1、外文文獻:Risk Analysis of the International Construction ProjectBy: Paul Stanford KupakuwanaCost Engineering Vol. 51/No. 9 September 2021ABSTRACTThis analysis used a case study methodology to analyse the issues surrounding the partial collapse of the roof of a building housing the headquarters of the St

2、andards Association of Zimbabwe (SAZ). In particular, it examined the prior roles played by the team of construction professionals. The analysis revealed that the SAZs traditional construction project was generally characterized by high risk. There was a clear indication of the failure of a contract

3、or and architects in preventing and/or mitigating potential construction problems as alleged by the plaintiff. It was reasonable to conclude that between them the defects should have been detected earlier and rectified in good time before the partial roof failure. It appeared justified for the plain

4、tiff to have brought a negligence claim against both the contractor and the architects. The risk analysis facilitated, through its multi-dimensional approach to a critical examination of a construction problem, the identification of an effective risk management strategy for future construction proje

5、cts. It further served to emphasize the point that clients are becoming more demanding, more discerning, and less willing to accept risk without recompense. Clients do not want surprise, and are more likely to engage in litigation when things go wrong.KEY WORDS:Arbitration, claims, construction, con

6、tracts, litigation, project and riskThe structural design of the reinforced concrete elements was done by consulting engineers Knight Piesold (KP). Quantity surveying services were provided by Hawkins, Leshnick & Bath (HLB). The contract was awarded to Central African Building Corporation (CABCO) wh

7、o was also responsible for the provision of a specialist roof structure using patented “gang nail roof trusses. The building construction proceeded to completion and was handed over to the owners on Sept. 12, 1991. The SAZ took effective occupation of the headquarters building without a certificate

8、of occupation. Also, the defects liability period was only three months .The roof structure was in place 10 years before partial failure in December 1999. The building insurance coverage did not cover enough, the City of Harare, a government municipality, issued the certificate of occupation 10 year

9、s after occupation, and after partial collapse of the roof .At first the SAZ decided to go to arbitration, but this failed to yield an immediate solution. The SAZ then decided to proceed to litigate in court and to bring a negligence claim against CABCO. The preparation for arbitration was reused fo

10、r litigation. The SAZs quantified losses stood at approximately $ 6 million in Zimbabwe dollars (US $1.2m) .After all parties had examined the facts and evidence before them, it became clear that there was a great probability that the courts might rule that both the architects and the contractor wer

11、e liable. It was at this stage that the defendants lawyers requested that the matter be settled out of court. The plaintiff agreed to this suggestion, with the terms of the settlement kept confidential .The aim of this critical analysis was to analyse the issues surrounding the partial collapse of t

12、he roof of the building housing the HQ of Standard Association of Zimbabwe. It examined the prior roles played by the project management function and construction professionals in preventing/mitigating potential construction problems. It further assessed the extent to which the employer/client and p

13、arties to a construction contract are able to recover damages under that contract. The main objective of this critical analysis was to identify an effective risk management strategy for future construction projects. The importance of this study is its multidimensional examination approach.Experience

14、 suggests that participants in a project are well able to identify risks based on their own experience. The adoption of a risk management approach, based solely in past experience and dependant on judgement, may work reasonably well in a stable low risk environment. It is unlikely to be effective wh

15、ere there is a change. This is because change requires the extrapolation of past experience, which could be misleading. All construction projects are prototypes to some extent and imply change. Change in the construction industry itself suggests that past experience is unlikely to be sufficient on i

16、ts own. A structured approach is required. Such a structure can not and must not replace the experience and expertise of the participant. Rather, it brings additional benefits that assist to clarify objectives, identify the nature of the uncertainties, introduces effective communication systems, imp

17、roves decision-making, introduces effective risk control measures, protects the project objectives and provides knowledge of the risk history .Construction professionals need to know how to balance the contingencies of risk with their specific contractual, financial, operational and organizational r

18、equirements. Many construction professionals look at risks in dividually with a myopic lens and do not realize the potential impact that other associated risks may have on their business operations. Using a holistic risk management approach will enable a firm to identify all of the organizations bus

19、iness risks. This will increase the probability of risk mitigation, with the ultimate goal of total risk elimination .Recommended key construction and risk management strategies for future construction projects have been considered and their explanation follows. J.W. Hinchey stated that there is and

20、 can be no best practice standard for risk allocation on a high-pro or for that matter, any project. He said, instead, successful risk management is a mind-set and a process. According to Hinchey, the ideal mind-set is for the parties and their representatives to, first, be intentional about identif

21、ying project risks and then to proceed to develop a systematic and comprehensive process for avoiding, mitigating, managing and finally allocating, by contract, those risks in optimum ways for the particular project. This process is said to necessarily begin as a science and ends as an art .Accordin

22、g to D. Atkinson, whether contractor, consultant or promoter, the right team needs to be assembled with the relevant multi-disciplinary experience of that particular type of project and its location. This is said to be necessary not only to allow alternative responses to be explored. But also to ens

23、ure that the right questions are asked and the major risks identified. Heads of sources of risk are said to be a convenient way of providing a structure for identifying risks to completion of a participants part of the project. Effective risk management is said to require a multi-disciplinary approa

24、ch. Inevitably risk management requires examination of engineering, legal and insurance related solutions .It is stated that the use of analytical techniques based on a statistical approach could be of enormous use in decision making . Many of these techniques are said to be relevant to estimation o

25、f the consequences of risk events, and not how allocation of risk is to be achieved. In addition, at the present stage of the development of risk management, Atkinson states that it must be recognized that major decisions will be made that can not be based solely on mathematical analysis. The comple

26、xity of construction projects means that the project definition in terms of both physical form and organizational structure will be based on consideration of only a relatively small number of risks . This is said to then allow a general structured approach that can be applied to any construction pro

27、ject to increase the awareness of participants .The new, simplified Construction Design and Management Regulations (CDM Regulations) which came in to force in the UK in April 2007, revised and brought together the existing CDM 1994 and the Construction Health Safety and Welfare (CHSW) Regulations 19

28、96, into a single regulatory package. The new CDM regulations offer an opportunity for a step change in health and safety performance and are used to reemphasize the health, safety and broader business benefits of a well-managed and co-ordinated approach to the management of health and safety in con

29、struction. I believe that the development of these skills is imperative to provide the client with the most effective services available, delivering the best value project possible.Construction Management at Risk (CM at Risk), similar to established private sector methods of construction contracting

30、, is gaining popularity in the public sector. It is a process that allows a client to select a construction manager (CM) based on qualifications; make the CM a member of a collaborative project team; centralize responsibility for construction under a single contract; obtain a bonded guaranteed maxim

31、um price; produce a more manageable, predictable project; save time and money; and reduce risk for the client, the architect and the CM.CM at Risk, a more professional approach to construction, is taking its place along with design-build, bridging and the more traditional process of design-bid-build

32、 as an established method of project delivery.The AE can review the CMs approach to the work, making helpful recommendations. The CM is allowed to take bids or proposals from subcontractors during completion of contract documents, prior to the guaranteed maximum price (GMP), which reduces the CMs ri

33、sk and provides useful input to design. The procedure is more methodical, manageable, predictable and less risky for all.The procurement of construction is also more business-like. Each trade contractor has a fair shot at being the low bidder without fear of bid shopping. Each must deliver the best

34、to get the projec. Competition in the community is more equitable: all subcontractors have a fair shot at the work .A contingency within the GMP covers unexpected but justifiable costs, and a contingency above the GMP allows for client changes. As long as the subcontractors are within the GMP they a

35、re reimbursed to the CM, so the CM represents the client in negotiating inevitable changes with subcontractors.There can be similar problems where each party in a project is separately insured. For this reason a move towards project insurance is recommended. The traditional approach reinforces adver

36、sarial attitudes, and even provides incentives for people to overlook or conceal risks in an attempt to avoid or transfer responsibility. A contingency within the GMP covers unexpected but justifiable costs, and a contingency above the GMP allows for client changes. As long as the subcontractors are

37、 within the GMP they are reimbursed to the CM, so the CM represents the client in negotiating inevitable changes with subcontractors.There can be similar problems where each party in a project is separately insured. For this reason a move towards project insurance is recommended. The traditional app

38、roach reinforces adversarial attitudes, and even provides incentives for people to overlook or conceal risks in an attempt to avoid or transfer responsibility. It was reasonable to assume that between them the defects should have been detected earlier and rectified in good time before the partial ro

39、of failure. It did appear justified for the plaintiff to have brought a negligence claim against both the contractor and the architects.In many projects clients do not understand the importance of their role in facilitating cooperation and coordination; the design is prepared without discussion betw

40、een designers, manufacturers, suppliers and contractors. This means that the designer can not take advantage of suppliers or contractors knowledge of build ability or maintenance requirements and the impact these have on sustainability, the total cost of ownership or health and safety .This risk ana

41、lysis was able to facilitate, through its multi-dimensional approach to a critical examination of a construction problem, the identification of an effective risk management strategy for future construction projects. This work also served to emphasize the point that clients are becoming more demandin

42、g, more discerning, and less willing to accept risk without recompense. They do not want surprises, and are more likely to engage in litigation when things go wrong.中文譯文:國際建立工程風(fēng)險分析保羅 斯坦福 庫帕庫娃娜工程造價卷 第五十一期 2021年9月9日摘要此次分析用實例研究方法分析津巴布韋標(biāo)準(zhǔn)協(xié)會總部SAZ的屋頂局部坍塌的問題。特別是,它審查了建立專業(yè)隊伍發(fā)揮的事先作用。分析顯示,津巴布韋標(biāo)準(zhǔn)協(xié)會總部的傳統(tǒng)建筑工程普遍具有

43、高風(fēng)險的特點。一個明顯失敗的跡象,是由原告所聲稱的承包商和建筑師們在預(yù)防和/或緩解可能發(fā)生的建立問題上是失敗的。推斷在局部屋頂坍塌之前兩者之間的缺陷應(yīng)該及早發(fā)現(xiàn)并及時糾正是合理。原告有理由對承包者和建筑師雙方帶來的疏忽索賠看來是符合情理的。風(fēng)險分析,通過多方位方法分析建立問題的決定性查問,使有效風(fēng)險管理策略對失敗建立問題的鑒定容易。越強調(diào)效勞的重點,委托方的要求越來越高,挑剔越來越多,并不太愿意承受沒有賠償?shù)娘L(fēng)險。委托方不想要驚喜,并且當(dāng)事情出現(xiàn)問題更可能去訴訟。關(guān)鍵詞:仲裁,索賠,建立,合同,訴訟,工程和風(fēng)險加強的混凝土構(gòu)件的構(gòu)造設(shè)計由KP咨詢工程師設(shè)計。工料測量效勞由HLB提供。該合同授予

44、非洲中心建筑公司CABCO,該公司也負(fù)責(zé)提供采用專利的“四人幫釘屋架屋頂構(gòu)造。建筑建立完工后,于1991年9月12日移交給業(yè)主。津巴布韋標(biāo)準(zhǔn)協(xié)會總部實際承受了對沒有占有證書的總部房屋的占有。另外,不合格責(zé)任期只有3個月。屋頂構(gòu)造在1999年12月局部坍塌前已經(jīng)用了10年。該房屋并不在保險范圍內(nèi),哈拉雷城市,一個政府自治區(qū), 10年之后下發(fā)了占有證書,并且是在局部屋頂坍塌之后。起初津巴布韋標(biāo)準(zhǔn)協(xié)會總部決定去仲裁, 但未能產(chǎn)生一個即時的解決方法。津巴布韋標(biāo)準(zhǔn)協(xié)會總部然后決定在法庭上進展對簿,并且因為非洲中心建筑公司的疏忽向非洲中心建筑公司索賠。準(zhǔn)備為仲裁再次訴訟。津巴布韋標(biāo)準(zhǔn)協(xié)會總部的量化損失大約

45、為600萬津巴布韋幣折合120萬美元。所有當(dāng)事人都已檢查了這個事實,并且在他們證明之前,很明顯有一個很大的可能那就是法院也許裁定建筑師和施工方都有責(zé)任。正是在這個階段,被告的律師請求將這個問題達(dá)成庭外和解。原告同意了這項建議,并同意對和解的條款保密。此項重要分析的目的是圍繞住房標(biāo)準(zhǔn)分析津巴布韋協(xié)會總部房屋的局部屋頂坍塌問題。此項分析調(diào)查了工程管理的作用和建立專業(yè)人士在預(yù)防/緩解潛在的建立問題中發(fā)揮的重要作用。它進一步對雇主/承包方和當(dāng)事人在建立合同下彌補損害賠償進展了評估。這種重要的分析的主要目的是確定一種未來建立工程風(fēng)險管理的有效策略。這項研究的重要性在于它多方面的審查方式。經(jīng)歷說明,一個工

46、程的參與者以自己的經(jīng)歷為根底也能夠很好的識別出風(fēng)險。僅采用建立在過去的經(jīng)歷和判斷的根底上的風(fēng)險管理方法,可以很好地并合理地在穩(wěn)定的低風(fēng)險環(huán)境中工作。在有變化的地方這是不可能有效的。這是因為需要改變以往的經(jīng)歷推斷,這可能會產(chǎn)生誤導(dǎo)。所有建立工程都在一定程度上暗示原型和改變。建筑行業(yè)本身的變化說明,過去的經(jīng)歷是不可能自行足夠的。一個構(gòu)造化的方法是必需的。這種構(gòu)造不能,并且絕對不能取代參與者的經(jīng)歷和專業(yè)知識。相反,它帶來額外的好處,幫助澄清了目標(biāo),確定了不確定性的性質(zhì),介紹了有效的溝通制度,提高了決策,介紹了有效的風(fēng)險控制措施,保障了工程目標(biāo)和提供了風(fēng)險教訓(xùn)知識。建筑專業(yè)人員需要知道如何用他們具體的合同,財務(wù),業(yè)務(wù)和組織需求平衡不可預(yù)見的風(fēng)險。許多建筑專業(yè)人士鼠目寸光的看個人的風(fēng)險,并且沒有意識到其他相關(guān)的風(fēng)險可能對他們的業(yè)務(wù)產(chǎn)生潛在影響。用全面的風(fēng)險管理方法,能使一個公司確定該組織的業(yè)務(wù)的所有風(fēng)險。用總風(fēng)險排除的最大目標(biāo),會增加減輕風(fēng)險的概率。為未來的建筑工程推薦的關(guān)鍵建立風(fēng)險策略已經(jīng)被考慮,并且它們的解釋如下。Hinchey J.W.聲稱在一個高利潤的工程中不可能存在風(fēng)險分配問題的最正確實踐標(biāo)準(zhǔn),任何工程都是這樣的。他說,相反的,成功的風(fēng)險管理是一種心態(tài)也是一個過程。根據(jù)Hinchey,對一個特定的工程,理想的心態(tài)的當(dāng)事人及其代表者,首先在

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論