版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
1、精選優(yōu)質(zhì)文檔傾情為你奉上精選優(yōu)質(zhì)文檔傾情為你奉上專心專注專業(yè)專心專注專業(yè)精選優(yōu)質(zhì)文檔傾情為你奉上專心專注專業(yè)Stuck Pipe Prevention Self-Learning CourseSUGAR LANDLEARNING CENTERStuck Pipe PreventionSELF - LEARNING COURSEUSEFUL PRE-REQUISITES“A Primer of Oilwell Drilling”Sugar Land Learning CenterStuck Pipe Prevention Self-Learning CourseIntroduction to s
2、elf-learning:Self-learning enables you to learn at your pace, in your time and in your way. This coursebook provides the content, structure and organization of your learning which would otherwise be managed by an instructor in a class. It also asks you questions to help you to confirm your understan
3、ding (as the instructor probably would). You will also find a recap section that will be useful for you to review the important points stressed in this book after your training. At the end is a glossary containing the key-words relating to the subject, and the answers to the questions.Structure:Each
4、 section contains: Explanation of the subject, illustrated as much as possible. Questions (the answers are in Appendix B).How to use the course book:Try to do the course in a maximum of 2 hours, with a break.Set yourself in a suitable environment (no noise, no interruptions, etc.).After reading a se
5、ction, use the self-test questions to confirm what you have understood. Write down the answers on a sheet of paper and check the answers at the end of the book. It is your responsibility to answer honestly. If you get an answer wrong, go back to the section indicated and review the subject.A few day
6、s later, or at any moment, use the recap section and the glossary to refresh your knowledge of the subject.Remember:Learning is your responsibility. This book provides you with a good preparation beforethe seminar to the Sugar Land Learning Center and gives you a chance to learn more by not struggli
7、ng with the basics.Sugar Land Learning CenterPage 2Revised: December 1999Stuck Pipe Prevention Self-Learning CourseTable of ContentsIntroduction 51. What is a “Stuck Pipe” ? 72. Mechanisms 92.1 Differential Sticking 112.2 Inadequate Hole Cleaning 162.3 Chemically Active Formations 182.4 Mechanical S
8、tability 202.5 Fractured/Faulted Formation 222.6 Overpressured Formations 242.7 High Dip Sloughing 262.8 Unconsolidated Formations 282.9 Mobile Formations 302.10 Undergauge Hole 322.11 Key Seating 342.12 Wellbore Geometry 362.13 Junk 382.14 Collapsed Casing 392.15 Cement related 402.15.1 Cement Bloc
9、ks 402.15.2 Green Cement 41Questions: Mechanisms 433. Prevention 453.1 Planning 473.2 Monitoring at the Well site 48Questions: Prevention 524. Recap section 534.1 Summary 55Appendix A : Glossary 61Appendix B : Answers to Questions 63Sugar Land Learning CenterPage 3Revised: December 1999Stuck Pipe Pr
10、evention Self-Learning CoursePage intentionally left blankSugar Land Learning CenterPage 4Revised: December 1999Stuck Pipe Prevention Self-Learning CourseIntroductionWelcome to the Stuck Pipe Prevention self learning course. Stuck pipe is one of the mostimportant problems you will find in the oil-in
11、dustry. This book will introduce you to stuck pipe, explain the different mechanisms and how to prevent stuck pipe. After completion of this self-learning course, you will find more information in the IWOB self- learning package, relating to SPIN. Also refer to the Sedco Forex “ Drillers Stuck Pipe
12、Handbook”.TSBTT1 and T2, tension :the drill pipe is always in tension when drilling.S, side force :when 2 surfaces are in contact with a perpendicular side force acting between them, any attempt to move one surface relative to the other will result in a friction force resisting the motion.B, buoyant
13、 weight :apparent weight of the element in the mud.Figure 1Sugar Land Learning CenterPage 5Revised: December 1999Stuck Pipe Prevention Self-Learning CoursePage intentionally left blankSugar Land Learning CenterPage 6Revised: December 1999Stuck Pipe Prevention Self-Learning Course1. What is a “Stuck
14、Pipe” ?Drilling a well requires a drill string (pipe & collars) to transmit the torque provided atthe surface to rotate the bit, and to transmit the weight necessary to drill the formation. The driller and the directional driller steer the well by adjusting the torque, pulling and rotating the drill
15、 string.When the drill string is no longer free to move up, down, or rotate as the driller wants itto, the drill pipe is stuck. Sticking can occur while drilling, making a connection, logging, testing, or during any kind of operation which involves leaving the equipment in the hole.We can define:MO,
16、 maximum overpull : the max. force that the derrick, hoisting system, or drill pipecan stand, choosing the smallest one.BF, background friction : the amount of friction force created by the side force in the well.FBHA :The force exerted by the sticking mechanism on the BHA(Bottom Hole Assembly)The d
17、rill string is stuck ifBF + FBHA MOIn other words, the drill string is stuck when the static force necessary to make it moveexceeds the capabilities of the rig or the tensile strength of the drill pipe. Stuck pipe can result in breaking a part of the drill string in the hole, thus losing tools in th
18、e hole.A few variables must be taken into account when dealing with stuck pipe: pore pressureof the formation, mud system, and the depth versus time (the longer in the hole without action, the more likely to get stuck).The consequences of a stuck pipe are very costly. They include:Lost drilling time
19、 when freeing the pipe.Time and cost of fishing: trying to pull out of the hole the broken part of the BHA.Abandon the tool in the hole because it is very difficult or too expensive to remove it.In that case the oil company pays Anadrill to replace the tool.To give you an idea, an average cost per w
20、ell of sticking pipe is about $50 000 US. Ourservice is to avoid the costly loss of the BHA (bottom hole assembly) to the client. Our responsibility is to protect the Anadrill tools contained in the BHA.Question 1 : What is a stuck pipe ?Sugar Land Learning CenterPage 7Revised: December 1999Stuck Pi
21、pe Prevention Self-Learning CoursePage intentionally left blankSugar Land Learning CenterPage 8Revised: December 1999Stuck Pipe Prevention Self-Learning Course2.MechanismsSugar Land Learning CenterPage 9Revised: December 1999Stuck Pipe Prevention Self-Learning CoursePage intentionally left blankSuga
22、r Land Learning CenterPage 10Revised: December 1999Stuck Pipe Prevention Self-Learning Course2.1 Differential StickingDifferential sticking is one of the most common causes of pipe sticking. It is due to ahigher pressure in the mud than in the formation fluid. Differential sticking happens when the
23、drill collar rests against the borehole wall, sinking into the mudcake. The area of the drill collar that is embedded into the mudcake has a pressure equal to the formation pressure acting on it. The area of the drill collar that is not embedded has a pressure acting on it that is equal to the hydro
24、static pressure in the drilling mud. This is shown in Fig. 2. When the hydrostatic pressure (Ph) in the well bore is higher than the formation pressure (Pf) there will be a net force pushing the collar towards the borehole wall.Overpull due to differential pressure sticking can be calculated from th
25、e product of thedifferential pressure force times the friction factor:Overpull = Fdp fwhere Fdp = differential pressure force psi/in2 and f = friction factor.(1)The differential pressure force is the difference in hydrostatic force and the formationforce acting on the drill collar. The hydrostatic f
26、orce is the hydrostatic pressure times the cross sectional area that is in the borehole and the formation force is the formation pressure times the cross sectional area that the mud cake is in contact with. This is shownin Fig. 3. Note that the cross-section area is used to calculate the force but n
27、ot the surface area of the drill collar. The differential pressure force is defined:Fdp 144 in2 / ft 2 Amc ( Ph Pf )(2)where Fdp = differential pressure force lbf, Amc = cross section embedded in mud cakeft2, Ph = hydrostatic pressure psi, and Pf = formation pressure psi.The friction factor depends
28、on the formation and the drill collar surface. It varies from0.15 to 0.50.The hydrostatic pressure is defined:Ph TVD 0.433 psi / ft TVD (3)8.33 ppgwhere Ph = hydrostatic pressure psi, TVD = true vertical depth ft, = pressure gradientof the mud psi/ft, and = mud weight ppg. Fresh water has a density
29、of 8.33 ppg andSugar Land Learning CenterPage 11Revised: December 1999Stuck Pipe Prevention Self-Learning Coursea pressure gradient of 0.433 psi/ft. Formation brine in the Gulf of Mexico is 9 ppg, whichis equal to 0.47 psi/ft.Mud cakePhBorehole wallDrillcollarPfFigure 2Differential sticking. Ph is h
30、ydrostatic pressure and Pf is formationpressure.Hydrostatic forceDiameter ofdrill collarFormation forceCross sectionin mud cakeFigure 3Hydrostatic force and formation force that are acting on the drill collar.Sugar Land Learning CenterPage 12Revised: December 1999The thickness of the filter cake is
31、critical in differential sticking. The thicker the filter cake the bigger is the cross sectional area that the formation pressure acts on (see Fig. 3). Thus, the differential sticking force is higher when the mud cake is thicker. When the well bore pressure is higher than the formation pressure some
32、 of the mud filtrate (“mud filtrate” is the liquid phase of the drilling mud) will invade the formation if it is permeable and porous. Thus, a mud cake will build up on the surface of the well bore. The thickness of the mud cake depends on the mud properties and the porosity of the formation. At a c
33、ertain point the mud cake will become thick enough to act as a barrier to stop further seeping of the mud filtrate into the formation and the mud cake will then stop growing. If the mud has a lot of drill solids then the filter cake will be more porous and permeable resulting in a thicker mud cake a
34、nd faster growth. The ideal situation would be a thin, hard mud cake made up of mud solids only. The danger of differential sticking is usually present in a sand. Sand formations usually have high porosity and permeability and therefore a thick mud cake tends to build up.Stuck Pipe Prevention Self-L
35、earning CourseThe formation pressure is usually not known. There is no direct way of calculating it likethe hydrostatic pressure. Usually, there is an estimation of the pressure gradient for the formation that is being drilled. That value can then be used to estimate the formation pressure.Stationar
36、y pipeIf the drill pipe is not moved for a period of time the filter cake tends to build up around itand then add to the differential sticking force that is holding the drill collars. This is shown in Fig. 4. The mud cake forms a bridge between the drill collar and the mud cakein the hole.Filter Cak
37、e ErosionFilter cake erosion happens when the drill pipe rubs against the borehole wall. This onlyaffects a small portion of the circumference of the wellbore. Wiper trip erosion happens when the stabilizers and the bit are pulled through the mud cake and a significant amountof it is scraped off. Mo
38、st of the mud cake is removed when the hole is reamed. Filter cake erosion is shown in Fig. 5.Sugar Land Learning CenterPage 13Revised: December 1999Stuck Pipe Prevention Self-Learning CourseBridgingMud cakeBorehole wallDrillcollarFigure 4Bridging occurs when the drill collar is left stationary.Dril
39、l pipe erosionWiper trip erosionReaming erosionMud cakeDrill pipeFigure 5Three types of filter cake erosion: Drill pipe erosion, wiper trip erosion, andreaming erosion.Sugar Land Learning CenterPage 14Revised: December 1999Stuck Pipe Prevention Self-Learning CourseWarning SignsIncreasing overpull in
40、 long connections.Overpull and torque increases when drillstring is stationary for some time. Overpull decreases after reaming.IdentificationThe pipe was stationary before it got stuck.Full circulation is possible. BHA adjacent to thick sand.Hydrostatic pressure overbalance.Preventive ActionKeep tra
41、ck of differential pressure in sands if possible.Dont stop too long for a survey. If necessary continue drilling after the precursor comes up.Keep the mud weight under control. Use a short BHA.Make frequent wiper trips.Sugar Land Learning CenterPage 15Revised: December 1999Stuck Pipe Prevention Self
42、-Learning Course2.2 Inadequate Hole CleaningIf the cuttings are not removed from the well properly, they will settle around the drillstring, usually the BHA, causing the drill collars to become stuck. The problem is worsein overgauge hole sections where the annular velocity is lower. Cuttings will b
43、uild up and eventually slump in the hole.The cuttings are scraped by the stabilizers and the bit when the BHA is moved up the holeat a connection or a trip out. The cuttings accumulate in front of the bit and stabilizers as seen in Fig. 6. The overpull will increase until the cuttings will stick the
44、 BHA.The hole cleaning differs with the inclination of the hole. The annular velocity required toclean the hole increases with inclination. Figure 7 shows the behavior in holes at different inclinations.Warning SignsInsufficient cuttings on shaker.Excessive overpull at connections and trips. Reduced
45、 overpull when pumping.Increase in pump pressure and pressure spikes when hole momentarily plugs up. Pump pressure much higher than predicted using hydraulics program.IdentificationStuck shortly after pumps are shut off.Circulation lost.Preventive actionCirculate all cuttings out before tripping out
46、.If motor is used, rotate before tripping out of hole.Keep the pumps running. Might be impossible to take survey at the moment. The ROP can be lowered to reduce the amount of cuttings.Check shale shakers to see if the cuttings are being removed.Sugar Land Learning CenterPage 16Revised: December 1999
47、Stuck Pipe Prevention Self-Learning CourseCuttings accumulate onthe low side of the holeCuttings accumulate above bitand stabilizers when pulling outFigure 6Cuttings collect around the BHA and increase the overpull.Zone 1Efficient hole cleaningZone 4Zone 2Good hole cleaningwith moving cutting bedsZo
48、ne 3Slow removalof cuttingsSome holecleaning, cuttingsbed formedZone 5No hole cleaning0306090Inclination (Degrees)Figure 7Flow pattern of cuttings in deviated wells.Sugar Land Learning CenterPage 17Revised: December 1999Stuck Pipe Prevention Self-Learning Course2.3 Chemically Active FormationsDiffer
49、ent formations have a different degree of absorbing water. It is thus important for afield engineer to understand the characteristics of the formations that have and will be drilled. Some high clay content rocks absorb water and swell. The amount of swelling varies from highly reactive “gumbo” (fast
50、 absorption rate) to shales, which absorb water very slowly.When drilling with water based mud, the water is absorbed into these types of formations(commonly shales), causing them to swell and weaken. As a result, chunks of shale will break-off and fall into the borehole. The water-absorbed (hydrate
51、d) shale tends to stick to the drill string and accumulate in sufficient quantities to fill the entire annulus around the BHA, causing it to become stuck.Warning SignsLarge clumps of hydrated shale (gumbo) coming out of the hole.Drilling rate is slower as less weight gets to the bit. BHA packed off
52、with gumbo (inspected at trips). Increase in pump pressure.Increase in torque as the hole size is reduced due to swelling.IdentificationCannot circulate mud.Sticking can occur during any operation while in open hole.Preventive ActionMinimize time in open hole.Maintain mud inhibitors at high enough l
53、evels. Minimize length of BHA and open hole sections.Avoid additional open hole operation such as wireline logging, survey runs, etc.Sugar Land Learning CenterPage 18Revised: December 1999Stuck Pipe Prevention Self-Learning CourseFigure 8Migration of water into the formation, causing the swelled sha
54、le to collapseand accumulate around the BHA.Sugar Land Learning CenterPage 19Revised: December 19991. Vertical Stresses: At depths greater than 1,500 feet, the largest stress on a rock formation is usually the stress imposed on it from the weight of all material above it, which acts in the vertical
55、direction. A typical value of these stresses are 1.0 psi/ft.2. Side Stresses: The side stresses which act in the horizontal component in both directions. A typical value of these stresses is 0.75 psi/ft.Stuck Pipe Prevention Self-Learning Course2.4 Mechanical StabilityIt can be difficult to determin
56、e whether swelling shale is primarily due to a chemicalimbalance or mechanical stability, or even a little bit of both.Before the drill bit enters a section of the hole, the rock supports three unequal stresses infour different directions. These are:The drilling process effectively replaces the cyli
57、nder of rock with mud. Usually, the mudweight is balanced to the pore pressure of the formation, however in some instances the mud weight cannot totally support the borehole pressure. The rock around the borehole is forced to act as extra support.If the formation is strong, then there will be no pro
58、blem. However, in younger formations,where the rock is not strong, the rock will not be able to support this extra stress. The rock will deform and the wellbore will begin to contract in a small amount.Warning SignsLarge cuttings, low shale strength.Tight hole over long sections during trip. Large o
59、verpulls due to cavings.Increase in pump pressure due to cavings in borehole. Slower drilling rate.IdentificationCirculation restricted or impossible.Sticking can occur during any operation while in open hole.Preventive ActionGradually increase mud weight.Follow hole cleaning procedures.Complete eac
60、h hole section fast, therefore minimize time in hole.Sugar Land Learning CenterPage 20Revised: December 1999Stuck Pipe Prevention Self-Learning CourseVerticalSideSideVerticalFigure 9Insufficient mud weight to keep the hole from contractingSugar Land Learning CenterPage 21Revised: December 1999Stuck
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 蘇科版八年級(jí)物理下冊(cè)《第八章力與運(yùn)動(dòng)》單元檢測(cè)卷及答案
- 人教版七年級(jí)數(shù)學(xué)下冊(cè)全冊(cè)導(dǎo)學(xué)案
- 廣東省深圳市福田區(qū)2024年中考數(shù)學(xué)三??荚囋嚲砀酱鸢?/a>
- 《誡子書》復(fù)習(xí)課
- 中小學(xué)機(jī)房作品管理系統(tǒng)的開發(fā)與應(yīng)用研究
- 高一化學(xué)二第二章第二節(jié)化學(xué)能與電能練習(xí)
- 2024屆安徽省巢湖市某中學(xué)高考仿真模擬化學(xué)試卷含解析
- 2024高中地理第3章地理信息技術(shù)應(yīng)用第4節(jié)數(shù)字地球精練含解析湘教版必修3
- 2024高中物理第二章交變電流第六節(jié)變壓器達(dá)標(biāo)作業(yè)含解析粵教版選修3-2
- 2024高中語文第一單元以意逆志知人論世湘夫人訓(xùn)練含解析新人教版選修中國古代詩歌散文欣賞
- 綿陽市高中2022級(jí)(2025屆)高三第二次診斷性考試(二診)歷史試卷(含答案)
- 《視頻壓縮基礎(chǔ)》課件
- 2025南方財(cái)經(jīng)全媒體集團(tuán)校園招聘63人高頻重點(diǎn)提升(共500題)附帶答案詳解
- 《A機(jī)場(chǎng)公司人力資源管理工作實(shí)踐調(diào)研報(bào)告》2600字(論文)
- 社工人才培訓(xùn)計(jì)劃實(shí)施方案
- 四年級(jí)數(shù)學(xué)(上)計(jì)算題專項(xiàng)練習(xí)及答案
- 6、水平四+田徑18課時(shí)大單元計(jì)劃-《雙手頭上前擲實(shí)心球》
- 軍事理論(2024年版)學(xué)習(xí)通超星期末考試答案章節(jié)答案2024年
- 青島版科學(xué)四年級(jí)下冊(cè)課程綱要
- 部編人教版六年級(jí)下冊(cè)語文1-6單元作文課件
- NB/T 11434.5-2023煤礦膏體充填第5部分:膠凝材料技術(shù)要求
評(píng)論
0/150
提交評(píng)論