1、烏干達(dá)國(guó)家標(biāo)準(zhǔn)局施工組織設(shè)計(jì)一、編制講明 Explanation to the Compilation 1二、工程概況 Project Profile 2三、施工預(yù)備 Preparations for the Commencement2四、工程組織治理機(jī)構(gòu) The Project Administration Organization 7五、土建局部要緊施工方法 The Main Construction Method for the Ci vil Work 8七、安裝局部要緊施工方法 Main working plan for installation 24八、季節(jié)性施工措施 Working
2、 plan for seasonality 32九、質(zhì)量保證措施 Quality guarantee measurement 34 十、工期保證措施 The steps for time limitation guarantee 38 十一、平安生產(chǎn)措施 Security Production Measurement40 十二、現(xiàn)場(chǎng)文明施工措施 Field civilization working measures 48 十三、環(huán)境衛(wèi)生保護(hù)措施 Sanitation protectin measures 49 十四、施工總平面布置圖 The layout of the jobsite 51 十
3、五、附圖附表 The figure and attached list 53一、編制講明 Explanation to the Compilation1.1 編制原那么 The Principles of the Compilation本施工組織設(shè)計(jì)只是按照業(yè)主所提供的資料以及結(jié)合現(xiàn)場(chǎng)條件、工程 特點(diǎn)進(jìn)行編制的,著重于施工方案、技術(shù)措施、施工治理措施、施工形象 進(jìn)度打算、現(xiàn)場(chǎng)平面布置、機(jī)械設(shè)備及人員組織機(jī)構(gòu)配置、施工中的重點(diǎn) 難點(diǎn)技術(shù)措施的編制。The present proposal, with a view to the bidding stage, is made and based o
4、n the technical specifications stated in the tender documents. It is concentrated in the execution plan, technical and management measures, progress scheme, site layout, machines and equipments, labor forces, site management organization and measures to be taken for the main and diffi cult work exec
5、ution. It is only a proposal made to comply with the proje ct drawings and the details stated in the bidding documents. This compan y will compile one complete and detailed execution schedule based on the Project characteristics and design demands1.2 編制依據(jù) Gist for the Compilation 本工程按照烏干達(dá)國(guó)家標(biāo)準(zhǔn)局工程招標(biāo)文件
6、、設(shè)計(jì)圖紙、結(jié)合現(xiàn)場(chǎng)條 件及工程特點(diǎn)進(jìn)行編制; The compilation in accordance with bidding instr uction, design drawing, site condition and the characteristic of project for Ungada National Bureau Of Standards Administration Block Project.二、工程概況 Project Profile 本工程為新建工程,工程位于:烏干達(dá)坎培拉市區(qū)。總使用面積為 48 26 m2 ,新建建筑占地面積約 1000 m2 。新建建
7、筑地下室一層, 地上最高 五層,建筑高度為 22.4 米。由烏干達(dá)政府投資興建,由 Arch Forum Ltd 公司設(shè)計(jì)??偣て跒?307 天。三、施工預(yù)備 Preparations for the Commencement3.1 現(xiàn)場(chǎng)預(yù)備 Site Preparation3.1.1 按施工現(xiàn)場(chǎng)平面布置圖搭建生產(chǎn)和生活臨時(shí)設(shè)施 ,做好現(xiàn)場(chǎng)臨時(shí)施 工道路、施工用水電的布置、現(xiàn)場(chǎng)污水、雨水排放明溝,現(xiàn)場(chǎng)平安防護(hù)設(shè) 施搭建等工作。 Set up the temporary facilities for site production and life as per the site layout.
8、 Prepare well the temporary access, water and powe r, sewage disposal, rain water discharge and the safety protection facilities and etc. for the commencement.3.1.2 布置好現(xiàn)場(chǎng)的工程概況牌、平安生產(chǎn)標(biāo)志牌、勞動(dòng)紀(jì)律牌等“一 圖五牌。Set up at the site the two charts and six boards: the project pla te, safe production marks, work disc
9、iplines board and etc.3.1.3 組織施工人員進(jìn)場(chǎng) ,并做好各項(xiàng)教育工作。 Organize the work forc e, move into the site and do well educational work and others.3.2 施工技術(shù)預(yù)備 Preparations for execution techniques 施工技術(shù)預(yù)備的要緊內(nèi)容 ,能夠歸納為以下四個(gè)方面 :一是組織圖紙會(huì) 審;二是編制開工前的各項(xiàng)方案、措施;三是進(jìn)行工程定位,開展施工測(cè) 量;四是完成技術(shù)、檢驗(yàn)機(jī)制的建立。其具體內(nèi)容是: The main thing in this re
10、gard are the following four parts: study and examine the drawings; work out the schedules for the commencement; start the project location a nd surveying work; establish the mechanism of the technique identification and quality inspection. The details are:及時(shí)組織技術(shù)人員 ,預(yù)算員認(rèn)真熟悉施工圖紙 ,參與圖紙會(huì)審和技 術(shù)交底 ; Timely
11、 organize the technicians and quantity surveyors to get fa miliar with all the drawings. They shall participate in the drawings studyi ng and examining, and explain all the technical details.編制施工圖預(yù)算和月旬作業(yè)打算 ,提供材料的需要量打算 ; Work o ut the project budget and the schedules for monthly and 10-days site w or
12、k, and also the materials supply plan.3.2.3 商請(qǐng)建設(shè)單位組織移交、規(guī)劃紅線、座標(biāo)、標(biāo)高等; Consult wit h the Client to hand over the site, plot lines, bench marks and levels, et c.3.2.4 組織專業(yè)技術(shù)人員進(jìn)行模板和鋼筋的翻樣工作 ; Organize the pro fessional technicians to work out shop drawings for all the moulding boar d and steel work.3.2.5
13、做好各種進(jìn)場(chǎng)材料的質(zhì)量檢驗(yàn)等預(yù)備工作。 Do a good job in ch ecking all those materials to be brought into the site and concrete mix pr eparations.326按照工程施工需要,結(jié)合外圍電網(wǎng)的情形和市政供水管網(wǎng)的情形, 進(jìn)行施工用電用水設(shè)計(jì)。Work out the consumption schedule for the waterand power needed for the project as per the requirements of the project execution a
14、nd the status of electricity grid and city water supply.3.3要緊機(jī)械設(shè)備、周轉(zhuǎn)材料及勞動(dòng)力資源配備 Preparations of Major mechanical equipments, cycling materials and work forces按照本工程的施工規(guī)模及結(jié)構(gòu)形式,為了順利快速地完本錢工程,交 付給業(yè)主早日投產(chǎn)使用,擬投入的機(jī)械設(shè)備及勞動(dòng)力詳下表。As per the project scale and structural formation and in order to smoothly complete t
15、h e execution so as to hand over to the client for the early operation, it is proposed to allocate of the following equipments and labor forces as the form listed below:要緊施工機(jī)械和材料一覽表Major Machines and Materials for the Project序號(hào)S.No名稱Descriptio ns型號(hào)Model數(shù)量Q 單位Unit用電量/臺(tái)(KW) PowerCon sumpti on進(jìn)場(chǎng)安排Date
16、to bringin1挖掘機(jī)Excavator1輛Unit2.82砼攪拌機(jī)Con crete MixerJZC5001臺(tái)Unit5.53砂漿拌和機(jī)Mortar MixerUJ2001臺(tái)Unit2.24龍門吊2臺(tái)Unit5鋼筋切斷機(jī)Cutti ng M/CGQ-401臺(tái)Unit36鋼筋彎曲機(jī)Ben di ng M/CGW-401臺(tái)Unit37電焊機(jī)Weldi ng M/CBX1-5005臺(tái)Unit23.48輸送泵Tran sfer PumpHBT60-13-9051臺(tái)Unit909圓盤鋸Disc SawMJ1062臺(tái)Unit5.510插入式振搗器VibratorsHZ6X-5010臺(tái)Unit1.
17、511平板振動(dòng)器PlateCompactorPZ-5011臺(tái)Unit0.512鏑燈Dysprosiumlamp4盞Unit13水準(zhǔn)儀water levelS31臺(tái)Unit14全站儀Total Stati onJ21臺(tái)Unit15柴油發(fā)電機(jī)diesel-drive ngen erator12V135AD1臺(tái)Unit3.4勞動(dòng)力資源配備 Labor Forces勞動(dòng)力安排一覽表Labor Forces List序號(hào)S.No.工種名稱Trade數(shù)量Number單位unit備注 Remarks1泥工Mason20人 person2木工 Carpenter25人 person按實(shí)際3鋼筋工Rebar m
18、an20人 person開工日4架子工 Scaffolder5人 person期連續(xù)5電工 Electrician8人 person進(jìn)場(chǎng)6龍門吊司機(jī)2人 personEn ter7砼工 Un skilled Labor10人 personthe site8管道工pipeliner6人 personas per the9電焊工 electric welding6人 personrequireme nts10油漆工 pain ter2人 personon site11鉚工 riveter1人 person四、工程組織治理機(jī)構(gòu) The Project Administration Organizat
19、ion4.1 現(xiàn)場(chǎng)工程部機(jī)構(gòu)的設(shè)置 The setting for site project department or gani zati on、工程經(jīng)理部組織機(jī)構(gòu)框圖The frame for project department organi zati on施工組織機(jī)構(gòu)框圖決策層The block diagram for site organization工程經(jīng)理部V!/采理41.2 工程經(jīng)理部職能:工程經(jīng)理部對(duì)工程施工中的各項(xiàng)工作進(jìn)行指 揮、調(diào)度、治理和和諧。The project department function: each item work is commanded, co
20、n trolled, managed and coordinated in the construction of the project.41.21 工程經(jīng)理部的決策層: 由工程經(jīng)理、工程副經(jīng)理、 總工組成, 對(duì)本工程行使打算、組織、和諧、操縱、監(jiān)督和指揮調(diào)度職能。The Project decision layer: be made up of project manager, vice-proj ect manager and general engineer. This layer function is make plan, organ ization, coordination,
21、supervision and control, command.41.22 工程治理層:在工程經(jīng)理的領(lǐng)導(dǎo)下,由各職能模塊負(fù)責(zé)人組 成,對(duì)工程質(zhì)量、技術(shù)、平安、本錢等進(jìn)行全過(guò)程的具體治理和和諧操縱。The Project management layer: be made up of department principal.This layer function is specific management and coordination control for q uality, technology, safety, cost of the entire project process
22、.41.2 3 工程作業(yè)層:由具有熟練操作技能和操作體會(huì)的工人組成, 工程實(shí)施中明確施工目標(biāo)、責(zé)任和義務(wù)。The Project implementation layer: be made up of workers who have skilled operation and operation experience.五、土建局部要緊施工方法 The Main Construction Method for the Ci vil Work5.1 施工工藝流程 Technological Process for Site Execution5.1.1 根底及地下室施工工藝流程 Technolo
23、gical process for site execut ion of tPAGE8PAGE8PAGE8PAGE8PAGE8PAGE8PAGE8PAGE8PAGE8PA GE8PAGE8PAGE8PAGE8PAGE8PAGE8PAGE8PAGE8PAGE8PAGE8PAGE8 PAGE8PAGE8PAGE8PAGE8PAGE8PAGE8PAGE8PAGE8PAGE8PAGE8PAG E8PAGE8PAGE8PAGE8PAGE8PAGE8PAGE8PAGE8PAGE8PAGE8PAGE8P AGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAG
24、E 9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9PA GE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9 PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAG E9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9P AGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE 9PAGE9PAGE9PAGE9PAGE9PAGE9PA
25、GE9PAGE9PAGE9PAGE9PAGE9PA GE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9PAGE9tthefoundation and lower ground floor.1、根底底板施工順序 The foundation slab construction sequence 清理基坑T墊層T彈線T底板筋T墻、柱插筋T校正含預(yù)留、預(yù)埋 T混凝土澆搗T養(yǎng)護(hù)。Clear foundation pitblinding cloumn marking put wall an d column rebar rectificationfirst fix cast c
26、oncretAcuring2、條基和柱基 Strip foundation and Cloumn base測(cè)量放線 砼墊層 測(cè)量彈線 根底鋼筋綁扎 根底立模 根底澆筑砼 預(yù)埋管線 回填土、平坦場(chǎng)地。Setting out Plain concrete blinding measure and snapline instal l the rebar of foundation install the formwork of foundation cast f oundation concrete first fix pipe lay in the foundation wall backfill
27、, level the site3 地下室結(jié)構(gòu)施工順序 The construction sequence for lower ground floor structure彈線分中墻柱鋼筋綁扎支模含支模架墻、柱混凝土 梁支模架梁底板梁鋼筋梁側(cè)模梁澆筑澆板頂混凝土 水電預(yù)留 預(yù)埋。Snapline fix reinforcement for columns and walls install form work for column cast concrete for walls and columns install formw ork for beam beam baseplate fix
28、reinforcement for beam install t he section formwork for beam cast concrete for beam cast conceret e for slab.first fix within slab5.1.2 主體施工工藝流程 Technological process for site execution of su b-structure、現(xiàn)澆鋼筋混凝土柱施工順序 The construction sequence for col umn base測(cè)量彈線T搭設(shè)柱支模架T柱縱向鋼筋綁扎連接T柱操縱標(biāo)高測(cè)設(shè)T 綁扎柱筋T設(shè)置混凝
29、土墊塊T預(yù)留預(yù)埋件埋設(shè)T柱底清洗沖掃T質(zhì)量檢查 T作好隱藏工程記錄T柱模板安裝固定校正T澆灌柱混凝土T拆模T養(yǎng) 護(hù)。Measure and Snapline T install the formwork for column T column longtidunal steel fixing T control level measure and set for column T fix reinforcement for column T install the concrete padT first fix T cl ear the base of column T quality ins
30、pection T remove pre-buried items T intall the formwork for column and check T cast concrete for column T remove the formwork T curing.、現(xiàn)澆鋼筋混凝土墻施工順序 The construction sequence for wa ll分中彈線T校正鋼筋位置T焊接定位鋼筋T清洗混凝土接頭T搭設(shè)操 作架T安裝墻板T側(cè)模板T綁扎鋼筋T安預(yù)埋件和鋼筋保護(hù)層墊塊作好隱藏記錄T安裝另一側(cè)模板T模板固定及校正質(zhì)量檢查T拆模養(yǎng)護(hù)。Snapline T check the pos
31、ition of rebarT welding rebar T clea n the concrete joints T install the handing frameT install the formwork for wall T install the rebar T frist fix within wall and watch out for hidden items T install the formwork for the other side T quality inspection T remove the formwork T curing.5.1.2.3 現(xiàn)澆混凝土
32、梁施工順序 The construction sequence for beam 操縱標(biāo)高測(cè)設(shè)T搭設(shè)支模架T鋪設(shè)梁底模T綁扎梁暗梁鋼筋安裝梁模板T質(zhì)量檢查T作好隱藏記錄T測(cè)設(shè)板面操縱點(diǎn)標(biāo)高T澆水潮濕模板 T澆灌混凝土T養(yǎng)護(hù)。Measure and set the con trol level 宀 in stall the support for formwork in stall the formwork for beam bottom in stall the rebar for beam quality inspection watch out for hidden item measur
33、e and set cont rol level for slab watering the formwork cast the concrete main tenance.5.2 要緊分局部項(xiàng)工程施工方法 The Method for the Main Items5.2.1 土方工程 The Earth Work 本工程根底要緊為獨(dú)立根底和擋土墻板 ,根底尺寸和砼量大 ,強(qiáng)度等級(jí)高,施工工序多 ,技術(shù)復(fù)雜 ,質(zhì)量要求高 ,工期緊迫 ,因此要求做好施工前期預(yù)備 工作 ,采取有效的技術(shù)組織措施 ,確保根底施工快速優(yōu)質(zhì)地完成 ,為上部結(jié)構(gòu) 盡快施工制造條件。The foundation of th
34、is project mainly consists of independent foundat ion and retaining wall. The concrete volume of the foundation work is co nsiderably large. The strength level is high, the working procedures are n umerous, the techniques are complex, high qualities are required and the t ime is pressing. So it is n
35、ecessary to do well the pre-construction prepara tions, and to adopt effective technical and organizational measures so as t o ensure the foundation work to be completed soonest possible with high qualities and thus creating favorable conditions for the super structures execution.5.2.1.1 土方開挖采納反鏟挖掘機(jī)
36、和人工修整相結(jié)合 ,挖土方向順序按循 環(huán)式順序。The excavation will be done by excavators and manual trimming. Th e excavation will be done in a way of orderly cycle.521.2機(jī)械挖土深度宜操縱在設(shè)計(jì)墊層底標(biāo)高上20CM,嚴(yán)禁挖深擾動(dòng)持力層 ,剩余局部由人工進(jìn)行修整 ,關(guān)于土質(zhì)情形與地質(zhì)勘察報(bào)告不符時(shí)或 顯現(xiàn)意外情形時(shí) ,及時(shí)與建設(shè)單位、設(shè)計(jì)單位聯(lián)系并進(jìn)行處理。 The excavat ion will be controlled as 20cm higher than the
37、 blinding bottom level and then the rest will be done manually. And the bearing layer of the soil isnever to be removed. We will get in touch timely with the Client, the d esigning institute in case that the soil conditions do not comply with thos e in the soil investigation report or any accidents
38、happen.521.3回填土進(jìn)行場(chǎng)內(nèi)堆土,堆土坡腳至坑邊距離不小于 3m。The soil for backfill will be piled up at site and the edge of the pile should be a way from the foundation pit less than 3 meters.基坑挖好后 ,應(yīng)及時(shí)邀請(qǐng)?jiān)O(shè)計(jì)單位 ,監(jiān)理單位等有關(guān)人員進(jìn)行驗(yàn) 收,驗(yàn)收合格后 ,及時(shí)進(jìn)行下道工序的施工。 It is imperative to invite those f rom the designing institute, the supervisor
39、 and other related units to check the work as the excavation of the foundation pit is completed. The follo wing work can not be started until the result of the said check is ok.5.2.1.5 土方回填 The Backfilling :根底工程終止后 ,邀請(qǐng)業(yè)主、監(jiān)理等 單位進(jìn)行驗(yàn)收 ,合格前方可進(jìn)行回填。根底內(nèi)外回填應(yīng)同時(shí)平均進(jìn)行,防止產(chǎn)生不平均側(cè)向荷載 .并夯打密實(shí)。 We will invite the supe
40、rvisor and quality control unit to check the foundation work when the same is done. When the check gives ok, the backfill is to be carried out. The backfilling shall be done simultaneously both in and out of the foundation pit to avoid fr om the uneven side load. And compaction is made well.5.2.2 模板
41、工程 The Moulding board Work5.2.2.1 模板必須尺寸準(zhǔn)確 ,板面平坦 ;具有足夠的承載力。 剛度和穩(wěn)固性 , 能可靠地承當(dāng)新澆筑砼的自重和側(cè)壓力 , 以及在施工中所產(chǎn)生的荷載 ;構(gòu)造 簡(jiǎn)單,裝拆方便 ,并便于鋼筋的綁扎 ,安裝和砼的澆筑 ,養(yǎng)護(hù)等要求。在滿足起 重量要求 ,施工便利和經(jīng)濟(jì)條件下 ,應(yīng)盡可能擴(kuò)大模板面積 ,減少拼縫。 The di mensions of the moulding board shall be correct and surfaces even, havin g sufficient bearing capacity, rigidity
42、 and stability to reliably bear the wei ght of the concrete newly cast and its side pressure, and other load durin g the execution. The moulding board should be easy to be fit and disman tle. The moulding board work shall facilitate the reinforcement steel to be bound and fit, the concrete cast and
43、curing. The moulding board work s hall be made economically to the extent to satisfy the lifting demand and to reduce the joints with largest possible area.5.2.2.2 模板體系的選用應(yīng)按照工程的特點(diǎn)按以下方面進(jìn)行選擇 :一是選 擇的模板體系要先進(jìn) ,合理,適用 ;二是能用效操縱工程質(zhì)量 ,使結(jié)構(gòu)到達(dá)清水 砼的成效 ;三是降低本錢少投入??傊C合考慮經(jīng)濟(jì)性 ,適用性,選擇科學(xué) , 合理的模板體系。要加大背楞和對(duì)拉螺栓的設(shè)計(jì) ,保證其剛度
44、 ,其可周轉(zhuǎn)的次 數(shù)低于鋼模板。 The moulding board work system is selected and decided as the following: firstly it should be advanced, reasonably economic and applicable; secondly, it should be of help in control the project quality a nd of benefit to the effect of fair face for the main structure; thirdly, it i
45、s low in cost with less investment. All in all, we have to consider theeconomics and applicability and thus adopt the scientific and reasona ble form work system. It is imperative to improve the design of the wash ers and the counter bolts so as to ensurethe rigidity of the form but the cycles less
46、than steel moulding boar d.5.2.2.3 模板支模前必須搭好有關(guān)腳手架 ,澆筑砼前必須檢查支撐是否可 靠 ,扣件是否松動(dòng)。澆筑砼時(shí)必須由模板支設(shè)班組設(shè)專人看模 ,隨時(shí)檢查支撐 是否變形 ,松動(dòng),并組織及時(shí)復(fù)原。經(jīng)常檢查支設(shè)模板吊鉤 ,斜支撐及平臺(tái)連接 處螺栓是否松動(dòng) ,覺察咨詢題及時(shí)組織處理。 Scaffolds shall be mounted tig htly before doing the form work. Before casting, it is imperative to check all the support if they are stro
47、ng, and if the clips and clamps are proper ly tightened. When casting, those who have made the moulding board wo rk have to be on the spot and watch the ongoing form work, check the s upports now and then to see if there any movable or deformed, and men d in time if needed.It is also imperative to f
48、requently check the crane ho ok, and see if the bolts and nuts are loose between the slant supports an d the platform. Timely removal is needed if any happens.在支模時(shí)現(xiàn)澆鋼筋砼梁 ,當(dāng)跨度等于或大于 4M 時(shí), 模板應(yīng)起拱; 當(dāng)設(shè)計(jì)無(wú)具體要求時(shí),起拱高度宜為全跨長(zhǎng)度的1/1000-3/3000。When making the form work for RCC beam and slabs and their spans are mor
49、e th an 4 meters, the arch shall be made. If there is no specific requirement, t he height of the arch shall be 1/1000-1/3000 length of the span.拆模時(shí)不得使用大錘或硬撬亂搗 ,如果撤除困難 ,可用撬杠從底部 輕微橇動(dòng) ;保持起吊時(shí)模板與墻體的距離 ,保證砼外表及棱角不因撤除受損 壞。 When removing the form, neither big hammer is used nor other unrea sonable ways. If
50、it is difficult to remove the form, claw bar may be appl ied gently at the bottom. Proper distances shall be maintained between th e form and the walls when lifting so as to ensure no breaks made to the concrete faces, edges and corners.5.2.3 鋼筋工程 The Reinforcement Steel Work5.2.3.1 對(duì)進(jìn)場(chǎng)鋼筋必須認(rèn)真檢驗(yàn) ,檢驗(yàn)內(nèi)
51、容包括查對(duì)標(biāo)志 ,外觀檢查 ,并 按現(xiàn)行國(guó)家有關(guān)部門標(biāo)準(zhǔn)的規(guī)定抽樣復(fù)試合格前方可使用。在保證設(shè)計(jì)規(guī) 格及力學(xué)性能的情形下 ,鋼筋外表必須清潔無(wú)損害 ,不得帶有顆粒狀或片狀 鐵銹、裂紋、強(qiáng)疤、折疊、油漬和漆污等,鋼筋端頭保證平直,無(wú)彎曲。 對(duì)經(jīng)調(diào)直處理鋼筋加箍筋等 ,應(yīng)搭設(shè)棚架 ,集中碼放 ,防雨淋銹蝕。其它鋼筋應(yīng) 架空分規(guī)格碼放 ,其架空高度不小于 10CM。 It is a must to check and test the reinforcement steel brought into site. The checking shall be made incl uding: to ch
52、eck its marks, outlook and take random samples to be tested as per the present state standards. The steel can only be used until the c heck is ok. The surface of the steel shall be clean and no damage on the conditions that the specifications and mechanics are ensured. Besides, the re shall be no ru
53、st, no scales, no cracks, no collapse, no paint, no oil an d etc. The end of the steel bar shall be straight and even without any be nd. The hut shall be set up for those steel bars already straightened or b ound with stirrups, and pile them up to avoid from rain and becoming ru sted.The other steel
54、 bars shall be kept as per their diameters and be supp orted with the bottom height no less than 10cm.鋼筋在加工前應(yīng)潔凈 ,無(wú)損害 ,油漬,漆污和鐵銹等應(yīng)在使用前清 理潔凈。 Before fabricating, the steel bars shall be cleaned without any da mage. Paint stains and rust shall be cleaned up before using.為保證鋼筋加工形狀 ,尺寸準(zhǔn)確 ,可制作鋼筋加工的定型卡具操縱 鋼
55、筋尺寸。 In order to ensure the correct dimensions of the steel work, sp ecial tools like clamps can be made to control the same.523.4鋼筋保護(hù)層厚度The Concrete Cover:鋼筋保護(hù)層尺寸操縱是否 準(zhǔn)確及鋼筋位置是否滿足設(shè)計(jì)要求是創(chuàng)優(yōu)檢查的一項(xiàng)重點(diǎn)內(nèi)容,也是存在咨詢題較多和不易操縱的咨詢題 ,施工中應(yīng)采納砂漿墊塊或塑料墊塊操縱保護(hù) 層厚度,關(guān)于柱子鋼筋的定位一樣采納定位卡在澆筑砼前將定位卡套在柱 筋頂端 ,用綁扣將柱筋緊靠在定位卡上 ,操縱鋼筋間距位置 ,下
56、部用塑料墊塊 操縱保護(hù)層厚度。 The proper concrete cover and the location of the reinf orcement steel shall be checked. It is the main checking for creating the first class quality work for many problems happened in this regard. Ceme nt mortar and plastic spacers made of are used to control the concrete co ver. Th
57、e spacers are usually fixed on the top of the column reinforcement steel and at bottom, plastic ones, to control the concrete coverage.鋼筋在綁扎時(shí)注意間距及鋼筋的規(guī)格,鋼筋間距,錨固長(zhǎng)度應(yīng) 符合圖紙及標(biāo)準(zhǔn)要求 ,關(guān)于懸挑結(jié)構(gòu),鋼筋的擺放應(yīng)正確。鋼筋保護(hù)層厚度 要保證,還要注意不得漏扣以及綁扣絲向時(shí),防止其銹蝕污染砼外外表。 When fabricating, attention shall be paid to the space between bars and t heir diameters. The anchor length shall comply with the requirements of drawings and the specifications. For those cantilever structures, the reinfor cement steel hall be positioned properly and the concrete
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年浙教版八年級(jí)科學(xué)下冊(cè)階段測(cè)試試卷
- 2025年度廠房租賃與物業(yè)管理服務(wù)合同3篇
- 2025年北師大版八年級(jí)地理下冊(cè)階段測(cè)試試卷
- 2025年北師大新版九年級(jí)數(shù)學(xué)下冊(cè)階段測(cè)試試卷
- 2025年度租賃合同(包含租賃物維修責(zé)任與租金調(diào)整機(jī)制)
- 二零二五年度跨境電商進(jìn)口代理合同范本2篇
- 2025年牛津上海版七年級(jí)生物下冊(cè)階段測(cè)試試卷含答案
- 2024版電商入駐合作合同:淘寶案例3篇
- 2025年浙教版七年級(jí)化學(xué)上冊(cè)月考試卷含答案
- 2025年北師大版八年級(jí)生物上冊(cè)月考試卷
- 2024年湖南省公務(wù)員考試《行測(cè)》真題及答案解析
- 超聲科危急值內(nèi)容及報(bào)告制度
- 過(guò)賬協(xié)議模板
- 新零售門店運(yùn)營(yíng)管理流程手冊(cè)
- 天津市2023-2024學(xué)年七年級(jí)上學(xué)期期末考試數(shù)學(xué)試題(含答案)
- 生命教育項(xiàng)目式學(xué)習(xí):內(nèi)涵、價(jià)值與實(shí)踐路徑
- 心理學(xué)專業(yè)知識(shí)考試參考題庫(kù)500題(含答案)(一)
- 四川省成都市青白江區(qū)2024-2025學(xué)年六年級(jí)數(shù)學(xué)第一學(xué)期期末教學(xué)質(zhì)量檢測(cè)試題含解析
- 人教版體育三年級(jí)上冊(cè)立定跳遠(yuǎn) 教案
- 「粉底」消費(fèi)趨勢(shì)報(bào)告
- 診所的醫(yī)療廢物處置協(xié)議
評(píng)論
0/150
提交評(píng)論