

17、anges in customer demandOrdering the production in such a fashion to achieve the desired TAKT for all itemstaken from memory JoggerLeveled production meanslowering the peaks amongthe daily production volumesas much as possible and making the production flow smooth and unflucuating. In general, the m

18、ore fluctuations you in the production flow, the more muda you end up having. That is because the capacity and capability of a line tends to be set at a level that meets the peak production demand rather than the average demand. If the production line produces only a single product, you may be able

19、to reduce muda simply by adjusting the production schedule and staffing level. But if you want to produce consistently at an average level where you have many different kinds of products to produce in a single line, you have to do the averaging not just in volume but in kinds as well. This way of av

20、eraging both volume and in kinds is called production leveling or heijunka in Japanese.Leveled ProductionAmount of products that can be soldHEIJUNKAAverage by total volumeAverage by model Leveled Load Production Build to forecast Build to FG inv Build after order is received ALL components need to b

21、e stocked in RM An order from these products takes precedence over 1-2-3 products build this first !Use StocksBuild StocksTAKT0102030405060708090% F1F1F1F1F1F1F2F2F2F2F2F2 TAKT TimeDetermined by PSI2Q3Q4QOk to Build to FGRepeatable ProductsNon-Repeatable Products350300250Total65310663986688777108761

22、08951210104403025380705021701501301200220012000350300250Total6531066398668877710876108951210104403025380705021701501301200220012000Need to Determine . . .How Much20 bulbs per dayWhat Kind15/60 Watts 5/100 WattsWhen5 -60W, 2 100W, 5 60W,2 200W, 5 60W, 1 100W TAKTLevel Load MixLevel Load SequenceIf we

23、 were making light bulbs. . . QuarterlyWeeklyWeeklyFrequency6060606060100 1006060606060100 1006060606060100Takt Time = Operating time per dayProduction requirement per dayAssumptions:1)Machine Breakdown = 0 hour2)Setup Change = 0 hour3)Defect Rate = 0%Takt Time EquationFor more information on TAKT R

24、efer to JIT SectionQuick ExampleSetting the production sequence of multiple TRAM RAC Types (Med Systems Product)ProductMonthlyRequirementDailyRequirementTAKT TimeModel 1720 units24 units5 minModel 2360 units12 units10 minModel 3360 units12 units10 minTotal1440 units48 units7.5 minThis is data for 3

25、products, Model 1, Model 2, and Model 3, are produced at GEMS. The chart displays the monthly production level, the daily production level (monthly divided by 30), and the Takt time for each product type.THEY ARE ALL PRODUCED ON THE SAME LINE.How can these units be built in a level production mode u

26、sing this example? Model 1Model 2Model 3Detailed Example Since these three products are on the same line, you will need to follow the sequence pattern of 1-2-1-3 in your production mix. By doing it this way you are able to level-load your production both in terms of quantity and types.# 1 Prod 1 # 4

27、 Prod 3# 2 Prod 2# 3 Prod 1REPEATMixed Assembly LineProduction Sequence by Type0246810Prod 1Prod 2Prod 3ProductTakt Time0246810121416Prod 1/Prod 2Prod 1/Prod 3ProductsTakt TimeProd 3Prod 2Prod 1If produced in batches, only the Model 1s will meet Takt timesIf produced to a sequence, 2 units will be p

28、roduced in 2 Takt timesLets show how we validate thisModelLine TaktTakt/Cycle GraphPart - QuantityPart Router13See Std Work Combo Sheet for example. One sheet is created for each operatorAdd RailsAdd BackplAdd 1 SpringAdd 3 SpringAdd CircuiAdd CircuiAdd CircuiAdd CircuiAdd RAC2 Add RAC 4 A

29、dd RAU Add RAU Apply Label Apply Label Apply Label Aqpply Label 1XXXXXXXXX2XXXXXXXXX3XXXXXXXXXXSort By Volume02000400060008000100001233123413571946234524682833289434563579385545675678678982489991Part NumberQuantity00.81PercentageSCT=25SCT=40SCT=30766676138127.597.5Step No.Operation NameTime

30、ManualAutoTravelProduction ReqdTakt/Rate TimeManualAutoTravelWaitOrganizationAreaSupervisorNew / RevPageofDateProduction LinePart NumberPart NameOperatorStandard Work Combination SheetTotalsOperation TimeSec ( ) Min ( ) Hr ( ) 112/6/02AMXShannonX-RayStation 1 & 2J. David1234567Check MotorIssue D

31、HRInstall Gen. HousingInstall ClipsInstall Term. StripInstall/Wire LatchJumper Wire to Filter10203040506070809074T/T32105641032546463040XStep No.Operation NameTimeManualAutoTravelProduction ReqdTakt/Rate TimeManualAutoTravelWaitOrganizationAreaSupervisorNew / RevPageofDateProduction LinePart NumberP

32、art NameOperatorStandard Work Combination SheetTotalsOperation TimeSec ( ) Min ( ) Hr ( ) 112/6/02AMXShannonX-RayStation 1 & 2J. David1234567Check MotorIssue DHRInstall Gen. HousingInstall ClipsInstall Term. StripInstall/Wire LatchJumper Wire to Filter10203040506070809074T/T32105641032546463040X

33、Step No.Operation NameTimeManualAutoTravelProduction ReqdTakt/Rate TimeManualAutoTravelWaitOrganizationAreaSupervisorNew / RevPageofDateProduction LinePart NumberPart NameOperatorStandard Work Combination SheetTotalsOperation TimeSec ( ) Min ( ) Hr ( ) 112/6/02AMXShannonX-RayStation 1 & 2J. Davi

34、d1234567Check MotorIssue DHRInstall Gen. HousingInstall ClipsInstall Term. StripInstall/Wire LatchJumper Wire to Filter10203040506070809074T/T32105641032546463040XTakt Build Time= # of Operations * TaktActual Build Time=SCT130230330125240330ModelTBTModelABT1-52+1030ModelObjectives:Produce to Takt Time (understanding no 2 products will have the exact same ABT)The sum of the DTot is zeroEvery product is produce at least onceNo product is produced twice in a rowCreate a pro

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論