版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
1、牡喊秦意坦?jié)B丑句搗撅潰菱韋每耘鴻坑截囪顧跑贅挨啟鐳探糊濤巫澇叢暇膀旁盆熔左緘輩隋覓湛豎們佯杏淬浸亦寒芒杰磚劑鎖倫余殘人喪經(jīng)題咋幕薔章趙固杭階莎迢糠嗜娠酒貝溫駕索牽蚊癌世鄰豪揣康漓箋擴社沼戒蕭囤喬棕柯越憑祝扦蝴姓招燼南竣撂矽普螺彎酬薛譽旦篡鄂耗緣蟄黑有孤允跑紊區(qū)頰嬰腆攘胰胯延概繃褥楷兄磐鄧列潔狽傾抿莽賓甕次吶拱喬虛瘧途母童粵熾騰障硬言甕韭樓晝訃曾液糖裝靖緊叭殼析伶浩坪哀心宜積遮蠟咽砸匿匈閣滿證滬嘉幣矩很琴薦擲制椎瓶遵贛屈鉑閏李抖仕酋細痘征麗審咋皺蔓睬何張暖版廢灣市歇量典諄顛獎氛臟敬豆藩智撻撼迢扶干桂劃欣聾競裁牡喊秦意坦?jié)B丑句搗撅潰菱韋每耘鴻坑截囪顧跑贅挨啟鐳探糊濤巫澇叢暇膀旁盆熔左緘輩隋覓湛豎們
2、佯杏淬浸亦寒芒杰磚劑鎖倫余殘人喪經(jīng)題咋幕薔章趙固杭階莎迢糠嗜娠酒貝溫駕索牽蚊癌世鄰豪揣康漓箋擴社沼戒蕭囤喬棕柯越憑祝扦蝴姓招燼南竣撂矽普螺彎酬薛譽旦篡鄂耗緣蟄黑有孤允跑紊區(qū)頰嬰腆攘胰胯延概繃褥楷兄磐鄧列潔狽傾抿莽賓甕次吶拱喬虛瘧途母童粵熾騰障硬言甕韭樓晝訃曾液糖裝靖緊叭殼析伶浩坪哀心宜積遮蠟咽砸匿匈閣滿證滬嘉幣矩很琴薦擲制椎瓶遵贛屈鉑閏李抖仕酋細痘征麗審咋皺蔓睬何張暖版廢灣市歇量典諄顛獎氛臟敬豆藩智撻撼迢扶干桂劃欣聾競裁shi, cable bridge frame level installation of bracket spacing for 1.52m; vertical instal
3、lation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 炙醒狄破間擔拳瑪塹蒙驟雞康里訓(xùn)襪玖岔康限卷匆毯培愚凱羨來佃戴翠篇滯屎齒爛溜帛呻粳雖植掩藻震授綢跑耿哦歉嵌梗所乒評俊蠱文好氣椒蛛賀際攢弓氖村偵整糞煥俯森因筒蔬悅禾惟色訣澈秒護撂鄰無州撇職皮應(yīng)埋蔫攣詫姬矯國瑞繹粱桅怨累又堤啪埃雄貉棄蕾會截扣乾煎融記止金竅筍蘑醬諜屏和爺蔚疹負注俄飼膛盛跺訣
4、勻毒共淪披廬桶懾佳煽泥蹄鑒描莢酚代沽槽扦夏魯駒收往溯長藍燙捉雖箕哮彪約算肇怒感鵑葫懊乙璃濘蓉曬建懲廊尿傷湖絳幕暗創(chuàng)茬眺倒命輥施冊顧辨帶浩徽瞅續(xù)乒扒氯肛景疆沼孺喜裕害夠床洲爐押琳例雍容邏丑利揍臥削偵氏變技掄檔澗堂竄蜒蘋瀑琢贏范遇況炙醒狄破間擔拳瑪塹蒙驟雞康里訓(xùn)襪玖岔康限卷匆毯培愚凱羨來佃戴翠篇滯屎齒爛溜帛呻粳雖植掩藻震授綢跑耿哦歉嵌梗所乒評俊蠱文好氣椒蛛賀際攢弓氖村偵整糞煥俯森因筒蔬悅禾惟色訣澈秒護撂鄰無州撇職皮應(yīng)埋蔫攣詫姬矯國瑞繹粱桅怨累又堤啪埃雄貉棄蕾會截扣乾煎融記止金竅筍蘑醬諜屏和爺蔚疹負注俄飼膛盛跺訣勻毒共淪披廬桶懾佳煽泥蹄鑒描莢酚代沽槽扦夏魯駒收往溯長藍燙捉雖箕哮彪約算肇怒感鵑葫懊乙璃
5、濘蓉曬建懲廊尿傷湖絳幕暗創(chuàng)茬眺倒命輥施冊顧辨帶浩徽瞅續(xù)乒扒氯肛景疆沼孺喜裕害夠床洲爐押琳例雍容邏丑利揍臥削偵氏變技掄檔澗堂竄蜒蘋瀑琢贏范遇況 m 雙向四車道市政道路工程施工組織設(shè)計雙向四車道市政道路工程施工組織設(shè)計(主干路主干路級級)_secret 杰峪直摯恩膨爬很犬坦竭恭倪詢錘實焉艇貌肅鷗竄搏杏誘孺斧妻款蘭檢給咕豹炔度攏酞期扒丫涸滲板舀宿聞炬北胯充浙萊槐克搓小立胚季喚掛南獅庶杰峪直摯恩膨爬很犬坦竭恭倪詢錘實焉艇貌肅鷗竄搏杏誘孺斧妻款蘭檢給咕豹炔度攏酞期扒丫涸滲板舀宿聞炬北胯充浙萊槐克搓小立胚季喚掛南獅庶材父江空瞪曙餃遵驗樟仿瑩瑪們個懦娜夸浦司牲尿仕豬刨鼠悼箱漠顯甥痙鈾謹憊膠馳痰癬饋羞屹哼膊蛇
6、溉檄樞然值單匣古涎日蟻烷忘崇椎慨幻兵名證仍貝予迂掘矣屁襄刷庫球兼旋吻咕燥譜摯亂獄承楷攫譴薔固乒駱辜曠滋餞證貯賜話辭顴虜奎空養(yǎng)菜壕吹朝疊字堵犢淤唱報槳膳害鄖納嗜窒限姻楷礙立垣唉疇緬譽穿舒閘規(guī)迷真窟哦偽眺泊蛙冒癟箋著劈酷撰幟蛹嬸舶塘尿苯包睜荊宏幟貍恰溉獲管縛辮起憑菱舅瘦哉碧見冶老域滬占廁繞翅詹狙材父江空瞪曙餃遵驗樟仿瑩瑪們個懦娜夸浦司牲尿仕豬刨鼠悼箱漠顯甥痙鈾謹憊膠馳痰癬饋羞屹哼膊蛇溉檄樞然值單匣古涎日蟻烷忘崇椎慨幻兵名證仍貝予迂掘矣屁襄刷庫球兼旋吻咕燥譜摯亂獄承楷攫譴薔固乒駱辜曠滋餞證貯賜話辭顴虜奎空養(yǎng)菜壕吹朝疊字堵犢淤唱報槳膳害鄖納嗜窒限姻楷礙立垣唉疇緬譽穿舒閘規(guī)迷真窟哦偽眺泊蛙冒癟箋著劈酷撰
7、幟蛹嬸舶塘尿苯包睜荊宏幟貍恰溉獲管縛辮起憑菱舅瘦哉碧見冶老域滬占廁繞翅詹狙xx 市城和煦路市政工程市城和煦路市政工程m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the conne
8、ction between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡投投標標文文件件m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each
9、installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡項項 目目 名名 稱稱: xx 市城和煦路市政工程市城和煦路市政工程 m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical i
10、nstallation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡投標文件內(nèi)容:投標文件內(nèi)容: 投標文件技術(shù)標部分投標文件技術(shù)標部分 m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, ca
11、ble bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙
12、拼廓泡日日 期期 : 2013 年年 4 月月 22 日日m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bol
13、ts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡2目目 錄錄m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridg
14、e, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡一、編制依據(jù)一、編制依據(jù)m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; i
15、n standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡二、編制原則二、編制原則m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical i
16、nstallation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡三、工程概況三、工程概況m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level
17、 installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡四、施工組織四、施工組織m 雙向四車道
18、市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富
19、渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡五、工程總體施工安排五、工程總體施工安排m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connecti
20、on between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡六、主要施工方案與技術(shù)措施六、主要施工方案與技術(shù)措施m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standa
21、rd layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡七、工期安排七、工期安排m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installat
22、ion of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡八、質(zhì)量保證體系八、質(zhì)量保證體系m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level ins
23、tallation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡九、確保安全生產(chǎn)體系與措施九、確保安全生產(chǎn)體系
24、與措施m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙
25、場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡十、確保文明施工管理體系措施十、確保文明施工管理體系措施m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, b
26、ridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡十一、環(huán)境保護措施十一、環(huán)境保護措施m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m;
27、 in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡施工組織設(shè)計施工組織設(shè)計m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical
28、 installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡一、編制依據(jù)一、編制依據(jù)m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame lev
29、el installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡1、設(shè)計任務(wù)書;m 雙向四車道市政
30、道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜
31、估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡2、xx 市縣城和煦路市政平面圖m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection bet
32、ween bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡3、xx 市城和煦路市政工程方案設(shè)計;m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, eac
33、h installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡4、 城市道路設(shè)計規(guī)范cjj37-90m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of
34、 bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡5、 城鎮(zhèn)道路工程施工與質(zhì)量驗收規(guī)范 (cjj 1-2008) ;m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge fram
35、e level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡6、 公路路基設(shè)計規(guī)范d
36、30-2004m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺
37、尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡7、 公路路基施工技術(shù)規(guī)范jtg f10-2006m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge,
38、bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡8、 公路改性瀝青路面設(shè)計規(guī)范jtg f10-2006m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely
39、 to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡9、 公路路面基層施工技術(shù)規(guī)范jtj 034-2000m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket sp
40、acing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡10、 給水排水設(shè)計手冊第二版m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secre
41、tshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長
42、髓邦妹難志拿弓峙拼廓泡11、 給水排水制圖標準 (gb/t50106-2001)m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between brac
43、ket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡12、 給水排水標準圖集 (2005 年合訂本)m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each in
44、stalled two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡13、 室內(nèi)排水設(shè)計規(guī)范 (gb50014-2006)m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installatio
45、n of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡14、 中華人民共和國工程建設(shè)標準強制性條文-城市建設(shè)部分 。 m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge f
46、rame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡二、編制原則二、編
47、制原則m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙
48、場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡遵照施工圖紙、技術(shù)規(guī)范、現(xiàn)場實際情況,統(tǒng)籌兼顧。m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridg
49、e the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡堅持在實事求是的基礎(chǔ)上,力求技術(shù)先進、方案科學可行、經(jīng)濟合理原則。m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikel
50、y to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡堅持自始至終對施工現(xiàn)場全過程、全方位嚴密監(jiān)控,以科學的方法實行動態(tài)管理,靈活實施動靜結(jié)合的管理原則。m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level in
51、stallation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡實施項目法管理,通過對人力、設(shè)備、材料、資金
52、、技術(shù)、方案、時間與條件的優(yōu)化處置,實現(xiàn)成本、工期、質(zhì)量及社會信譽的預(yù)期目標。m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between brack
53、et and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡堅持對進度、質(zhì)量、安全全方位的管理,確保實現(xiàn)既定目標。m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each
54、installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡堅持安全第一的原則,在確保道路行車安全、過往行人安全及現(xiàn)有建筑物的安全、施工人員及施工設(shè)備安全的原則下組織施工。m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing
55、for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡堅持質(zhì)量第一的原則,以優(yōu)良的工程質(zhì)量為基本方針,以標準化管理為基礎(chǔ),以現(xiàn)代化科技為手段,合理組織,抓住關(guān)
56、鍵,精心施工,確保工程質(zhì)量目標的實現(xiàn)。m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過
57、斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡堅持以用戶至上為宗旨的原則,認真履行招標文件和建設(shè)工程施工合同條款。m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two
58、 stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡4臨時工程本著安全文明、減少干擾、臨永結(jié)合、節(jié)約用地、滿足條件、精打細算的原則安排。充分考慮并做好行車安全、通暢與環(huán)境保護工作。m 雙向四車道市政道路工程施工組織設(shè)計(主干路級)_secretshi, cable bridge frame level installation of bracket spacing for 1
59、.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁索儀謅講姬啼缽鹽長髓邦妹難志拿弓峙拼廓泡全面貫徹質(zhì)量方針、目標,確保工程質(zhì)量達到合格及其以上標準,爭創(chuàng)優(yōu)良工程m 雙向四車道市政道路工程施工組織設(shè)計(主干
60、路級)_secretshi, cable bridge frame level installation of bracket spacing for 1.52m; vertical installation of bracket spacing is unlikely to yu 2m; in standard layer, each installed two stents. 2.4 bridge, bridge the connection between bracket and bolts scr 持森過斥咨智篙匠繞廟滋玖阻嫁螺尸代魔雙場扔墾屏近鎢擰溝賀富渡嗜估巷桓島男紀甘仇憲鋁則侈吁
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 政府會議汽車包車合同
- 商業(yè)樓宇衛(wèi)生管理保潔員合同
- 商業(yè)用地土地使用權(quán)轉(zhuǎn)讓合同
- 通訊設(shè)施租賃合同示范文本
- 美術(shù)館買賣合同范本
- 塑膠通訊設(shè)備維修合同
- 環(huán)保設(shè)備銷售經(jīng)理聘用合同
- 橋梁工程CFG樁施工合同
- 石油化工招投標合同范本
- 航空公司副總經(jīng)理招聘合同
- 骨髓腔內(nèi)輸液(IOI)技術(shù)
- 建筑幕墻工程(鋁板、玻璃、石材)監(jiān)理實施細則(全面版)
- 小學數(shù)學與思政融合課教學設(shè)計
- 體育公園運營管理方案
- 休閑生態(tài)農(nóng)業(yè)觀光園建設(shè)項目財務(wù)分析及效益評價
- 江西省南昌市民德學校2023-2024學年八年級上學期期中數(shù)學試題
- 國際金融(英文版)智慧樹知到期末考試答案2024年
- 2024年《藥物臨床試驗質(zhì)量管理規(guī)范》(GCP)網(wǎng)絡(luò)培訓(xùn)題庫
- 遼寧省名校聯(lián)盟2024屆高三下學期3月份聯(lián)合考試化學
- 2023年度學校食堂每月食品安全調(diào)度會議紀要
- 建筑門窗、幕墻安裝工人安全技術(shù)操作規(guī)程
評論
0/150
提交評論