SGS檢驗(yàn)員新員工現(xiàn)場(chǎng)作業(yè)規(guī)程(中英文對(duì)照)_第1頁
SGS檢驗(yàn)員新員工現(xiàn)場(chǎng)作業(yè)規(guī)程(中英文對(duì)照)_第2頁
已閱讀5頁,還剩21頁未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、Page 1 of 24SGSAtte nding Surveyor Han dli ng/Report Procedure現(xiàn)場(chǎng)檢驗(yàn)員操作和報(bào)告規(guī)程Index1.Scope 范圍2.Draft Survey 水尺計(jì)重3.Weighing or random/check Weighing 衡重和隨機(jī) /抽檢重量4.Tally 理貨5.Supervisi on of container uni oad ing 集裝箱的監(jiān)卸6.Supervisi on of the vessel discharg ing 船舶的監(jiān)卸7.Supervisi on of container stuffi ng 集裝箱的

2、監(jiān)裝8.Supervisi on of the vessel load ing 船舶的監(jiān)裝9.Manual sampli ng 人工取樣10. Sample preparation 制樣Attached docume nt 附相關(guān)表格1.Moisture Determination Record.測(cè)量水份計(jì)算表2.Outturn weight.按每批加權(quán)平均計(jì)算表3.ISO standard Scoop. ISC 標(biāo)準(zhǔn)取制樣鏟尺寸4.International Sieve.國(guó)際標(biāo)準(zhǔn)篩網(wǎng)對(duì)照表5.Calculation of Proportion.明金屬比例計(jì)算表6.Melting of Met

3、allic Material Record.金屬熔錠重量記錄Page No.224667891114Page No.323334353738Page 2 of 24SGJ1. Scope范圍-This procedure specifies how to report to the han dli ng office whe n atte nding surveyors are perform ingthe in specti on at the locati on of the in specti on. The main job is in clud ing daily report an

4、d Final Inspecti on Report after completi on of the in spect ion.這個(gè)規(guī)程是現(xiàn)場(chǎng)檢驗(yàn)員在現(xiàn)場(chǎng)如何操作和報(bào)告給辦公室,主要工作是包括匯報(bào)每天的工作進(jìn)展和檢驗(yàn)完畢后遞交最終檢驗(yàn)報(bào)告.-The in spectors should carefully read the work in struct ion and know in specti on scope in details beforeto perform the in spect ion.在檢驗(yàn)工作之前,檢驗(yàn)員必須認(rèn)真,仔細(xì)閱讀工作指令單上的具體內(nèi)容和明確知道檢 驗(yàn)工作的內(nèi)容

5、.-Attending surveyor should prepare all related the equipments and documents in accorda nee with workin structio n.檢驗(yàn)員必須按工作指令單的內(nèi)容準(zhǔn)備相關(guān)工具和資料.-During in specti on, atte nding surveyors should report irregular situati on if have at the locati on of the inspect ion to han dli ng office (ha ndli ng T/C fo

6、r this file, sect ion head or line man ger) on the time.檢驗(yàn)過程中,現(xiàn)場(chǎng)檢驗(yàn)員如發(fā)現(xiàn)一切異常情況必須在現(xiàn)場(chǎng)第一時(shí)間報(bào)告辦公室具體 負(fù)責(zé)的協(xié)調(diào)員,主管或操作經(jīng)理.-Daily report should be sent han dli ng office before noon time of the work ing day or phone call to reportin details if atte nding surveyors have no eno ugh times to prepare whe n in spect io

7、n is started.現(xiàn)場(chǎng)檢驗(yàn)員每天中午前報(bào)告工作進(jìn)展,如沒時(shí)間寫報(bào)告可以電話通知.-Final in spect ion report should be prepared by atte nding surveyor with in 24 hours after completion ofthe inspection and sent to handling office on time including photos.最終檢驗(yàn)報(bào)告和現(xiàn)場(chǎng)照片必須在檢驗(yàn)工作完成后24 小時(shí)交辦公室.2. Draft Survey水尺計(jì)重The total discharged or loaded qu

8、antity should be determined by initial and final draft survey in accorda neewith the vessel displaceme nt in atte ndance of the SGS surveyor, local CIQ/CCIC surveyor, vessel chiefofficer and other releva nt parties.SGS 檢驗(yàn)員,本地商檢局/商檢公司,船舶大副或其他檢驗(yàn)機(jī)構(gòu)對(duì)根據(jù)船舶輕,重排水量 計(jì)算出裝,卸貨物的重量.The survey must be con ducted m

9、eticulously, tak ing into acco unt all the prevail ingcircumstances. The draft survey consist of the“ initial ” and “ final ” surveys, whicby measurement, calculation of the vessel s displacement before and after loading or discharg ing. Thediffere nee betwee n these two displaceme nts is the weight

10、 of cargo discharged/loaded.SG_Page 3 of 24現(xiàn)場(chǎng)檢驗(yàn)員根據(jù)現(xiàn)場(chǎng)情況,必須一絲不茍對(duì)船舶的初始和最終船舶狀態(tài)進(jìn)行觀察,測(cè)量和計(jì)算得出裝卸貨的重量2.1 Equipment used for draft survey 水尺計(jì)重通常使用的工具:-A certified draft survey hydrometer.檢測(cè)合格的密度計(jì)-Calibrated sounding tape.檢測(cè)合格的量水尺-Water finding paste.量水膏-A powerful hand torch or flash light for draft reading a

11、t night time if possible. 可能的話備照明燈或手電以備夜間用-Calculator / computer.計(jì)算器或計(jì)算機(jī)2.2 In initial draft survey 在做初水尺注意事項(xiàng):-Identify the vessel and confirm the cargo quantity of Bill of Lading. 與船方確認(rèn)裝船數(shù)量和卸貨提單重量.-Obta in the vessel con sta nt at load ing port or previous voyage from vessel chief officer and repor

12、t tothe handing office on time if it is any discrepancy when you found.與船方了解裝港或前幾個(gè)航次船舶常數(shù).如與初尺結(jié)果差異很大應(yīng)立即報(bào)告辦公室.-Obtain the copy of the ship s particular, cargo stowage plan, bilgfeaWatecord ofvoyage. Proposed discharg in g/load ing seque nee and other required docume nts if any. 須船方復(fù)印船舶規(guī)范,積載/配載圖,本航次污水倉

13、記錄,裝/卸貨次序和其他相關(guān)文件.-Identify the position and name of all deductible liquid tanks from chief officer. 要求船方大付提供所有壓載水艙/淡水艙名字和位置.-Ide ntify the displaceme nt table, ballast water sounding table of the vessel and con firm that it is with inthe period of validity.確認(rèn)船舶排水量表,壓載水艙和談水艙表是否有效.-Copy, record and ph

14、oto the main data of displacement table at one meter intervals if possible.可能的話復(fù)印或拍照船舶排水量表上平均吃水上下一米的主要數(shù)據(jù).-Others if any 如有其他注意事項(xiàng).2.3 Conduct draft survey 水尺計(jì)重過程:SG_Page 4 of 24-Read the draft markat six (6) side of vessel s in attendance of SGS surveyor, chief officerLocal CIQ/CCIC surveyor and othe

15、r releva nt parties if any. Record the draft read ingfigures.SGS 檢驗(yàn)員,船方大付,本地商檢局/商檢公司或有關(guān)檢驗(yàn)機(jī)構(gòu)觀察船舶六面吃水并 記錄.-Sounding of all the ballast tanks and fresh water tanks using a calibrated sounding tape. Record the original figure in deductible weights.用檢測(cè)合格的量水尺對(duì)所有壓載水艙,淡水艙測(cè)深.記錄原始的扣除重量.-Collect a represe ntat

16、ive sea water sample which was from half deep of the quarter mean draft to recordthe den sity using a calibrated hydrometer.提取位于一半平均吃水,具代表水樣,用檢測(cè)合格的密度計(jì)測(cè)量密度.-As a general rule, the quantity of fuel oil, diesel and lubricating oil is to be provided by chief engin eer ofvessel without further verificati

17、 on.通常用船方輪機(jī)長(zhǎng)提供的輕,重燃油數(shù)量來計(jì)算.-Calculati on is based on the provided hydrostatic tables. 用船方提供的排水量表進(jìn)行計(jì)算.-Release the draft survey report to the vessel for their con firmati on after final draft survey. 水尺計(jì)重結(jié)束后出具水尺報(bào)告交于船方確認(rèn).-Report to the han dli ng office in cludi ng the draft survey report, etc. 報(bào)告給辦公室包

18、括水尺報(bào)告等資料.-Others if any如有其他注意事項(xiàng).Note: Sea condition of the draft reading in initial and final should be well and normal less tha n 30 cm on thewater surface.注意:初/末看水吃時(shí),通常水面波動(dòng)應(yīng)小于 30 厘米.3. Weighing or random/check Weighing衡重和隨機(jī)/抽檢重量.-Used weigh-bridge or scale for weigh ing should be calibrated withi

19、n the period of validity. Copy or totake the photos of the calibration certificate of the weigh-bridge or scale. 所用衡重地磅和秤必須檢測(cè)合格并在有效期內(nèi).復(fù)印或?qū)z測(cè)合格證拍照.-Before using, checked the weigh-bridge or scale working condition (use standard test weights ifavailable)可能的話,衡重前用標(biāo)準(zhǔn)砝碼對(duì)磅稱進(jìn)行校驗(yàn).-Adjust the weigh-bridge or

20、 scale in zero and the n make sure itself is in level con diti on, clea n.衡重用磅秤須校正零位使之處于良好工作狀態(tài),清潔干凈SG_Page 5 of 24-Record the type, brand and producer of the weigh-bridge or scale.記錄所用衡重磅秤的型號(hào),規(guī)格和生產(chǎn)廠家.-For trucks/railway wago ns weigh ing should be weighed across same time, for gross and tare. Record

21、all weight figures, trucks/railway wag ons nu mber and times.卡車和火車皮衡重時(shí),須計(jì)錄輕/重車,衡重時(shí)間,重量結(jié)果和車號(hào).-Railway wago ns should not be weighed on the trot (while movin g). 火車皮衡重時(shí)須出靜態(tài)結(jié)果-It is recomme nded that the driver should be out of the motor cab in on each weigh ing operati on.每次卡車衡重時(shí),司機(jī)須離開駕駛室.-For jumbo b

22、ags weigh ing, con sideri ng the carried material in tare weight such as handing sli ng,woode n pallet, W.P.P jumbo bag or others.噸袋衡重時(shí),須考慮提噸袋索具的重量如吊索,木托板,噸袋和其他物品.-Supervisi on of weighi ng whole process and record all weighi ng results on weight list. 全程監(jiān)督衡重全部過程并記錄重量結(jié)果.-Take the pictures duri ng th

23、e whole process, show ing:整個(gè)過程須拍照,通常顯示:View of the weigh ing place which is in clud ing weighbridge or scale.衡重磅秤的地點(diǎn).Zero adjustme nt of the weigh-bridge or scale.衡重磅秤零位的矯正.Package/truck of the cargo weighed on weigh-bridge or scale (show the reading on the picture ifpossible).可能的話照片應(yīng)顯示衡重時(shí)車載的貨物,包裝.N

24、ote: Ran dom or check weigh ing only used for con sta nt weight of the package. If the weight of thepackage is more or less the 0.2 %-0.3 %, can not be calculated the totalcargo weight base on ran dom or check weighi ng figure.注意:隨機(jī)/抽檢重量?jī)H適用于定量重的包裝貨物.如包裝貨物的重量差大于0. 2% -0.3 %本身重量.本方法不能用于根據(jù)隨機(jī)/抽檢重量來推算出整票

25、貨的重量.-Others if any.如有其他注意事項(xiàng).4. Tally理貨-Tally means to acco unt the No. of the package of the cargo duri ng moveme nt - Load ing and discharging of the vessel, stuffi ng and uni oad ing of the container, etc.SG_Page 6 of 24理貨是指包裝貨物在貨物移動(dòng)過程中(如船舶的裝/卸和集裝箱的裝/卸)點(diǎn)數(shù).-Recorded the No. of the package per shif

26、t ing per cargo holds for the vessel, container No., size, type forcontainer stuffi ng or uni oad ing.應(yīng)記錄船舶的裝/卸貨物過程中每艙口,每工班的件數(shù).集裝箱裝/卸應(yīng)記錄箱號(hào),尺寸 和箱型.-Copy or take the photos for COSTACO certificate, tally report, daily sheets per shifti ng on the time ifpossible during vessel loading and discharging.復(fù)印

27、或?qū)碡涀C明,理貨報(bào)告拍照.在船舶的裝/卸貨物過程中及時(shí)拿到理貨日?qǐng)?bào)表并 記錄.-Others if any. 如有其他事項(xiàng).5. Supervisi on of container uni oadi ng集裝箱的監(jiān)卸-Before container ope ning, take the pictures for full sealed container, check the container con diti on,record the container No., size, type and seal No.開箱前,須對(duì)加封集裝箱拍照,檢查集裝箱外觀狀況,記錄箱號(hào),尺寸和封號(hào).-T

28、ake the photos whe n ope ned the container door before uni oad ing. 開箱后,卸貨前須對(duì)集裝箱拍照.-Acco unt the No. of the package of the cargo duri ng container uni oadi ng and take the pictures in halfdischarged container.卸貨中清點(diǎn)卸貨包數(shù)并對(duì)卸完半箱貨集裝箱拍照.-Take the photos after completi on of the dischargi ng in empty conta

29、iner, also closed one right side doorwhich was in clud ing container No.卸貨完后對(duì)空箱拍照并對(duì)關(guān)上右門(顯示箱號(hào)的門)拍照.-Record the No. of the package and take the photos for the damaged the cargo in container if any.記錄卸貨過程中如有殘損貨物,并對(duì)殘損貨物在箱內(nèi)的情況拍照.-After container unioading, all cargo should be inspected. Our surveyor shou

30、ld check pack ing, marking,cargo con diti on (Heat / Batch / Lot / Product ion No.), Logo etc, also take the photos for the cargo.貨物卸完后,對(duì)貨物進(jìn)行檢驗(yàn)/檢查/記錄-包括貨物的包裝,嘜頭,貨物狀況(爐號(hào),批號(hào) 和生產(chǎn)編號(hào)),標(biāo)志等.Page 7 of 24SGS-Others if any.如有其他注意事項(xiàng).6 Supervision of the vessel discharging船舶的監(jiān)卸6.1 Vessel time Log 記錄船舶在港時(shí)間:-Vess

31、el arrive anchorage 船舶抵錨地時(shí)間.-Pilot on board ( P.O.B)引水員上船時(shí)間.-First line ashore 第一根纜繩上岸時(shí)間.-All fast and secured the Pier No 靠妥碼頭泊位時(shí)間.-Clean Custom 邊防/檢驗(yàn)檢疫通過時(shí)間.-Initial draft survey if any 做初水尺時(shí)間.-Open hatches 開艙蓋時(shí)間.-Commenee discharging 開始卸貨時(shí)間.-Weighing commeneed if any 開始衡重時(shí)間.-Completed discharging

32、卸完貨時(shí)間.-Weighing completed if any 衡重完畢時(shí)間.-Final draft survey if any 做末水尺時(shí)間.-Estimated time of departure (ETD) or sailing time 預(yù)計(jì)離港 /開航時(shí)間.-Record weather condition during whole discharging operation prior 記錄整個(gè)卸貨過程的 天氣現(xiàn)象.-Others if any 如有其他注意事項(xiàng).6.2 Copy of related documents from the vessel 從船方復(fù)印相關(guān)資料:-C

33、opy of the vessel particular 船 ft 舶規(guī)范-Copy of the Cargo plan 積載圖-Copy of manifest or Bill of lading if any 艙(關(guān))單和提單-Copy of the tally sheet for the package material only if any 對(duì)包裝貨的理貨資料 .-Copy of the Notice of Read in ess if any (N.O.R 裝卸就緒通知書.-Copy of the Stateme nt of Fact (S.O.F 船 舶在港事實(shí)記錄-Others

34、 if any 如有其他注意事項(xiàng).6.3 Discharging operation 卸貨過程:-Number of the cargo holds to store the material.幾個(gè)貨艙堆積所卸的貨.-The cargo stowed con diti on before dischargi ng and cargo con diti on duri ng discharg ing. 卸貨前貨物的堆積狀況和卸貨過程中的貨物狀況 .-If the cargo is gone to be directly discharged to the ope ning area at the

35、 pier, the quayside should beseen to be properly dry and clean without any foreign matter and residue / remnants of previouscargoes.SG_Page 8 of 24如貨物直接卸在船邊碼頭上,碼頭邊場(chǎng)地須干燥,清潔,無雜物或以前堆放的殘留貨 物.-Method of discharg ing -how to discharge the material - man ipulati on. 卸貨方法,怎樣卸貨和整個(gè)卸貨過程.-Pay more attention spi

36、llage material and remained cargo on board in cargo holds or on the deck.特別注意灑漏貨物以及遺漏在船艙和甲板的貨物.-The empty cargo holds in spect ion after completi on of discharg ing. 卸完貨的艙須檢查.-Others if any 如有其他注意事項(xiàng).6.4 The photos should be take n to reflect all procedures of the in specti on as well as cargo condit

37、ion,discharging operation and material delivery, etc. Normally it includes: 須拍反映整個(gè)檢驗(yàn)過程,卸貨過程和貨物裝運(yùn)過程的照片,通常包括:-Vessel at pier condition 船靠碼頭情形.-Cargo stowed condition in cargo holds before commeneed discharging 卸貨前貨物堆放 艙內(nèi)情形.-Cargo condition during discharging 貨物在卸過程中的情形 .-Cargo stowage con diti on at o

38、pe ning area yard after completio n of discharg ing. 卸貨后貨物的堆放情形.-Seal No. of the package if any 注意包裝貨有無圭寸號(hào) .-Marks on the package and packing conditior 包裝貨嘜頭,包裝情況.-Cargo handling procedure (discharging operation, cargo delivery, packing/unpacking operati on, etc)裝/卸貨物的過程(卸貨過程,貨物的轉(zhuǎn)運(yùn),灌包和拆包).-Weather c

39、ondition during whole discharging operation 記錄整個(gè)卸貨過程的天氣現(xiàn)象 .-Other if any 如有其他注意事項(xiàng).7. Supervision of container stuffing集裝箱的監(jiān)裝-Before container stuffing, all loaded cargo should be inspected. Our surveyor should check pack ing,marking, cargo con diti on (Heat / Batch / Lot / Product ion No.), Logo etc

40、, also take the photos for thecargo.裝箱前,對(duì)要裝貨物須檢驗(yàn)檢驗(yàn)內(nèi)容包括-貨物的包裝,嘜頭,貨物狀況(爐號(hào),批號(hào)和 生產(chǎn)編號(hào)) ,標(biāo)志等.SG_Page 9 of 24- Before container stuffing, take the photos for empty container, check the container con diti on, record thecontainer No., size, type and rejected any damaged container or un clear container for ca

41、rgo stuffi ng.裝箱前,空箱須拍照,檢驗(yàn),記錄箱號(hào),尺寸,箱型.拒絕壞箱和不清潔/不干凈集裝箱裝- Acco unt the No. of the package of the cargo duri ng container stuffi ng and take the photos in half loadedcargo in container.裝箱過程中須清點(diǎn)貨物件數(shù),對(duì)裝半箱貨物拍照.- Record the No. of the package which was loaded into the containers. 記錄裝入箱內(nèi)的貨物件數(shù).-Take the phot

42、os after completion of stuffing in full container, also closed one right side door which wasin clud ing container No.裝箱完后,對(duì)整個(gè)箱拍照,包括關(guān)上右門(顯示箱號(hào)的門)拍照.-Take the photos for the damaged the cargo, rejected damaged cargo to stuff in to the container andreport to handling office on time if any.對(duì)殘損貨物要拍照,拒絕殘損貨

43、物裝入箱內(nèi)并及時(shí)報(bào)告辦公室.-Others if any 如有其他注意事項(xiàng).8. Supervision of the vessel loading船舶的監(jiān)裝8.1 Vessel time Log:-Vessel arrive anchorage 船舶抵錨地時(shí)間.-Pilot on board ( P.O.B)引水員上船時(shí)間.-First line ashore 第一根纜繩上岸時(shí)間.-All fast and secured the Pier No.靠妥碼頭泊位時(shí)間.-Clean Custom 邊防/檢驗(yàn)檢疫通過時(shí)間.-Initial draft survey if any 做初水尺時(shí)間.-O

44、pen hatches 開艙蓋時(shí)間.-Weighing commeneed if any 開始衡重時(shí)間.-Commenee loading 開始裝貨時(shí)間.-Weighing completed if any 衡重完畢時(shí)間.-Completed loading 裝完貨時(shí)間.-Final draft survey if any 做末水尺時(shí)間.-Estimated time of departure (ETD) or sailing time 預(yù)計(jì)離港 /開航時(shí)間.-Record weather condition during whole loading operation prior 記錄整個(gè)裝

45、貨過程的天 氣現(xiàn)象.-Others if any 如有其他注意事項(xiàng).8.2 Copy of related docume nts from the vessel:-Copy of the vessel particular 船舶規(guī)范.SG_Page 10 of 24-Copy of the Cargo plan 配載圖.-Copy of the tally sheet for the package material only if any 對(duì)包裝貨的理貨資料 .-Copy of the Notice of Read in ess if any (N.O.R 裝卸就緒通知書.-Copy of

46、the Stateme nt of Fact (S.O.F 船 舶在港事實(shí)記錄-Others if any 如有其他注意事項(xiàng).8.3 Loading operation 裝貨過程:-Number of the cargo holds will be stored the material. 幾個(gè)貨艙要裝貨-Empty cargo holds should be in spected before loadi ng and record the n ame of the cargo in previousthree voyages, how to clea n and wash the carg

47、o holds after last voyage from vesse chief officer.裝貨前,對(duì)所要裝貨的空貨艙要檢驗(yàn).向船方大付詢問并記錄前三航次船舶所載貨物 名稱,本航次是如何清理貨艙的.-The cargo storage con diti on and cargo con diti on at the pier, warehouse before loadi ng and cargocon diti on duri ng load ing.裝船前貨物在碼頭,倉庫的堆放情況和裝船過程中的貨物狀況.-Load ing operatio n how to load the c

48、argo - man ipulati on.裝貨方法,怎樣裝貨和整個(gè)裝貨過程.-Pay more atte nti on spillage material duri ng loadi ng.特別注意裝貨過程中灑漏的貨物.-The loaded cargo con diti on in cargo holds after completi on of load ing. 裝貨完畢后貨物的在貨艙內(nèi)的堆放情況.-Separation, lashing and chocking condition in cargo holds if any. 隔票,綁扎和木加固的情況.-Others if any

49、如有其他注意事項(xiàng).8.4 The photos should be take n to reflect all procedures of the in specti on as well as cargo condition,Ioading operation and material delivery, etc. Normally it includes:須拍反映整個(gè)檢驗(yàn)過程,裝貨過程和貨物裝運(yùn)過程的照片,通常包括:-Vessel at pier condition 船??看a頭情形.-Cargo holds condition before commeneed loading 裝貨前的空艙

50、情況.Page 11 of 24SGS-Cargo con diti on before load ing and duri ng loadi ng 裝貨前和裝貨過程中貨物狀況 .-Packing/Marking condition if any 如對(duì)包裝貨的包裝和麥頭情況.-Cargo storage con diti on at ope ning area yard or warehouse 物在堆場(chǎng)和倉庫堆放情況 .-Cargo handling procedure (loading operation, cargo delivery, packing/unpacking operati

51、 on, etc)貨物裝運(yùn)過程(包括怎樣裝貨,貨物的裝運(yùn),灌包和拆包)-Cargo stowage condition in the holds 貨物在船艙積載情況.-Weather condition during whole loading operation 記錄整個(gè)裝貨過程的天氣現(xiàn)象 .-Other if any 如有其他注意事項(xiàng).9. Manual sampling人工取樣9.1 Definition 定義Con sig nment-A quantity of material of the same quality delivered at one time byagreeme n

52、t betwee n the parties concern ed. The con sig nment maycon sist of one or more lots or parts of lots.有關(guān)方按合同一次交付一定數(shù)量同等質(zhì)量的貨物,該批貨物有可能是一個(gè)批號(hào)或幾個(gè)批號(hào).Lot-A defi ned qua ntity of material un der give n in ten ti ons. A nu mberof lots can make up the whole con sig nment.按要求交付同等品質(zhì)一定數(shù)量貨物,一票貨可能有幾批次貨 物組成.In creme

53、 nt-A qua ntity of material obta ined by a sampli ng device at any onetime from a con sig nment.用取樣工具從一票貨任何一次性取出的樣品.Sub-sample-A qua ntity of material con sisti ng of several in creme nts take n froma part of the con sig nment.從幾個(gè)取樣點(diǎn)取出樣品的匯總.Gross sample-A qua ntity of con sist ing of all the in crem

54、e nts take n from a lot or allof the sub-sample.從每取樣點(diǎn)取出的樣品或每批樣的總和.Prepared sample-The sample has been finished by stated procedures of preparation,by crush ing and reduc ing.SG_Page 12 of 24通過破碎和縮分制完的樣Top size-This size/scree n which retai ns 5 % of the material.最大粒度-能保留 5%篩上物的篩網(wǎng)尺寸.Number of the In

55、creme nt - The nu mber of in creme nt to be collected from a lot/c on sig nment will bedecided accord ing to the accuracy required, tak ing in to account thevariation in the representative nature of the material. 取樣點(diǎn)的數(shù)目.Size of the In creme nt- The size of each in creme nt should be large eno ugh to

56、 en sureran dom selecti on of particles in each in creme nt.每取樣點(diǎn)的樣量.9.2 Sampli ng during dischargi ng/loadi ng 在裝 / 卸貨過程中取樣-Description of the material - name of the cargo, top size of the material, sampling lot size and han dli ngcon diti on.要了解貨物的情況-貨物名稱,最大粒度,取樣的批次和裝/卸貨情形.-Make the sampli ng pla n

57、, how many in creme nts and how many sample weight per in creme nt will betake n for the con sig nment.制定取樣計(jì)劃,樣品從多少樣點(diǎn)中取出,每個(gè)樣點(diǎn)取多少樣品.-Prepared the available sample spear, shovel and scoop which should follow the principle that innerdiameter should be at least 2.3 times of the nominal top size of the s

58、ampled material, sample bagsand mark pen.備妥取樣用樣釬,樣鏟.取樣工具的開口必須是貨物最大粒度的2.5 -3 倍以上.-Sampling 實(shí)施取樣.-Sealed the sample bags after sampli ng and marked the sample bags (our file No. / vessel name /commodity name / lot No. / sampling date / location / inspector, etc) 取樣后,裝樣袋須加封并加標(biāo)志-包括:工作單編號(hào),船舶名稱,貨物名稱,批號(hào),取樣

59、時(shí) 間,地點(diǎn)和檢驗(yàn)員.-Discussed with the vessel chief officer and compared the qua ntity betwee n the discharged/loaded cargoand sampled material.詢問船舶大付,比較取樣所對(duì)應(yīng)的貨物和實(shí)際裝/卸貨物的數(shù)量.盡可能保持一致.-Others if any 如有其他注意事項(xiàng).9.3 Sampling from the wagons or trucks 在車皮和卡車上取樣-Descripti on of the material - n ame of the cargo, top

60、 size of the cargo, sampli ng lot size and han dli ngcon diti on.要了解貨物的情況-貨物名稱,最大粒度,取樣的批次和裝/卸貨情形.SG_Page 13 of 24-Make the sampli ng pla n, how many in creme nts and how many sample weight per in creme nt will betake n for the con sig nment.制定取樣計(jì)劃,樣品從多少樣點(diǎn)中取出,每個(gè)樣點(diǎn)取多少樣品量-Prepared the available sample

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論