空氣源熱水器英文說明書_第1頁
空氣源熱水器英文說明書_第2頁
空氣源熱水器英文說明書_第3頁
空氣源熱水器英文說明書_第4頁
空氣源熱水器英文說明書_第5頁
已閱讀5頁,還剩30頁未讀 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、實(shí)用標(biāo)準(zhǔn)方案 Thank you for your using air source water heater series 5. Product products. Please read instruction book before use and keep and model record the machine it for future reference. Please Structure-serial number on the warranty card. 300L. 200L、Adaptive Model Number: JN-100L、150L、- Catalog 6.

2、Outdoor Circuit 1. Diagram- Cautions-7. Care and -Maintenance- and 2. Performance 8. Simple Trouble Features- Self-examination- Performance 3. 9. Warranty Parameter- card-Operation 4. - Instructions- - 精彩文檔實(shí)用標(biāo)準(zhǔn)方案 Cautions1.2. Performance and Features Thanks for your purchasing our products, please n

3、ote the following points: Air source water heater is usually used in the places of family house, a. Read this instruction book carefully before installation! bathing spot and hotel. The main advantages as follows: Wiring Rule;b. It shall be installed follow the rule of National Energy Conservation C

4、ompare with general water heater, it holds c. Power socket shall be triplex receptacle with safe ground wire lowest operation costs. It is lower than electrical solar water and match with the machine plug. The content shall no less than 2 heater in the whole year. machine near the shall rated machin

5、e current. The socket be times of ? Environment Protection Free from contamination. It use new and in the place of plug reached. type refrigerant that zero emission onto ozonosphere. Besides maximum circuit It shall use special branch that 2 times than more d. that, it does not make any excreta. cus

6、tomer value to the maximum of match current. rated The wire shall ? All-weather Does not be influenced by bad weather such as disconnection use. all-pole suitable The circuit shall hold overcast and rainy and snow. It could normal be used among protector (1.5-2 times more than rated current. -1043.

7、It works effectively in dry and wet places with e. The display board shall be installed in the shade dry place. Intelligent defrost system. f. Keep the water tank full before the power socket is connected at ? Reliable Quality Use well known best quality special the first time. Please do not close t

8、he water valve at the time of compressor, food grade stainless steel tank. It could be used normal use or it will not make the water outlet. for more than 15 years under normal use. g. Do not set over heated water as you would like to. As the water ? Safety Real completely separated water from elect

9、ricity; . You should mix the cool water with temperature reach to the 55? Convenient Easy installation and smaller floor space. It hot water for being scalded (especially old man and children); could be installed in a suitable places and content the h. Do not install and move the machine by yourself

10、. All works shall requirement of customers. be done by professional install workers. be trouble the As i. not will the customers, by made company responsible for it. 精彩文檔 實(shí)用標(biāo)準(zhǔn)方案 floor temperature or higher than ceiling temperature and make the ceiling “ and water temperature between “floor temperatu

11、re” Model No. Fault Cause Fault Display Open circuit on water tank test line or outside Show “OPE”machine test line outside or tank on water test line Short circuit SHR”“Show machine test line Communication failures between display panel DropShow “”and outside control board Show Machine electric lea

12、kage leakage”“temperature the settled time, machine During Alarm on defrosting reach settled to the not failures could temperature. defrosting 8. Simple Trouble Self-examinationSolution Fault Cause Symptom Check up on both Main power does not incoming line and air be connected switch does panel Comp

13、ressor does The control key ”“Press the ONnot open not work Fault code on Check follows the code drive-by-wire table controller Clean the heat Dust on heat Can not reach to interchanger; improve interchanger, the the setting the environment; check ambient temperature temperature for on leakage point

14、, is too cold, long time supplement some refrigerant is heating. refrigerant discharged Check on incoming line Main power does not and air switch be connected No words on the display panel and wire signal on Check Poor contact on Date one Year in From Month PurchasinGuarantee Month year is valid g d

15、ate time Year Store Tel name Address Zip. Customer Tel Name Address Zip. Repair Problem & Date fees free/not Part you exchanged: Guarantee Charging free Method Card Repair Repair Method: free/not Guarantee Part you exchanged: Charging free Method Card Repair Method: Repair People wire. (Note: point

16、JN-100L-30W JN-150L-30W loose JN-200L-40W connected JN-300L-40W Tank Volume(L) 100 Either fan or 150 200 Replace fan or 300 Heat Speed(L/h) Fan can not work Name 75 capacitance Wiring harness is 75 is broken Job 95 capacitance Keep the line be 95 Max Leaving ) Water Temp (Zip Code 60loose connected

17、Phone Number Power 220V/50Hz Frame screw loose screw down screw Input Rated Power (W) Big noise as the machine work 940 Some copper pipes touched each other in 1280 1280 Check on the copper pipes 2000 Bearing Tank Pressure 0.6Mpa the machine ) Temp Range( 43 -10 Weight Tank (kg) 26 36 46 65 Tank Out

18、 Size 4801074 4801514 5701300 1835570Machine Weight (kg) 27 36 36 45 Out Machine Size 790*255*540 790*255*540 790*255*540 790*255*540 Suited People 13 24 24 Above 4 3. Performance Parameter Note: Heat water compensation speed is tested in the condition inlet water temperature, 55of 20 Wet-bulb tempe

19、rature, 20leaving water temperature. This list parameter is for reference only. Detail parameter is subject to the machine brand. 4. Operation Instructions water the Display: the controller shows a. Temperature , it will show the outside temperature in the tank. Press “”temperature. to ON/OFF machin

20、e. As in the conditions b. ON/OFF: Press “”. ”, “defrostingof ON, it shows “heat”, “heat insulation” while the machine is power off. Whenever the “OFF”It shows present present time and condition is, it always shows the temperature. temperature ”Temperature Setting: Press “S and get into the c. press

21、 shows the “ceiling temperature”, condition. setting As it , 1“” to raise the “” or “” to change value (press than “” for more press “” to fall down 1; hold “” or again ”raise Press and fall down quickly). “Sit 0.5 second, will ”temperaturetemperature. floor temperature setting method follows ceilin

22、g and the , the hour part will be shining, ”?“d. Time setting: press setting back from finished, As setting press “” once go again to again ?press “”“adjust “” or to the press part; hour condition. It will begin to work as the temperature lower than the 精彩文檔 實(shí)用標(biāo)準(zhǔn)方案 “to adjust the minutes part, once

23、again to finish. ”press to ”M and shift “Automatic”e. Operating Mode Setting: Press “water the model, it will control ”“Economic”. Under the “Automatic ”temperature according to the pre-setting. Under the “Economicmodel, only make the water hot in the pre set time. for ”?“f. Work Period under Econom

24、ic Model Setting: hold the “”?2 seconds and set three heat period as screen shows. (“is used for switch the project, is used for “” or value change). If you do not need so many setting period, you could start time . If the ”on “00:00finish time make the start time and is later than finish time, it w

25、ill consider that the finished time is on the next day. For example: if you set the one of the period is ”03:30, the machine will consider the period “”“on 22:00 to start from 22:00 and finish in 3:30 next day. 5. Product Structure 精彩文檔實(shí)用標(biāo)準(zhǔn)方案 6. Outdoor Circuit Diagram (Fig 1) change! allowed to not

26、 Non-professionals Note: are 精彩文檔實(shí)用標(biāo)準(zhǔn)方案 regularly. ? As the machine has some informal noise, you should power off it 7. Care and Maintenance and contact the professionals. Healthy Symptom The symptom as follows does not mean something had happened to the machine: a. For the compressors defective fun

27、ction, the machine does not start for 3 minutes. b. There is some condensed water discharged from the outdoor machine. c. Some noise in the machine. As the machine worked, there is some bicker or sizzle noise. It is a normal noise from refrigerant. d. For safety valves pressure relieve function, the

28、 valve will discharge some water to relieve as the water tank get overpressure. Alarm on high higher than ceiling. The temperature is 10 temperature For long time work, there is some dust on heat interchanger ? aluminum foil. It shall be brushed with water regularly or it amount have would effect gr

29、eat there absorption. heat on As are of dust, please let professionals clean. Check the connect end is leak or not regularly. Please contact ? the professionals to repair it if it is leak. not plug, is wire the ?Check well wire and socket is or connected 精彩文檔實(shí)用標(biāo)準(zhǔn)方案 water and the four-way valve loop

30、is or four-way valve loop main machine broken blows hot wind Wiring harness is Keep the line be Note: 1. The test or disconnect failure will be solved as both test and communication are recovered. 2. The high temperature alarm will be discharged as the water temperature drop to the normal. 3. There

31、are some ways to solve the problem of defrosting failure as followed a) The outdoor machine temperature is higher than defrosting start temperature. b) Press “” key to close the machine. fittings signal wire Replace four-way valve Four-way valve or Can not make hot 精彩文檔實(shí)用標(biāo)準(zhǔn)方案 Factory Number Purchase

32、 price b. Customer Info Address 9. Warranty card cardWarranty Note: please tear out this part and send it to us as follow requirement (copy original reserve (Please send affiliatedcard to us and the here of is invalid) card) from customers release our order to keep service promise and In Please fill

33、 this warranty card and send us the affiliated card as soon as computer company in info we worries, will establish customer file our system. possible. Please complete the warranty card and send our the affiliated ? card in one month Please fill this warranty card and send us the affiliated card as s

34、oon as If the original card or purchasing proof is missing, you could ?possible. Zip Code: look up your customer info file and get some related service. Address Products Info a. After service Department Purchase Place Purchase date Model. No. 精彩文檔實(shí)用標(biāo)準(zhǔn)方案 : Products Factory NO Type No. Number Name War

35、ranty card (Reserve the original card) customers. proof for card is a clear To shops: this warranty ?The sales should write down the warranty card for customers and give it to customers. free repair during warranty period. Customers To customers: ?should keep the card. Please note that maybe there a

36、re some conditions about exchange parts or goods. NO: Products Factory Type No. People Number Name Date one Year in Month From PurchasinGuarantee Month year is valid g date time Year Store Tel name Address Zip. Customer Tel Name 精彩文檔實(shí)用標(biāo)準(zhǔn)方案 Zip. Address Instructions Repair Problem & Date fees a. Main

37、 Machine Installation Site b. Main Machine Installation Steps c. Temperature Hold Box Site d. Temperature Hold Box Installation Steps e. Heat Connecting Hose Installation f. Leakage Checking on Connecting Host g. Connections of Circuits h. Test Running g. Remove air source Thank you for your using a

38、ir source water heater series products. Please read instruction book before use and keep it for future reference. 1. Installation Instructions 300L. 、200L150LAdaptive Model Number: JN-100L、Catalog a. Main Machine Installation Site (1) As the main machine was installed on the wall or roof, the place

39、Installation 1. they installed shall be made of solid brick, concrete or other 300kg/m2. than more load shall place install main The place. strength 精彩文檔實(shí)用標(biāo)準(zhǔn)方案 it for future reference. Keep it upright and level. Adaptive Model Number: JN-100L、150L、200L、300L. (2) The install face shall made of wood o

40、r metal that has enough Catalog firm. smaller (3) The space between main machine and not obstacles shall 1. Installation than the space showed in (Figure 1) Instructions (4)If you install the canopy, please note that it shall not block a. Main Machine Installation Site and dissipation of the main ma

41、chine heat absorption b. Main Machine Installation Steps (5) The space between main machine and water tank will not longer c. Temperature Hold Box Site host). limitation connection on main are 2.5m than (there some length d. Temperature Hold Box Installation Steps b. Main Machine Installation Steps

42、e. Heat Connecting Hose Installation there that ensure customer (1)Directinstallation(With permission, f. Leakage Checking on Connecting Host is no leak in expanded hole)g. Connections of Circuits (a) Mapping the space between the outside installation holes. Mark h. Test Running the pre-installed pl

43、ace. g. Remove air source Dig 4 M12.5 holes by impact drivers (b) Fix the outside machine by M8 steel setscrew. (c) Thank you for your using air source water heater series products. Please read instruction book before use and keep 精彩文檔實(shí)用標(biāo)準(zhǔn)方案 ? Note the discharge of condense water (2) Use A-frame to

44、fix a) Make sure the frame position according to the outside machine base 1. Installation Instructions hole b) Dig 4 14.5 holes by impact drivers a. Main Machine Installation Site c) fix the frame with 4 M10150 setscrew. Semmetry installation of place or on the wall roof, the installed the (1) As ma

45、in machine was frame other made of solid brick, concrete or they installed shall be d) Fix the outside machine with 4 M8 hexagon nipples. 300kg/m2. place. strength The main install than load more place shall (3) Dig 70 host hole between water storage tank and outside machine Keep it upright and leve

46、l. group. Outside hole shall be slopes downward a little (as Figure 2 firm. (2) metal or that enough has wood made The install face shall of shows) and wear it coat on the wall hole. (3) The space between main machine and obstacles shall not smaller than the space showed in (Figure 1) (4)If you inst

47、all the canopy, please note that it shall not block and dissipation of the main machine heat absorption (5) The space between main machine and water tank will not longer host). connection on length are 2.5m than (there some limitation main b. Main Machine Installation Steps there customer (With (1)D

48、irectinstallationpermission, ensure that is no leak in expanded hole)(a) Mapping the space between the outside installation holes. Mark the pre-installed place. (b) Dig 4 M12.5 holes by impact drivers (Fig 2) (c) Fix the outside machine by M8 steel setscrew. Note During Direct installation: c. Tempe

49、rature Hold Box Site: It shall be permitted by customers ?1)The tank shall be installed 2.5m far from main machine. It could It will not be leak from the expanded hole ?indoor. installed be also and roof balcony, outdoor on installed be 精彩文檔 實(shí)用標(biāo)準(zhǔn)方案 floor of with the method storage tank shall be inst

50、alled water 2) The 2 . If the stand. Install place shall be firm and could load 500kg/mfloor is not flat enough, it shall be installed with hang wall. 3) The storage shall be pre-addressed tap-water pipe and hot water pipe interface, and set a valve on water inlet. d. Temperature Hold Box Installati

51、on Steps inlet water in the place of valve 1) Please install the safety relief to the water connecting outside steel tank), the other end of safety relief valve is connect with water tap pipe, make storage tank connect with hot water pipe. Do follow with (Fig 3) (Fig 3) 2) Open water tap inlet valve

52、. Open any hot water tap in hot water pipe. Fill it till the water overflowed. Close the hot water tap and test it to ensure it is not leak. Note: keep it full of water. Keep the water inlet open. e. Heat Connecting Hose Installation 1) Keep all connecting hose, control wire, twin core test wire and

53、 relief valve plastic belted by plastic keep warm belt and keep them 70 tube hole. go through 精彩文檔實(shí)用標(biāo)準(zhǔn)方案 2) Screw off the end socket nut of tank connecting hose. screw connect interface plug screw, make the end 3) Get out the socket to the tank taps (firstly keep the copper hose aim to interface and

54、 then lock the screw.) Do as Fig 4 shows. (Fig 4) 4) Put plastic hose over pressure relief opening of safety relief related Dig two control wire with display panel. Connect valve. the deep holes and fix the display panel with setscrew 5) Unscrewing the end socket nut of disconnecting valve and triple valve. Screw the connecting hose to disconnecting valve and triple valve. Tight them. Fig 5 Fig 5 f. Leakage Checking on Connecting Host: 1) Ensure the pipe is corrected connected. three valve and

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論