建筑工程項目投標書
技術方案
目錄
第1章編制說明及工程概況.........................................................5
1.1編制依據(jù)...........................................................................5
1.1.1編制原則.......................................................................7
第2章工程概況及設計概況..........................................................8
1.1工程概況..........................................................................8
1.1建筑設計概況......................................................................8
1.3結構設計概況......................................................................9
1.4工程施工的特點和難點.............................................................11
第3章施工部署...................................................................11
3.1施工準備..........................................................................12
3.1.1技術準備...........................................................................12
3.1.1生產(chǎn)準備...........................................................................12
3.1指導思想與組織機構................................................................12
3.1.1項目法施工.........................................................................13
3.1.1組建項目經(jīng)理部.....................................................................13
3.1.3組織管理模式及各負責任職責........................................................13
3.3總體施工方案:....................................................................15
3.3.1施工順序............................................................................15
3.3.1施工流向............................................................................16
3.3.3施工段的劃分.......................................................................16
3.3.4主要施工方法.......................................................................16
3.4施工進度計劃......................................................................16
3.5施工組織..........................................................................16
3.5.1施工內容............................................................................16
3.5.1施工程序.........................................................................................................................................16
3.5.3施工調度...........................................................................................................................................16
第4章施工方法及工藝............................................................18
4.1主體結構施工方法.................................................................18
4.1.1施工測量.......................................................................................................................................18
4.1.1基礎土方施工.................................................................................................................................20
4.1.3模板工程.......................................................................................................................................20
4.1.4鋼筋工程.......................................................................................................................................23
4.1.5混凝土工程...................................................................................................................................27
4.1.6砌體工程.......................................................................................................................................29
4.1.7裝飾工程..........................................................................................................................................31
4.1外腳手架施工方法.................................................................35
4.3重點和難點工程.................................................................36
4.3.1大體積混凝土施工的溫度控制..................................................................................................36
4.3.1預防滲漏、開裂的技術措施......................................................................................................37
第5章保證工程質量措施..........................................................39
5.1質量目標........................................................................39
5.1質量保證體系....................................................................39
5.3質量保證措施.....................................................................41
5.3.1確保施工質量的技術措施...............................................................................................................41
5.3.1保證質量的管理措施....................................................................................................................42
5.4防止質量通病措施.................................................................43
5.4.1土方工程.........................................................................................................................................43
5.4.1模板工程.........................................................................................................................................43
5.4.3鋼筋工程...........................................................................................................................................44
5.4.4混凝土工程.....................................................................................................................................45
5.4.5砌體工程...........................................................................................................................................48
5.4.6樓地面工程.......................................................................................................................................49
5.4.7裝飾工程...........................................................................................................................................49
5.5成品保護措施.....................................................................51
5.5.1防水施工............................................................................................................................................51
5.5.1模板工程............................................................................................................................................51
5.5.3鋼筋工程............................................................................................................................................51
5.5.4混凝土工程........................................................................................................................................51
5.5.5樓地面工程........................................................................................................................................52
5.5.6抹灰、面磚工程.................................................................................................................................52
5.5...........................................................................................................................................7乳膠漆工程.52
5.6計量管理措施......................................................................52
5.6.1計量工作目標....................................................................................................................................52
5.6.3計量管理制度....................................................................................................................................53
第6章安全生產(chǎn)保證措施..........................................................53
6.1安全生產(chǎn)管理體系.................................................................53
6.1.1安全生產(chǎn)目標....................................................................................................................................54
6.1.1安全生產(chǎn)管理體系.............................................................................................................................54
6.1.3安全檢查制度....................................................................................................................................54
6.1.4安全教育制度....................................................................................................................................54
6.1安全生產(chǎn)保證措施.................................................................54
6.1.1技術措施............................................................................................................................................54
6.1.1施工機械安全....................................................................................................................................55
<5.1.3安全用電...........................................................................................................................................55
6.1.4防臺風、防雨、防雷措施................................................................................................................55
6.1.5腳手架安全.......................................................................................................................................55
6.3安全用電和電氣防火措施...........................................................56
6.3.1安全用電措施....................................................................................................................................56
6.3.1安全用電組織措施.............................................................................................................................58
6.3.3電氣防火技術措施.............................................................................................................................58
6.3.4電氣防火組織措施.............................................................................................................................58
6.4分項工程安全技術措施.............................................................59
6.4.1安全技術交底制度..........................................................................................................................59
6.4.1分項工程安全技術措施..................................................................................................................59
第7章文明施工措施..............................................................64
7.1現(xiàn)場工程標志牌設計................................................................64
7.1臨設布置..........................................................................64
7.3成品、半成品、原材堆放..........................................................64
7.4現(xiàn)場場地和道路...................................................................65
7.5運輸車輛.........................................................................65
7.6現(xiàn)場衛(wèi)生管理.....................................................................65
7.7現(xiàn)場安全、保衛(wèi)...................................................................65
7.8文明施工教育.....................................................................66
第8章進度控制措施...............................................................66
8.1目標............................................................................66
8.1進度控制的方法..................................................................66
8.3強化進度計劃管理.................................................................66
8.4、施工進度的控制.................................................................67
8.5保證工期的技術措施...............................................................67
第9章其它保證措施..............................................................68
9.1季節(jié)性施工措施...................................................................68
9.1.1雨季施工措施..................................................................68
9.1.1炎熱天氣施工措施...............................................................68
9.1現(xiàn)場消防措施.....................................................................69
9.3降低成本措施.....................................................................69
9.4夜間施工措施......................................................................71
9.5、現(xiàn)場文明施工措施................................................................71
9.6、環(huán)保措施........................................................................72
9.7、建筑施工半成品、成品保護措施....................................................73
第10章附表(進貨實驗計劃、水電計劃用量表、施工平面布置圖、勞動力用量計劃表、施工機
械設備表'施工進度計劃網(wǎng)絡圖)....................................................74
第1章編制說明及工程概況
1.1編制依據(jù)
本施工組織設計作為主導施工的依據(jù),編制時對目標工期、工程質量、項目
管理機構設置、勞動力組織、施工進度計劃控制、機械設備及周轉材料配備、主
要分部分項工程施工方法、安全保證措施、文明施工及環(huán)境保護措施、降低成本
措施等諸多因素盡可能充分考慮,突出科學性及可行性。本施工組織設計依據(jù)以
卜一幾項編制:
表1—1施工合同
合同名稱編號簽定日期
*******2018-3
表1—1次加工圖
圖紙名稱圖號出圖日期備注
圖紙目錄01
設計說明012018-3
建筑施工圖建施01一建施112018-3
結構施工圖結施01一結施302018-3
表1-3主要法規(guī)
類別名稱編號
中華人民共和國建筑法
國家
建設工程質量管理條例
建設工程安全生產(chǎn)管理條例國務院令第393號
行業(yè)
建設工程施工現(xiàn)場管理規(guī)定建設部令1991年第15號
建設工程質量管理手冊
建設工程環(huán)境保護手冊
企業(yè)
建設工程職業(yè)健康安全管理手冊
建設工程施工程序作業(yè)指導書
表1-4主要規(guī)程、規(guī)范
類別名稱編號
混凝土結構工程施工質量驗收規(guī)范GB50104-1001
工程測量規(guī)范GB50016-1993
地基與基礎工程施工質量驗收規(guī)范GB50101-1001
國家
屋面工程施工質量驗收規(guī)范GB50107-1001
地下防水工程施工質量驗收規(guī)范GB50108-1001
建筑裝飾裝修工程施工質量驗收規(guī)范GB50110-1001
民用建筑工程室內環(huán)境污染控制規(guī)范GB50315-1001
建設工程項目管理規(guī)范GB50316-1001
工程建設標準強制性條文(房屋建筑部分)1001版
鋼筋混凝土用熱軋帶肋鋼筋GB1499-1998
硅酸鹽水泥、普通硅酸鹽水泥GB175-1999
國家混凝土外加劑GB8076-1997
砌體工程施工質量驗收規(guī)范GB50103-1001
建筑給排水及采暖工程施工質量驗收規(guī)范GB50141-1001
建筑電氣工程施工質量驗收規(guī)范GB50303-1001
建設工程施工現(xiàn)場供用電安全規(guī)范GB50194-1993
塔式起重機安全規(guī)程GB5144-1985
建筑變形測量規(guī)程JGJ/T8-1997
建筑地基處理技術規(guī)范JGJ79-1001
高層建筑混凝土結構技術規(guī)范JGJ3-1001
冷軋帶肋鋼筋混凝土結構技術規(guī)程JGJ95-1995
普通混凝土用砂JGJ51-1991
行業(yè)普通混凝土用碎石和卵石JGJ53-1991
普通混凝土拌合用水JGJ65-1989
普通混凝土配合比及設計規(guī)程JGJ/T55-1000
回彈法檢測混凝土抗壓強度技術規(guī)程JGJ/T13-1001
建筑施工高處作業(yè)安全技術規(guī)程JGJ80-1991
建筑機械使用安全技術規(guī)程JGJ33-1001
施工現(xiàn)場臨時用電安全技術規(guī)范JGJ46-1988
地方建筑工程資料管理規(guī)程DBJ14-013-1004
表1-5主要圖集
類別名稱編號
門制作安裝圖集L99J605
窗制作安裝圖集L99J605
建筑做法L96J001
鋼筋混凝土結構抗震構造詳圖L03G313
鋼筋混凝土過梁L03G303
地方多層病房抗震構造詳圖L03G313
室外配件L03J004
混凝土結構施工圖(平面整體表示方法)03G101-1
表『6主要標準
類別名稱編號
建筑工程施工質量驗收統(tǒng)一標準GB50300-1001
混凝土質量控制標準GB50164-1991
國家
混凝土強度檢驗評定標準GBJ107-1987
建筑施工場界噪聲限值GB11513-1990
行業(yè)建筑施工安全檢查標準JGJ59-1999
1.1.1編制原則
(1)嚴格遵守招標文件規(guī)定的施工期限,科學而合理地安排施工程序,在
保證質量的基礎上,盡可能縮短工期,加快施工進度;
(1)采用先進的施工方法和施工技術,不斷提高施工機械化程度,減輕勞
動強度,提高勞動生產(chǎn)率;
(3)應用科學的計劃方法確定最合理的施工組織方法。根據(jù)工程特點和工
期要求,因地置宜地采用快速施工、平行作業(yè),并通過網(wǎng)絡計劃找出最佳的施工
組織方案;
(4)落實季節(jié)性施工的措施,確保全年連續(xù)施工,全面平衡人工、材料用
量,力求實現(xiàn)均衡施工;
(5)妥善安排施工現(xiàn)場,確保施工安全,實現(xiàn)文明施工。
第2章工程概況及設計概況
1.1工程概況
表1T工程概況
地理**317國道以東
工程名稱*****
位置經(jīng)濟開發(fā)區(qū)
設計
建設單位***路橋工程有限公司**建筑設計研究院
單位
監(jiān)理*****建設工程監(jiān)理
勘察單位***巖土工程勘察有限公司
單位咨詢公司
監(jiān)督單位**建設工程質量監(jiān)督站
施工單位***路橋工程有限公司
合同范圍施工圖中全部施工內容投資性質業(yè)主自籌
合同質量
合格合同性質中標價
目標
總工期:141日歷天
合同工期計劃開工日期:2018年3月1日
計劃竣工日期:2018年8月10日
1.1建筑設計概況
表1T設計概況
總建筑耐火場地土
8993.78m1二級二類
面積等級類別
正常抗震七度抗震設防,設
層數(shù)5層使用50年設防計基本地震加速度
年限烈度0.1g
工程抗震設防分類為
建筑高度11.00m抗震丙類建筑
建筑結
等級三級
構安全二級
設計室
等級
基礎埋深-1.100m外地-0.6m
坪
建筑防火
建筑設計防火規(guī)范GBJ16-87
設計
1、門窗做法圖集(L03J60KL91J601)
裝飾
1、地面做法:具體做法見L96J001(地1地14地16)
與
3、室內抹灰為內墻4,水泥砂漿抹面(L96J001)
裝修
4、外墻:L96J001,外墻19,(涂外墻漆)
屋面工程L96J001:屋18、46。
1.3結構設計概況
表1-3設計概況
地基土質情況工程現(xiàn)場土類別為II類土
地本工程地基承載力特征值£=180Kpa.
基1.素混凝土墊層厚度100,底標高為T.lOOm,混凝土標號C15。
與1.構造柱、混凝土標號為C30o
基3.磚基礎:370磚基礎高0.15m,140磚基礎高1.7m,M7.5水泥砂漿砌MU10
礎蒸壓粉煤灰磚。
工4.地圈梁:截面尺寸140X300,梁頂面標高為-0.050,混凝土標號C30。
程5.鋼筋混凝土條形基礎:底面標高為T.100,混凝土標號為C30。
主構件混凝土備
結構參數(shù)
體名稱強度等級注
結
構
(框框架柱500*500,400*400,400*370C30
架)工
程
1.一層:墻厚:140mmMU10蒸壓粉煤灰磚
采用M5水泥砂漿砌筑。
2.二層:墻厚:140mmMU5陶??招钠鰤K
采用M5混合砂漿
墻體砌筑
3.砌筑墻體時,不能以圈代過處設混凝C30
土過梁,三級荷載,采用圖集號
L03G303o
4.屋面現(xiàn)澆板混凝土SBS防水保溫屋面。
1.梁:框架梁,連系梁截面不等。
梁、板1.板:板厚:100mm(不包括階梯教室板C30
和臺階,與梁整體澆筑)。
鋼筋保護板:15mm基礎:40mm梁:15mm柱:30mm
層圈梁、構造柱:15mm
縱向鋼筋的錨固長度
鋼筋非抗震錨固長度混凝土強度等級
種類抗震錨固長度C10C15C30C35C40
La31d17d14dlidlOd
LaE二級抗震等
HPB13536d31d18d16d13d
級
LaE三級抗震等級33d19d16d14dlid
La40d33d30d17d15d
LaE—.二級抗震等
HRB33546d38d35d31d19d
級
LaE三級抗震等級41d35d31d19d17d
La47d40d36d33d30d
HRB400LaE-.二級抗震等
54d46d41d38d35d
級
LaE三級抗震等級50d41d38d35d31d
注:1.彎錨時,除注明外錨固長度>0.41a+l5d
1.在任何情況下錨固長度不得小于150mm
3.HPB135鋼筋為受拉鋼筋時,其末端應做成180度彎鉤,彎鉤的平直
長度不應小于3d;當受壓時,可不做彎鉤。
1.4工程施工的特點和難點
工程施工的主要特點和難點有以下幾點:
(1)在施工中:土方開挖、外墻磚墻、柱梁、屋面結構、門窗、水電、消防
等分項工程較多,在施工各個階段都要有專業(yè)施工技術上和管理上的協(xié)調配合措
施。
(1)基礎承臺為大體積混凝土施工須采取行之有效的施工方法和措施,以防
混凝土出現(xiàn)施工冷縫和溫度裂縫。
(3)本工程為多層建筑面積較大的建筑物,垂直度及軸線控制也是測量放線
的一個重點。
(4)工期比較緊,施工對整個工程的施工進度做好統(tǒng)籌規(guī)劃,并應認真做好
各種預留、預埋工作,同時還應會同甲方與監(jiān)理單位,加強對現(xiàn)場的管理和調度。
(5)本工程為單體工程,實行流水施工。
第3章施工部署
*******工程,施工質量、工期、安全生產(chǎn)及文明施工都會對整個工程起到至
關重要的作用,公司擬將其列為重點工程,公司給予高度重視,決心在以往建筑
施工經(jīng)驗的基礎上,鞏固成績,克服缺點,堅持公司的質量方針,運用科學管理,
制定嚴格的質量、進度和安全生產(chǎn)的控制措施,大力采用新技術、新工藝和新材
料,以科技推動生產(chǎn),降低成本。在施工過程中,同建設單位、監(jiān)理單位、設計
單位和質檢單位密切合作,繼續(xù)推行項目法施工,實施IS09001質量保證體系。
責任到人,實行目標管理,精心組織施工,確保優(yōu)質、高效、高速、安全、文明
生產(chǎn)。為此我公司制定以下各項目標:
一、工期:確保141內完成招標規(guī)定的全部工程項目。
二、質量:單位工程質量力爭達到優(yōu)良標準,分部工程全部合格。
三、安全:嚴格按建設部一標三規(guī)范組織施工,確保施工中無死亡、無重傷、無
火災、無中毒、無倒塌等現(xiàn)象發(fā)生。
四、文明施工:嚴格按建設局的文件執(zhí)行,達到文明樣板工地標準。
3.1施工準備
3.1.1技術準備
(1)組織各專業(yè)人員熟悉圖紙,對圖紙進行自審,熟悉和掌握施工圖紙的全部
內容和設計意圖。土建、安裝各專業(yè)相互聯(lián)系對照,發(fā)現(xiàn)問題,提前與建設單位、
設計單位協(xié)商,參加由建設單位、設計單位和監(jiān)理單位組織的設計交底和圖紙會
審。
(1)編制施工圖預算,根據(jù)施工圖紙,計算分部分項工程量,按規(guī)定套用施工
定額,計算所需要材料的詳細數(shù)量、人工數(shù)量、大型機械臺班數(shù),以便做進度計
劃和供應計劃,更好地控制成本,減少消耗。
(3)根據(jù)項目施工的內容,擬定加工及定貨計劃。
(4)做好技術交底工作。本工程每一道工序開工前,均需進行技術交底,技術
交底是施工企業(yè)技術管理的一個重要制度,是保證工程質量的重要因素,其目的
是通過技術交底使參加施工的所有人員對工程技術要求做到心中有數(shù),以便科學
地組織施工和按合理的工序、工藝進行施工。
技術交底專業(yè)均采用三級制,即各專業(yè)工程技術負責人一專業(yè)工長一各班組長,
技術交底均有書面文字及圖表,級級交底簽字,工程技術負責人向專業(yè)工長進行
交底要求細致、齊全、完善,并要結合具體操作部位、關健部位的質量要求,操
作要點及注意事項等進行詳細的講述交底,工長接受后,應反復詳細地向作業(yè)班
組進行交底,班組長在接受交底后,應組織工人進行認真討論,全面理解施工意
圖,確保工程的質量和進度。
3.1.1生產(chǎn)準備
(1)建筑材料及安全防護用品準備:對水泥、鋼材、木材三大建筑材料,特殊
材料等,均應根據(jù)實際情況做好計劃,分批進場,編制各項材料計劃表,對各種
材料的入庫,保管和出庫制訂完善的管理辦法,同時加強防盜、防火的管理。
(1)施工機具設備:施工中計劃投入的大型施工機械包括11臺混凝土攪拌機、
1臺QTZT5塔吊等施工中所需的各種中小型機具設備均齊備完好,無需訂購。
(3)臨時用電、臨時用水的搭設、安裝、調試。
(4)組織施工管理人員及勞動力調配入場,滿足施工要求。
(5)提前做好預制、預埋件的加工。
3.1指導思想與組織機構
公司本著“質量第一”的方針,為實現(xiàn)本工程建設的優(yōu)質、高速、安全。文
明、低耗的目標而奮斗,為我市建筑業(yè)和城市建設作出應有的貢獻。
3.1.1項目法施工
實施項目法施工的管理模式,組建本工程的項目經(jīng)理部,對工程施工全過程
的進度、質量、安全、成本及文明施工等負全責。項目經(jīng)理部要以工程項目管理
為核心,以優(yōu)質、高速、安全、文明為主軸,加強動態(tài)、科學管理,優(yōu)化生產(chǎn)要
素,精心施工,大力推廣先進施工技術,在創(chuàng)質量優(yōu)良的同時,力爭提前完成施
工任務。在推行項目法施工的同時,從文件控制、材料采購到產(chǎn)品標識、過程控
制等過程中,切實執(zhí)行IS09001標準和公司質量保證體系文件,達到創(chuàng)優(yōu)質高效
的目標。
在本工程施工中實施項目法管理,項目經(jīng)理對工程項目行使計劃、組織、協(xié)
調、控制、監(jiān)督、指揮職能、全權處理項目事務,其下設技術組、經(jīng)營組及材料
設備組。項目經(jīng)理部對公司實行經(jīng)濟責任承包。項目內部工程技術管理人員通過
崗位目標責任制和行為準則來約束,共同為優(yōu)質、安全、高速、低耗地完成項目
任務而努力工作。
項目經(jīng)理部對工程項目進行計劃管理。計劃管理主要體現(xiàn)在工程項目綜合進
度計劃和經(jīng)濟計劃,項目經(jīng)理部的進度計劃包括:施工總進度計劃,分部分項工
程進度計劃,施工進度控制計劃,設備供應進度計劃,竣工驗收和試生產(chǎn)計劃。
經(jīng)濟計劃包括:勞動力需用量及工資計劃,材料計劃,構件及加工半成品需用量
計劃,施工機具需用量計劃,工程項目降低成本措施及降低成本計劃,資金使用
計劃,利潤計劃等。
3.1.1組建項目經(jīng)理部
本工程擬實行項目法施工管理,委派我公司實踐經(jīng)驗豐富和管理水平高的同
志擔任項目部主要負責人,選聘技術、管理水平高的技術人員、管理人員、專業(yè)
工長組建項目部(見下表)。項目管理層由項目經(jīng)理、項目副經(jīng)理、技術負責人、
安全主管、材料主管和工程質量組成員組成,在建設單位、監(jiān)理單位和公司的指
導下,負責對本工程的工期、質量、安全、成本等實施計劃。組織、協(xié)調、控制
和決策,對各生產(chǎn)施工要素實施全過程的動態(tài)管理。
作業(yè)層人員的配備:施工人員均挑選有豐富施工經(jīng)驗和勞動技能的正式工和
合同工,分工種組成作業(yè)班組,挑選技術過硬、思想素質好的正式職工帶班。
3.1.3組織管理模式及各負責任職責
表3-1組織機構表
序號職務姓名職務、職稱學歷
1項目經(jīng)理
序號職務姓名職務、職稱學歷
1項目副經(jīng)理
3項目技術負責人
4質量安全部
5水電安裝部
6材料部
7設備部
8專職安全員
組織管理模式如圖3T
項目經(jīng)理
材
質
技
料
檢
術
員
員
員
班組長
操作工人
表3-1管理人員職責責任表
管理
職責范圍
崗位
負責履行本工程的全部合同內容,對工程質量達到合同要求和檢驗
項目
評定標準的要求負責,保證本施工組織設計(項目質量計劃)的順利實
經(jīng)理
施。
管
受項目經(jīng)理委托,負責本施工組織設計(項目質量計?劃)的具體實
理施工
施對工程進度負責,調動人力、物力保證按圖紙和規(guī)范施工,負責糾正
人負責
預防措施的實施,對本工程的準備施工、安裝、交付使用和維修整個過
貝a人
程的控制、管理、監(jiān)督、改進負責。
職
技術對施工圖紙、技術資料、項目質量文件、記錄的控制和管理負責審
責
負責批工程的技術交底等技術文件,負責設計變更等的簽證和實施,對審核
人結果制定糾正或預防措施。
材料編制本工程的材料采購計劃,并按規(guī)定實施,對進場材料的質量負
責,負責本工程施工機械的進出廠,并對保證機械能力負責。
負責
人
負責對本工程的質量監(jiān)督、檢查,對隱蔽工程驗收分部分項工程的
質檢員
質量評定工序交接檢等負責,監(jiān)督并確認對工程質量的錯檢、漏檢負責。
負責本工程安全施工方案的實施,保證安全施工,對安全隱患的錯
安全員
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 【全程復習方略】2020-2021學年高中數(shù)學(人教A版選修2-2)練習:全冊綜合質量評估
- 動物兒歌一年級下冊
- 2025年八年級統(tǒng)編版語文寒假預習 第07講《馬說》
- 【走向高考】2021屆高考歷史(人民版)一輪復習強化作業(yè)精煉:第14講-新興力量的崛起
- 專升本英語考試題型
- 期末測評卷(一)(Lesson10 ~ 12)綜合測評卷 2024-2025學年科普版(三起)英語五年級上冊 (含答案)
- 【名師一號】2021年人教版物理雙基限時練-必修二:第七章-5探究彈性勢能的表達式
- 《創(chuàng)新作文指導》課件
- 2025年廣東省高中學業(yè)水平考試綜合測評卷(一)化學試題(含答案)
- 【備戰(zhàn)2021高考】全國2021屆高中地理試題匯編(11月份):M2中國地理
- 北師大版七年級數(shù)學上冊 期末重難點真題特訓之易錯必刷題型(96題32個考點)(原卷版+解析)
- 2023年公路養(yǎng)護工知識考試題庫附答案
- 高警示(高危)藥品考試試題與答案
- 42山東省棗莊市薛城區(qū)2023-2024學年七年級上學期期末考試生物試題
- 部編版六年級語文下冊第三單元大單元教學設計
- 前端組長述職報告
- 食品安全企業(yè)標準模板
- 鈷酸鋰結構特性
- 臺州造船行業(yè)產(chǎn)值分析
- 2024年度醫(yī)院兒童保健科醫(yī)務人員述職報告課件
- 品牌部工作總結匯報
評論
0/150
提交評論