1、ContractforDecorationProjectParty A (full name):Party B (full name):This Contract is concluded on the basis of the project details by and between the foresaid Party A and Party B in accordance with Contract Law of Peoples Republic of China andConstruction Engineering Contract Regulations。1。 Overview
2、1。1 Project name:1。2 Project site:1。3 Project content:Means of contract:Construction Period is from date of commence of, to completion dateof。1。6 Quality standard:1.7 Contract price:2。 Party As Responsibilities2。1 Party A shall providecopy of confirmed construction drawings or instructions to Party
3、BDays prior to the date of commence, clear up all or parts of the buildings, and remove barriers。Party A will take protective measures for the remaining furniture and furnishings. Party A also needs to provide water, electricity , gas and telecommunications, and indicatematters needing attention to
4、Party B. Party A will be responsible for going through all the applications andapproval procedures related to the project.2。2 Party A assignsto be the representative. He will be responsible for thesupervision and control over the project, and handle the acceptance, alteration, registration formaliti
5、es.2。3 Party A entrustswith the construction supervision of this project。 Thesupervision company appointsto be the general supervision engineer, clarifies hisresponsibilities in the supervision contract, and submits copy of the contract to Party B。2。4 Party A shall be responsible for protecting the
6、surrounding buildings , equipments,pipelines, trees and landscaping from being damaged, and bear corresponding costs.If it is really necessary to change the original building structure or pipelines, Party Ashall be responsible for going through the corresponding approval procedures。Party A will coor
7、dinate with relevant departments to do onsite security, fireprotection, waste disposal, etc., and bear the corresponding costs.3。 Party Bs Responsibilities3。1 Party B must be available to attend meetings organized by Party A and prepare constructionplanandschedule。Party B assignsas the site resident
8、 representative. He will be responsible forconstruction organization and completion of the project with good quality.Party B shall strictly implement the construction specifications, safety operation procedures, fire safety regulations, and environmental protection regulations. It must strictly exec
9、ute construction abiding by construction drawings or practice instructions, and complete the quality inspection record. Party B must participate in the final completion acceptance, and prepare the project settlement.3。4 Party B must abide by the provisions on the management of the construction sites
10、 bythe national or local government and related departments, protect the surrounding buildings ,equipmentspipelinestrees and landscaping from being damagedParty B also need to doa good job in such things as the construction site security and garbage disposal, and deal well with the issue of disturbi
11、ng residents brought about by construction。3.5 Without Party As consent or approval of relevant departments, Party B shall not makeany unauthorized changes to original building structure or pipelines.3。6 Party B shall be responsible for protecting all the facilities and finished projects beforethe p
12、roject is handed over to Party A。Construction Period4。1 When Party A needs to complete the project ahead of the time limit, it should obtainParty Bs agreement and pay the cost for the measures that Party B takes to crash the schedule.4.2 If the project progress is influenced by the delay of Party As
13、 delivery date, thepractically impacted cycle extends accordingly.4。3 If the project can not be started on time or shutdown halfway for no reason because ofParty Bs responsibility, the practically impacted cycle can not extend accordingly。4。4 The project duration shall be prolonged when the downtime
14、 is over eight hours(accumulated in one week) caused by the power failure, water failure, gas stop and forcemajeure factors because of design changes or reasons not related to Party 。Quality Standard and Acceptance Inspection5。1 This project takes construction drawings, instructions, design changes
15、and national construction and acceptance specifications such as Construction and Acceptance Standards of Decoration Engineering (JGJ7391), Unified Quality Inspection and Assessment of Architectural Installation Work (GBJ300-88)as quality assessment and acceptance standards.5.2 Quality of the project
16、 should meet the acceptance criterion of national quality assessment. If all or parts of the project reach to the excellent standard, Party A will payto Party B increased costs。5。3 Party A and Party B shall promptly handle the concealed work inspection procedures of pre-acceptance in the middle of t
17、he project. If Party A do not organize covert acceptance in time, Party B can make selfinspection and Party A shall admit the result。 If Party A requires the reinspection,Party B shall be in accordance with the requirements for the reinspection. If the5.4 If materials provided by Party A for the con
18、struction do not meet the necessaryrequirements, Party A shall bear responsibility5.4 If materials provided by Party A for the construction do not meet the necessaryrequirements, Party A shall bear responsibility for any resulting delays in the completion of the project.5。5 If the quality of Party B
19、s work results in any accidents, liability for such accidents shallbe borne by Party B。5.6 When the Project is ready for final acceptance, Party B shall submit to Party A the fullas-builtdocumentations andcompletionacceptancereport.PartyAshallorganize theacceptance within 5 day after receiving all t
20、he documents. When Party A can not conduct theacceptance within the time specified in the Contract, Party A shall inform Party B without delay and determine another date for the acceptanceParty A, howevershall admit the completiondate of the Decoration Project and be liable for the expenses for taki
21、ng care of the construction by Party B and other relevant expenses.Contract Prices SettlementThe Parties agree to determine the contract price pursuant to modebelow:(1) Fixed price(2) Fixed price, combined with/ risk rate (including/)(3) Adjustable price: make adjustments and settlement according to
22、 relevant stateregulationsTiming of PaymentsPayment ProportionAmountParty A shall makepayments after the Contract comes into effect. Final payment willbe made Timing of PaymentsPayment ProportionAmount6。3 After final acceptance of construction, Party B will make the engineering settlement and transf
23、er the relevant documents to Party A. Party A shall complete reviewing of thedocuments within / days. Where Party A fails to raise an objection, its consentshallbedeemedto have been given。 The final payment shall be made within / days.Material suppliesParty A is in charge of purchasing the supplied
24、materials and equipments (refer toAnnex)。 The materials shall be qualified and meet the design requirements, and be delivered to the scene in time. If Party B is responsible for picking up the materials , Party A shall hand over delivery documents to Party B and let Party B bear the transportation e
25、xpense. Party A shall be responsible for the damages to the project caused by quality problems or specification differences of the materials and equipment supplied by Party A。 Party B is responsible for storage of materials provided by Party A, and Party A shall pay/ of the material value as the sto
26、rage fee. Party B shall be responsible for the compensation associated with the loss causedby improper storage of Party B。Materials provided by Party B: Any materials or equipment supplied by Party B which do not meet the design and construction requirements are prohibited。 If the materials have bee
27、nused, the loss caused shall be assumed by Party B.Safe Production and Fire Regulations8。1 Construction drawings provided by Party A or practice that should comply with the fireregulations of the Peoples Republic of China and the relevantfire safety rules.Party B should strictly abide by Engineering
28、 Safety Technical Regulations for Construction and Installation, Safety Operation Procedures, Fire Control Regulation and other relevant laws and regulations.Party A shall bear all the resulting economic losses if the drawings or instructions violate the safety operating rules, fire control and fire
29、 prevention design specifications。Party B shall bear all the resulting economic losses if its construction process violates the safety operating rules, fire control and fire prevention design specifications。9。 Rewards and Liabilities for Breach of the Contract91 If Party A causes any delays to the c
30、ompletion of this project, then Party A must pay to Party Bfor each day beyond the scheduled completion date. A fine ofwill be imposed in respect of each day that the payment is overdue.9.2 If Party B causes any delays to the completion of this project, then Party B must pay to Party Afor each day b
31、eyond the scheduled completion date. If the project needs to becompleted ahead of the time limit, a reward ofwill be provided by Party A in respect of each day before the scheduled completion date。9。3 If all or parts of the project reach to the excellent standard, Party A will paytoParty B as a rewa
32、rd。Party B shall protect the equipments provided by Party A, furniture, furnishings andParty B shall protect the equipments provided by Party A, furniture, furnishings and finished products placed on site. If losses are caused, Party B shall bear the compensation responsibility。If Party A instructs
33、Party B to make any alterations to a load bearing wall and Party A hasnot sought and received permission from the building property management, Party A shall be responsible for any resulting costs and shall indemnify Party B for any additional expensesincurred.9。6 If Party B makes any unauthorized c
34、hanges to load bearing walls or building pipelines and such changes result in damages or loss, it shall be the responsibility of Party B to pay for suchloss.9。7 Party A shall be responsible for any extra costs incurred due to his use of the property before the final completion meeting and signing of the “Engineering Quality Acceptancedocument。9.8 If a party suspends its performance, it shall timely notify the other party and be liablefor all losses thus incurred to the other party。10。 Deputes10.1 If there is any dispute between the two parties, the parties should sol
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025單位基本建設合同簡易范文
- 2025年度公司經(jīng)理內(nèi)部審計與合規(guī)聘用合同3篇
- 二零二五年度環(huán)保建材工廠設備轉(zhuǎn)讓合同3篇
- 2025年度量子信息內(nèi)部股東股權(quán)轉(zhuǎn)讓協(xié)議書范文3篇
- 二零二五年度企業(yè)年會場地布置用品采購協(xié)議3篇
- 二零二五年度股權(quán)代持風險管理與合作協(xié)議2篇
- 2025年度員工宿舍租賃及智能化安防系統(tǒng)合同3篇
- 2025年度綠色養(yǎng)殖場養(yǎng)殖工人勞動合同3篇
- 2025年度農(nóng)業(yè)機械出租與農(nóng)機具維修服務合同3篇
- 二零二五年度智能交通系統(tǒng)合作項目協(xié)議書模板3篇
- 《業(yè)務員銷售技巧》課件
- 《汽車涂裝》2024-2025學年第一學期工學一體化課程教學進度計劃表
- 水廠安全管理培訓
- 江西省贛州市2023-2024學年高一上學期期末考試化學試題 附答案
- 消化道出血護理常規(guī)課件
- 2024年物流運輸公司全年安全生產(chǎn)工作計劃例文(4篇)
- 貴州省銅仁市2023-2024學年高二上學期期末質(zhì)量監(jiān)測試題 地理 含答案
- 2024-2025學年二年級語文上冊期末非紙筆試卷二(統(tǒng)編版)
- 山東師范大學《古代文學專題(一)》期末復習題
- 注塑操作員作業(yè)指導書
- 片石擋土墻砌筑施工方案及工藝方法
評論
0/150
提交評論